|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20149F8321994-09-0707 September 1994 Responds to to D Rathbun,Requesting That NRC Look Into Matter of Licensing of Nuclear Fuel Reprocessing Plant at Barnwell,Sc ML20149F8331994-08-18018 August 1994 Forwards Info Received from Constituent WR Ripley Re Difficulty W/Info Concerning Nuclear Fuel Reprocessing Plant at Barnwell,Sc,For Response ML20096F0981992-05-12012 May 1992 Ack Receipt of Re NRC Pending Decision of Barnwell Nuclear Fuel Plant,Barnwell,Sc.Licensee Does Not Intend to Provide Addl Info in Support of Request for Continuation of Construction Permit CPCSF-4 ML20082B9251991-07-11011 July 1991 Forwards Corrections & Clarifications of Several Factual Matters in Commission Paper SECY-91-021 Re Const License for Barnwell Nuclear Fuel Plant,Per Allied-General Nuclear Svcs Exam of Documents Transmitted by NRC ML20070P9001991-03-21021 March 1991 Responds to 910228 Request for Addl Info Re Consequences of Extending CP CPCFS-4.Vendor Does Not Intend to Pursue Const Activities at Present Time.Possible Sale/Transfer of Facility to DOE or Govt Contractors Discussed ML20029B1781991-02-28028 February 1991 Requests Addl Info Re 900711 Request to Extend Const Permit for Separations Facility of Barnwell Nuclear Fuel Plant. Info Needed Re Intended Const Activites If Date Extended & long-range Plans.Requests Info Be Submitted by 910401 ML20055G5181990-07-19019 July 1990 Forwards Ltr from Allied-General Nuclear Svcs Re CP CPCSF-4 ML20055G5831990-07-11011 July 1990 Requests Further Extension Until 930930 or Earlier as Result of Various Uncertainties Existing Re Nuclear Waste Program Including Govt Plans in Area of Savannah River Plant ML20147F5551987-11-16016 November 1987 Expresses Disappointment W/Nrc Decision to Adopt Rule Change Re Licensing of Nuclear Power Plant W/O Participation of State & Local Govts in Emergency Evacuation Planning. Served on 871201 ML20237L3851987-08-25025 August 1987 Forwards from Allied-General Nuclear Svcs Re Status of CP for Plant Separations Facility ML20237L4141987-08-20020 August 1987 Requests That Further Extension Be Granted to 900930 for Completion of Const ML20236B0461987-07-21021 July 1987 Forwards Affidavit of LC Rouse Re Plant CP & Regulations for Issuance of Ol,Per Request.Content of Affidavit Based on Mod of Recipient 870716 Draft ML20215L2441987-03-25025 March 1987 Informs That AF Ritardi Replaced Cl Tuch as Official Contact on Matters Re CPCSF-4.AF Ritardi Address Listed ML20235F1741987-01-21021 January 1987 Submits New Mailing Address for All Correspondence Re Facility Due to Author Retirement ML20209E3511986-08-0505 August 1986 Forwards Notice of Name Change of Partners in Valley Pines Assoc Re Separations Facility at Barnwell Nuclear Fuel Plant ML20097G2571984-08-20020 August 1984 Forwards Allied-General Nuclear Svcs Re Status of CP for Separations Facility of Barnwell Nuclear Fuel Plant ML20097G2761984-08-15015 August 1984 Requests Extension Until 870930 for Const Completion. Extension Requested Based on Chem Nuclear Desire to Purchase Strip of Property ML20090H8341984-04-0202 April 1984 Forwards Remaining Info Required for Amend of State Matls License,For Possession Only ML20084R6871984-03-30030 March 1984 Advises That Effective 840330 Author,Will Be Retiring from Allied General Nuclear Svcs.After 840330,correspondence Should Be Addressed to C Nielsen,Vice President,Allied Chemical Nuclear Products,Inc ML20088A4771984-01-26026 January 1984 Forwards Consultant Final Rept:Barnwell Nuclear Fuel Plant Decommissioning Project & Rept of Radiological Overview Survey for Barnwell Nuclear Fuel Plant Decommissioning Project. Matls Inventory Also Encl