Sa nfor UNITED STATES
/
NUCLEAR REGULATORY COMMIS0 TON o
,f f,,%
RE2IIN 1 D-f
$31 PARK AVENUE C,
f niNo oP PRussi A. PENNsVLVANI A 19406
, Docket No. 50-471 Boston Edison Company ATTN:
Mr. R. M. Butler NuclearProjectsManager 800 Boylston Street Boston, Massachusetts 02199 Gentlemen:
The enclosed IE Information Notice No. 80-28, " Prompt Reporting of Information in Accordance with 10 CFR 50.55(e)", is forwarded to you for information.
No written response is required.
If you desire additional information regarding this matter, please contact this office.
Sincerely, Bo ce H. Grier Director
Enclosures:
1.
IE Information Notice No. 80-28 2.
List of Recently Issued IE Information Notices CONTACT:
R. W. McGaughy (215-337-5281) a cc w/encis:
J. E. Howa'.d, Vice President - Nuclear W. M. Sides, Quality Assurance Manager l
l l
$7b l
800p so g
j ENCLOSURE 1 SSINS No.: 6835 UNITED STATES A: cession No.:
NUCLEAR REGULATORY COMftISSION 8005050063 0FFICE OF INSPECTION AND ENFORCEf1ENT n
y" WASHINGTON, D.C.
20555 IE Information"kokice No. 80-28 Date: June 13, 1980 Page 1 of 1 PROMPT REPORTING OF INFORMATION IN ACCORDANCE WITH 10 CFR 50.55(e)
The recently implemented expansion of the NRC Resident Inspection Program at nuclear power plants and fuel facilities, has led to some misunderstandings regarding the required reporting of information to the NRC.
In order to clarify this matter, the following is provided for your information.
Some licensees have been making the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> reports required by 10 CFR 50.55(e)(2) orally to NRC resident inspectors.
This does not satisfy either the letter or the intent of the regulation. Adherence by all licensees to the explicit requirements of the regulation, which provides for a single focal point for reporting within each Regional Office, minimizes the possibility of inad-vertent oversight. While we continue to enlist your cooperation in fully informing our resident inspectors, where appropriate, or any other NRC inspector who may be at your facility at such a time, such informational exchanges do not satisfy the reporting requirements of 10 CFR 50.55(e)(2).
Your cooperation in assuring that the appropriate members of your staff are fully rue of this information will be appreciated.
No written response to this information notice is required.
If you require additional information regarding this matter contact the Director of the appropriate NRC Regional Office.
t.
IE Information Notice No. 80-28 June 13, 1980 RECENTLY ISSUED IE INFORMATION NOTICES Information Subject Date Issued To Notice No.
Issued 80-27 Degradation of Reactor 6/11/80 All Pressurized Water Coolant Pump Studs Reactor Facilities holding power reactor OLs or cps 80-26 Evaluation of Contractor 6/10/80 All Part 50 Licensees QA Programs 80-25 Transportation of 5/30/80 Material Licensee in Pyrophoric Uranium Priority / Categories II-A, II-0, III-I and IV-DI; Agreement State Licensees in equivalent categcries 80-24 Low Level Radioactive 5/30/80 All NRC and Agreement Waste Burial Criteria State Licensees 80-23 Loss of Suction to 5/29/80 All power reactor to Emergency Feedwater facilities with an Pumps OL or CP 80-22 Ereakdown In Contamination 5/28/80 All power reactor Control Programs Ols and near term cps 80-21 Anchorage and Support of 5/16/80 All power reactor Safety-Related Electrical facilities with an Equipment OL or CP 80-20 Loss of Decay Heat Removal 5/8/80 All light water reactor Capability at Davis-Besse facilities holding Unit 1 While in a Refueling power reactor OLs or cps Mode 80-19 NIOSH Recall of Recircu-5/6/80 All holders of a power lating-Mode (Closed-Circuit) reactor OL, Research Self-Contained Breathin Reactor License, Fuel Apparatus (Rebreathers)g Cycle Facility License and Priority I Material License 1