Responds to IE Bulletin 80-13.No Cracking Indications Noted in Unit 1 Core Spray Sparger or in-vessel Piping.Unit 2 Insp Will Be Performed at Next Refueling Outage
ML19330B157
Person / Time
Site: Brunswick  
Issue date: 07/15/1980
From: Furr B
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-80-13, NO-80-1046, NUDOCS 8007300561
Download: ML19330B157 (1)


Text

...e

ngpgL Carolina Power & Light Cgmpany g,1'yJ2{lydN'lb0 FILE: NG-3513 (B)

SERIAL: NO-80-1046 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, GA 30303 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1&2 LICENSE NOS. DPR-71 AND DPR-62 DOCKET NOS. 50-325 AND 50-324 RESPONSE TO IE BULLETIN 80-13

Dear Mr. O'Reilly:

In response to your letter of May 12, 1980, transmitting IE Bulletin 80-13, Carolina Power & Light Company submits the following information:

The Brunswick Steam Electric Plant Unit No. 1 core spray spargers and in-vessel piping have been visually inspected using Periodic Test 90.1, and no indication of cracking was noted. At the time of receipt of the bulletin, refueling operations had been completed and the vessel head installed on Brunswick Unit No. 2.

For this reason, the Unit 2 inspection will be performed at its next refueling outage.

As requested in the bulletin, each unit will be inspected during all future refueling outages until further notice with a follow-up report to be issued within thirty (30) days of the completion of the test.

Very truly yours, B. J. Furr Vice President Nuclear Operations RMP/DCS/tma*