ML20083H0221983-12-14014 December 1983 Responds to IE Bulletin 83-07 & 83-07,Suppl 1, Apparently Fraudulent Products Sold by Ray Miller,Inc. No Subj Matl Installed in safety-related Sys at Facility ML20083H1411983-12-13013 December 1983 Forwards Application to Amend State of Sc Radioactive Matls License 144 & to DOE Summarizing Current Status of Shutdown Activities ML20083G7291983-12-13013 December 1983 Responds to IE Bulletin 83-07 & 83-07 Suppl 1, Apparently Fraudulent Products Sold by Ray Miller,Inc. No Subj Matl Installed at Facility.Matl in Stock Identified,Isolated & Tagged B10639, Forwards Addl Reporting Criteria for Unplanned Liquid Radioactive Releases.New Criteria Cover Specific Types of Potential Liquid Releases Not Presently Covered.Response Requested by 8304031983-01-21021 January 1983 Forwards Addl Reporting Criteria for Unplanned Liquid Radioactive Releases.New Criteria Cover Specific Types of Potential Liquid Releases Not Presently Covered.Response Requested by 830403 ML20028C6411982-12-0303 December 1982 Informs That Partnership Name of Ga Co Changed to Valley Pine Associates.Certified Copy of Filing & Affidavit Encl ML20070A9601982-11-17017 November 1982 Ack Receipt of IE Insp Rept 50-332/82-03.No Proprietary Info ML20027A9461982-08-30030 August 1982 Ack Receipt of IE Insp Rept 50-332/82-02.No Proprietary Info ML20065C2301982-08-16016 August 1982 Requests Extension of Const Completion Date Until 830930 ML20062A7901982-06-0101 June 1982 Expresses Appreciation for Hospitality Extended During Mar & Apr Site Visits to Review Safeguards Sys ML20039C8401981-11-23023 November 1981 Requests Extension Until 820930 of Completion Date for Facility.No Action Was Taken by Commission on 781109 Request for Extension to 811231 ML19353A3401980-12-10010 December 1980 Ack Receipt of IE Insp Rept 50-332/80-03 on 801015-17.No Proprietary Info ML20002C2521980-11-18018 November 1980 Forwards IE Insp Rept 50-332/80-03 on 801015-17.No Noncompliance Noted ML19347B5691980-10-10010 October 1980 Submits Comments on Resumption of Gesmo Rulemaking on Behalf of Az Public Svc Co,Cp&L,Con Ed & Wi Electric Power Co. Proceeding Would Provide Factual Basis on Which NRC Could Render Independent Judgment on Urgently Needed Issues ML19347C1491980-10-0808 October 1980 Supports Resumption of Gesmo Proceeding as Prelude to Closure of Nuclear Fuel Cycle ML19338F8671980-10-0808 October 1980 Responds to Transmitting J Courtney Request for NRC Resumption of Gesmo Proceedings.J Courtney Comments Will Be Incorporated Into Public Record to Be Considered by NRC ML19347B8871980-09-30030 September 1980 Forwards Suppl 2 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required ML19338E6241980-09-30030 September 1980 Responds to Commission 800807 Order Requesting Comments on Reopening of Gesmo & Other recycle-related Licensing Proceedings.Proceedings Should Be Reactivated & Consistent Position on Use of Energy Initiated ML19295A6331980-09-29029 September 1980 Comments on Rulemaking 50-5:GESMO Proceeding Should Be Rescheduled ML19295A6351980-09-29029 September 1980 Forwards Comments on Behalf of NRDC on Rulemaking 50-5:GESMO Proceedings Should Not Be Reopened ML19337B2671980-09-29029 September 1980 Forwards Comments on Reopening of Gesmo Proceedings Re Rulemaking 50-5:reinstitution of Hearing Reflects Us Interest in Energy Need & Will Establish Framework for Timely Decisions on Reprocessing & Recycling ML19337B2691980-09-26026 September 1980 Comments on Reopening of Gesmo Proceedings Re Rulemaking 50-5:no Further Action Needed Due to Completion of Evidence ML19338E9941980-09-26026 September 1980 Comments on Rulemaking 50-5 Re Reopening of Gesmo & Recycle Related Proceedings.Reopening