Text
.
.
..
. . . -
[M
I
%
UNITED STATES
d -S5L7"
'
8
NUCLEAR REGULATORY COMMISSION -
n
..
g
ar
REGION 11
o
101 MARIETTA ST N.W SUITE 3100
o
ATLANTA. GEORGIA 30303
JUN 0 21980
- In Reply Refer To:
..
RII:VIC
50-327/80-16
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by W. T. Cottle of this office on April 8
through 30, 1980 of activities authorized by NRC Operating License No. DPR-77
for the Eequoyah facility, and to the discussion of our findings held with J. M.
Ballentine at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
Corrective actions to prevent recurrence were completed prior to
the conclusion of this inspection; therefore, a reply is not requested.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contr;.: tor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
nation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
E.c.
R. C.
ewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosures:
See Page 2
, ,-
8007170Md
9
._
_
.
JUN 0 21980
,
Tennessee Valley Authority
-2-
-
.
Enclosures:
1.
Appendix A, Notice of Violation
,
2.
Inspection Report No. 50-327/80-16
"
.
cc w/ enc 1:
G. G. Stack, Project Manager
P. O. Box 2000
Daisy, TN 37319
J. M. Ballentine
Plant Superintendent
P. O. Box 2000
Daisy, TN 37319
'
J. F. Cox
400 Commerce Street
W10C131 C-K
Knoxville, TN 37902
M. J. Burrynski, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401
T. B. Northern
Construction Engineer
Post Office Box 2000
Spring City, TN 37381
H. N. Culve-
249-A HBB
400 Commerce Avenue
Knoxville, TN 37902
.
" ..
.
J.
4
,
_
-
-