ML19330A962

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-328/80-13 on 800522 & 23.No Noncompliance Noted
ML19330A962
Person / Time
Site: Sequoyah 
Issue date: 06/19/1980
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19330A963 List:
References
NUDOCS 8007290846
Download: ML19330A962 (2)


See also: IR 05000328/1980013

Text

, - -

_

-

'

%o,% -

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

g

i

$

E

REGION 11

V N8M

I

'#

o,

101 MARIETTA ST

N.W.. SUITE 3100

'g

ATLANTA. GEORGIA 303o3

9. * *

WN 1 S 1330

In Reply Refer To:

RII:ALC

50-328/80-13

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by A. L. Cunningham of this office on

fby 22-23, 1980, of activities authorized by NRC Construction Permit No. CPPR-73

far the Sequoyah facility, and to the discussion of our findings held with

R. H. Shell at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, _he inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

'

) . ' ' ,

0

1

-

-

. Philip St

r, Chief

,

Fuel Facili

and Materials

Safety Branch

Enclosure: See Page 2

.8 0 0 7 2 9 0 $4{(,

Y

- - - -

_ _ _ _ - _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ .

.

1

JENW 191980

I

Tennessee _ Valley Authority

-2-

Enclosure:

Inspection Report No. 50-590/80-13

cc w/ enc 1:

>

G. G. Stack, Project Manager

P. O. Box 2000

Daisy, TN 37319

J. M. Ballentine

Plant Superintendent

P. O. Box 2000

Daisy, TN 37319

J. F. Cox

400 Commerce Street

W10C131 C-K

Knoxville, TN 37902

(

M. J. Burzynski, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

T. B. Northern

Construction Engineer

Post Oifice Box 2000

Spring City, TN 37381

t

H. N. Culver

249-A HBB

400 Commerce Avenue

1

Knoxville, TN 37902

.

<

I

,