Record Will Resolve Economic, Environ & Resource Questions Re Fuel Reprocessing ML19338E6321980-09-26026 September 1980 Recommends Reopening of Gesmo Proceedings ML19337B2681980-09-25025 September 1980 Comments on Reopening of Gesmo Proceedings Re Rulemaking 50-5:continuation of Review Process Needed to Determine Whether Reprocessing & Recycling Is Viable Option ML19337B3191980-09-25025 September 1980 Comments on Reopening of Gesmo Proceedings Re Rulemaking 50-5:hearing Must Be Reopened Promptly Due to Need for Establishing Legal & Logical Basis for Evaluation of Spent Fuel Reprocessing ML19295A6411980-09-23023 September 1980 Recommends Resumption of Gesmo Proceedings.Persian Gulf Area Warfare Necessitates Technical Development of Spent Reactor Fuels to Lessen Dependence on Imported Oil ML19337B2721980-09-23023 September 1980 Comments on Reopening of Gesmo Proceedings Re Rulemaking 50-5:reopening & Successful Completion of Hearing Is Logical Precedent to Commercial Reprocessing of Spent Nuclear Fuel ML19336A3731980-09-17017 September 1980 Comments on Rulemaking 50-5:GESMO Proceedings Should Be Reopened.Draft Article Encl Which Should Have Some Input in Forming Policy on Recycling Pu ML19338D2671980-09-15015 September 1980 Comments on Rulemaking 50-5:GESMO Proceedings Should Be Reopened.Technical,Economic & Safety Issues Must Be Addressed in Order for Decisions to Be Made Re Use of mixed- Oxide Fuels ML20040C5131980-09-15015 September 1980 Reiterates 790201 Request That Environmetalist,Inc Be Informed of All Matters Re Barnwell Nuclear Fuel Plant & Barnwell Nuclear Fuel Receiving & Storage Station 1994-09-07
[Table view] Category:NRC TO VENDOR/MANUFACTURER
MONTHYEARML20062A7901982-06-0101 June 1982 Expresses Appreciation for Hospitality Extended During Mar & Apr Site Visits to Review Safeguards Sys ML20002C2521980-11-18018 November 1980 Forwards IE Insp Rept 50-332/80-03 on 801015-17.No Noncompliance Noted ML19347B8871980-09-30030 September 1980 Forwards Suppl 2 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required ML19344B4341980-08-29029 August 1980 Forwards IE Info Notice 80-32, Clarification of Certain Requirements of Exclusive Use Shipments of Radioactive Matls ML19338D5281980-08-21021 August 1980 Forwards IE Circular 80-20, Changes in Safe-Slab Tank Dimensions. No Written Response Required ML19331D2331980-08-14014 August 1980 Forwards IE Info Notice 80-24, Low Level Radwaste Burial Criteria. No Written Response Required.Jh Sniezek 800530 Memo Encl ML19338C8941980-07-28028 July 1980 Forwards IE Insp Rept 50-332/80-02 on 800708-11.No Noncompliance Noted ML19330A3241980-06-24024 June 1980 Forwards IE Circular 80-14, Radioactive Contamination of Plant Demineralized Water Sys & Resultant Internal Contamination of Personnel. No Written Response Required ML19326D6101980-06-18018 June 1980 Forwards IE Bulletin 80-15, Possible Loss of Emergency Notification Sys (ENS) W/Loss of Offsite Power. Written Response Required ML19323F5631980-05-0606 May 1980 Forwards IE Info Notice 80-19, NIOSH Recall of Recirculating-Mode (Closed Circuit) Self-Contained Breathing Apparatus (Rebreather). No Response Required ML19316B0391980-05-0505 May 1980 Forwards IE Info Notice 80-18, Possible Weapons Smuggling Pouch. No Specific Action or Response Required ML19323F3811980-05-0202 May 1980 Forwards 800328 Fr Excerpt Re Proposed Amends to NRC Regulations Specifying Criteria for Determining Whether Amends to OLs or CPs Involve Significant Hazards Consideration.Comment Period Expires 800527 ML19305C0161980-03-14014 March 1980 Forwards IE Info Notice 80-11, Generic Problems W/Asco Valves in Nuclear Applications Including Fire Protection Sys. No Action