ML18045A350

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for June 1980
ML18045A350
Person / Time
Site: Palisades 
Issue date: 07/03/1980
From: Meincke J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC COMMISSION (OCM)
Shared Package
ML18045A351 List:
References
NUDOCS 8007110409
Download: ML18045A350 (5)


Text

J consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 July 3, 1980 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of June 1980.

James A Meineke Technical Engineer CC JGKeppler, USNRC KWBerry, P24-207A DPHoffman, P24-115 GHRPetitjean, Palisades CVWaits, Pll-228B DEVanFarowe, Div of Radiological Health Lansing, MI SMierzwa, Mich Dept of Labor RCallen, Mich Public Service Commission Document Control (2) 950-22*35*10 j

OPERATING DATA REPORT DOCKET NO. 50-255 DATE 7/2/80 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 OPERA TING ST A TUS I. Unit Name:

Palisades Notes

2. Reporting Period:
3. Licensed Thermal Power (MWt):

800601 - 800630 2530

4. Nameplate Rating (Gross MWe): __

8~1=-=-1=-. 7,__ ______ _

  • 675
5. Design Electrical Rating (Net MWe): ---"8:...::0:.::5'----------
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
  • 635
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

, I I. Hours In Reporting Period

12. Number Of Hours Reactor Was CritiCal

. 13. Reactor Reserve Shutdown Hours

14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor This Month 720 720 720 1,600,296 498,740 470,439 100.0 Yr.-to-Date 4367 900.6 822. 6" 1,761,384 549,470 516,627 18.8
20. Unit Availability Factor 100.0 18.8
21. Unit Capacity Factor (Using MDC Net) 102
  • 9
18. 6
22. Unit Capacity Factor (Using DER Net)
81. 2
14. 7
23. Unit Forced Outage Rate 0

0

24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • Based on Condenser Backpressure 8007110 ~ (1 Forecast Cumulative 74,798 40,465.4 38' 248". 9 73.272,864 22,581,700
21. 187.402 51.1 51.1 44.6 35.2 35.8 Achieved (Q/77)

"ERAGE DAILY UNIT POWER LEVEL e DOCKET NO.

50-255 UNIT Palisades DATE 7L2L8o COMPLETED BY PJBodtke TELEPHONE 616-764-8913 MONTH June 1980 DAY AVERAGE DAILY POWER LEVEL DAY A VERA GE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 644 17 626 2

670 18 623 3

654 19 614 4

637 20 322 5

630 21 666 6

627 22 688 7

653 23 675 8

705 24 680 9

712 25 674 IO 702 26 673 11 663 27 677 12 669 28 680 13 653 29 679 14 645 30 698 15 702 31 16 662 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

ND:

Date 15 800620 F: Forced S: Scheduled (9/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH June 1980

,....L 0

~

r-1

"5 eo-
~

~

~ 'J

~ Vl

-::::i *= ~

ClJ

  • =*:;

0

0.

Vl

~ -

ClJ

~ ~

~

..c: '5 0:::

f-.

l ::i:

~

a:;..c,...

o--

0:::

en.~

8 1

30 A

Reason:

A-Equipment Failure (Explain)

B-Maintenance oi Test C'-Refueling D-Regulatory Restrktion Licensee Event

  • Report :tt E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

Ii-Other (Explain) 3 t::

E"<t ClJV')

t::

ClJ ClJ ClJ

  • .~]

0 -0

.0. Q en u Eu 0 u Method:

I-Manual 2-Manual Scram.

3-Automatic Scram.

4-0ther (Explain)

Reduced leak.

DOCKET NO.

50-255 UNIT NAME DATE COMPLETED BY TELEPHONE Palisades 7/2/80 PJBodtke 616-764-8913

  • cause & Corrective Action to Prevent Recurrence power to repair condenser 4

5 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I - Same Snun:e

General

SUMMARY

OF OPERATING EXPERIENCE FOR JUNE 1980 The plant was on line the entire month with only a sh.art power reduction on the 20th to repair a condenser leak.