or Written Response Required ML19210D5101979-11-0909 November 1979 Forwards IE Info Notice 79-12A, Attempted Damage to New Fuel Assemblies. No Action Required ML19254B1161979-09-0707 September 1979 Forwards IE Info Notice 79-20,Revision 1, NRC Enforcement Policy - NRC Licensed Individuals. Notice Reissued to Correct Word Omission & Punctuation Error Which Changed Intent of Statement.Changed Statement Underlined in Text ML19249B4281979-08-14014 August 1979 Forwards IE Info Notice 79-20, NRC Enforcement Policy - NRC Licensed Individuals. No Action Required ML19225B2981979-07-0606 July 1979 Forwards IE Info Notice 79-18, Skylab Reentry. No Action Required ML19276E0831979-02-23023 February 1979 Forwards IE Circular 79-03, Inadequate Guard Training/ Qualification & Falsified Training Records ML19263C5491979-02-0202 February 1979 Forwards IE Info Notice 79-02, Attempted Extortion - Low Enriched U ML19270F0141978-12-14014 December 1978 Forwards IE Insp Rept 50-332/78-06 on 781128-1201.No Noncompliance Noted ML19274C7111978-10-0202 October 1978 Forwards IE Inspec Rept 50-332/78-05 on 780906-07 During Which No Items of Noncompliance Were Noted 1982-06-01
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20149F8321994-09-0707 September 1994 Responds to to D Rathbun,Requesting That NRC Look Into Matter of Licensing of Nuclear Fuel Reprocessing Plant at Barnwell,Sc ML20029B1781991-02-28028 February 1991 Requests Addl Info Re 900711 Request to Extend Const Permit for Separations Facility of Barnwell Nuclear Fuel Plant. Info Needed Re Intended Const Activites If Date Extended & long-range Plans.Requests Info Be Submitted by 910401 ML20236B0461987-07-21021 July 1987 Forwards Affidavit of LC Rouse Re Plant CP & Regulations for Issuance of Ol,Per Request.Content of Affidavit Based on Mod of Recipient 870716 Draft ML20062A7901982-06-0101 June 1982 Expresses Appreciation for Hospitality Extended During Mar & Apr Site Visits to Review Safeguards Sys ML20002C2521980-11-18018 November 1980 Forwards IE Insp Rept 50-332/80-03 on 801015-17.No Noncompliance Noted ML19338F8671980-10-0808 October 1980 Responds to Transmitting J Courtney Request for NRC Resumption of Gesmo Proceedings.J Courtney Comments Will Be Incorporated Into Public Record to Be Considered by NRC ML19347B8871980-09-30030 September 1980 Forwards Suppl 2 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required ML19344B4341980-08-29029 August 1980 Forwards IE Info Notice 80-32, Clarification of Certain Requirements of Exclusive Use Shipments of Radioactive Matls ML19338D5281980-08-21021 August 1980 Forwards IE Circular 80-20, Changes in Safe-Slab Tank Dimensions. No Written Response Required ML19331D2331980-08-14014 August 1980 Forwards IE Info Notice 80-24, Low Level Radwaste Burial Criteria. No Written Response Required.Jh Sniezek 800530 Memo Encl ML19338C8941980-07-28028 July 1980 Forwards IE Insp Rept 50-332/80-02 on 800708-11.No Noncompliance Noted ML19330A3241980-06-24024 June 1980 Forwards IE Circular 80-14, Radioactive Contamination of Plant Demineralized Water Sys & Resultant Internal Contamination of Personnel. No Written Response Required ML19326D6101980-06-18018 June 1980 Forwards IE Bulletin 80-15, Possible Loss of Emergency Notification Sys (ENS) W/Loss of Offsite Power. Written Response Required ML19323F5631980-05-0606 May 1980 Forwards IE Info Notice 80-19, NIOSH Recall of Recirculating-Mode (Closed Circuit) Self-Contained Breathing Apparatus (Rebreather). No Response Required ML19316B0391980-05-0505 May 1980 Forwards IE Info Notice 80-18, Possible Weapons Smuggling Pouch. No Specific Action or Response Required ML19323F3811980-05-0202 May 1980 Forwards 800328 Fr Excerpt Re Proposed Amends to NRC Regulations Specifying Criteria for Determining Whether Amends to OLs or CPs Involve Significant Hazards Consideration.Comment Period Expires 800527 ML19305C0161980-03-14014 March 1980 Forwards IE Info Notice 80-11, Generic Problems W/Asco Valves in Nuclear Applications Including Fire Protection Sys. No Action or Written Response Required ML19210D5101979-11-0909 November 1979 Forwards IE Info Notice 79-12A, Attempted Damage to New Fuel Assemblies. No Action Required ML19254B1161979-09-0707 September 1979 Forwards IE Info Notice 79-20,Revision 1, NRC Enforcement Policy - NRC Licensed Individuals. Notice Reissued to Correct Word Omission & Punctuation Error Which Changed Intent of Statement.Changed Statement Underlined in Text ML19249B4281979-08-14014 August 1979 Forwards IE Info Notice 79-20, NRC Enforcement Policy - NRC Licensed Individuals. No Action Required ML19225B2981979-07-0606 July 1979 Forwards IE Info Notice 79-18, Skylab Reentry. No Action Required ML19261D1161979-04-16016 April 1979 Responds to Describing Unsuccessful Efforts of Group to Be Included in Facility Tour.Tour Was Not Part of NRC Review in Proceedings ML19276E0831979-02-23023 February 1979 Forwards IE Circular 79-03, Inadequate Guard Training/ Qualification & Falsified Training Records ML19263C5491979-02-0202 February 1979 Forwards IE Info Notice 79-02, Attempted Extortion - Low Enriched U ML19270F0141978-12-14014 December 1978 Forwards IE Insp Rept 50-332/78-06 on 781128-1201.No Noncompliance Noted ML19274C7111978-10-0202 October 1978 Forwards IE Inspec Rept 50-332/78-05 on 780906-07 During Which No Items of Noncompliance Were Noted ML20210A8121974-05-0909 May 1974 Forwards List of Licensed Facilities for Processing & Reprocessing Pu & Pending Applications Per 740328 Request. List of Sites W/Plans for Similar Facilities & Licensees Authorized to Possess Pu for Specified Purposes Also Encl 1994-09-07
[Table view] |
Text
_
[
'o UNITED STATES
~g NUCLEAR REGULATORY COMMISSION n
I U
I REClON11 "o
101 MARIETTA ST., N.W.. SulTE 31C0 ATLANTA. GEORGIA 30303 n
JUti 2 41980 In Reply Refer To:
Allied-General Nuclear Services Attn:
R. C. Baxter, President P. O. Box 847 Barnwell, SC 29812 Centlemen:
The enclosed IE Circular No. 80-14 is forwarded to you for information.
If there are any questions related to your understanding of the suggested actions, please contact this office.
Sincerely,
- u. ;3 xV(.g,.
James P. O'Reilly Director
Enclosures:
1.
IE Circular No. 80-14 2.
List of IE Circulars Recently Issued 4
8007170/N Q
SSINS.: 6830 f
UNITED STATES Accession No.:
NUCLEAR REGULATORY COMMISSION 8005050074 0FFICE OF INSPECTION AND ENFORCEMENT
{
WASHINGTON, D. C.
20555 D
'*D
~ * " '
~ "
June 24, 1980 l
IE Circular No. 80-14 RADIOACTIVE CONTAMINATION OF PLANT DEMINERALIZED WATER SYSTEM AND RESULTANT INTERNAL CONTAMINATION OF PERSONNEL This circular describes an event which occurred at a nuclear power facility; however, the generic implications may be applicable to research reactors, and fuel cycle facilities.
On March 17, 1980, a licensee informed the NRC resident inspector that portions of the plant demineralized water (DW) system were found to be radioactively contaminated. A temporary hose used to add demineralized water to the spent fuel pool was the pathway for the cross-contamination. After this fuel pool makeup was completed on March 14, the temporary DW line (still connected to the DW header) was inadvertently left submerged in the fuel pool. Since the DW header pressure at the point of supply was relatively low (a DW booster pump had been secured), a siphoning action occurred, resulting in radioactive contamination of portions of the DW header.
On March 17, 1980, while performing routine secondary system chemical analyses, the licensee discovered that the demineralized water tap in,ghe chemistry lab contained high levels of boron and had activity of 1.5 x 10 uCi/ml (mainly Cs-13', Cs-137, Co-58, Co-60 and Mn-54).
It was subsequently discovered that demineralized water from the chemistry laboratory supply tap had been used to make five (5) pots of coffee. The remaining coffee was confiscated and the twenty-three (23) individuals who had consumed this coffee were whole-body counted. All involved individuals showed no intake greater than an equivalent 0.01 MPC-HRS. Analysis performed by the licensee's radiation consultant, based on the maximum concentration of radioactivity found in the coffee, indicated that the resultant 50-year dose commitment to an individual drinking eight ounces of this coffee would be less than 1 millirem.
Further licensee investigation revealed that the non-radiological chemistry DW supply tap was the only DW supply point outside the Auxiliary Building controlled area. This DW supply tap was tagged prohibiting human consumption to prevent a similar event in the future.
It is recommended that you review your facilities use of demineralized water (LW) via temporary connections and give attention to the following:
1.
Provisions should be made to assure that radioactive materials are not inadvertently introduced into your facility's DW system via the improper use of temporary connections. A temporary cross connection between contaminated systems and the DW system without adequate physical controls to prevent cross-contamination should be prohibited.
s e em.een e mee em T
IE Circular No. 80-14 June 24, 1980 i
Page 2 of 2 2.
In addition to some physical means of preventing backflow into the DW system, appropriate administrative controls should be established to ensure that the DW supply valve is secured and temporary hosing is disconnected from the DW supply header after use.
3.
Use of plant-supplied DW for human consumption should be prohibited.
.The potable water system should be the only authorized source of water for human consumption.
4.
Examine potable and deminera!. ced water systems to determine if pathways exist allowing or having the potential to allow contamination of these systems including temporary connections whereby siphons could cause situations described above.
No written response to this Circular is required. Your review of this matter to determine its applicability to your facility and any corrective and preven-tive actions taken or planned, as appropriate, will be reviewed during a subsequent NRC inspection.
If you desire additional information regarding this matter, contact the Director of the appropriate NRC Regional Office.
+-
f IE Circular No. 80-14 Enclosure sd June 24, 1980 RECENTLY ISSUED IE CIRCULARS Circular Subject Date of Issued to No.
Issue 80-14 Radioactive Contamination 6/24/80 All holders of Power &
of Plant Demineralized Water Research Reactor licenses System & Resultant Internal (OLs & cps) & Fuel Cycle Contamination of Personnel Licenses 80-13 Grid Strap Damage in 5/18/80 All holders of Reactor Westinghouse Fuel Assemblies OLs and cps 80-12 Valve-Shaft-To-Actuator Key 5/14/80 All holders of Reactor May Fall Out of Place When OLs and cps Mounted Below Horizontal Axis 80-11 Emergency Diesel Generator 5/13/80 A'l holders of a power Lube Oil Cooler Failures reactor OL or CP 80-10 Failure to Maintain 4/29/80 All holders of Reactor Environmental Qualification OLs and cps of Equipment 80-09 Problems With Plant Internal 4/28/80 All holders of a power Communications Systems reactor OL or CP 80-08 BWR Technical Specification 4/18/80 All General Electric Inconsistency - RPS Response BWR's holding a power Time reactor OL 80-07 Problems with HPCI Turbine 4/3/80 All holders of a power Oil System reactor OL or CP 80-06 Control and Accountability 4/14/80 Medical licensees in Systems for Implant Therapy Categories G and G1 Sources 80-05 Emergency Diesel-Generator 4/1/80 All holders of a power Lubricating Oil Addition and reactor OL or CP Onsite Supply 80-04 Securing of Threaded Locking 3/14/80 All holders of a power Devices on Safety-Related reactor OL or CP Equipment 80-03 Protection from Toxic Gas 3/6/80 All holders of a Hazards power reactor OL 80-02 Nuclear Power Plant Staff 2/1/80 All holders of Reactor Work Hours OLs, including research and test reactors, and Cfp
....