Provides Chronology of Qa/Qc Problem Re Reinforcement Steel Placement for safety-related Structures.Requests Advice Re Changes in Completion Schedule
ML19329E436
Person / Time
Site: Midland
Issue date: 06/25/1976
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19329E437 List:
References
NUDOCS 8006160238
Download: ML19329E436 (2)


Text

-

T LCENTRAL FILES

  • *.... f*

UNITED STATES NUCLEAR REGULATORY COMMISSION RECloN III 799 ROOSEVELT RO AD GLEN ELLYN, ILLINOIS 6033F June 25, 1976 Consumers Power Company ATTN:

Mr. Stephen H. Howell DocketNo.,jggl$k Vice President Docket No. 50-330 1945 West Parnell Road Jackson, Michigan 49201 Gentlemen:

This refers to the quality assurance / quality control problem regarding j

placement of reinforcement steel for safety related structures at the Midland Nuclear Plant.

This matter has been the subject of the NRC in-spections and meetings between our representative staffs since March, 1976.

A stop work order for 'the placement of concrete on safety related structures was issued by the Consumers Power Company and their contractor at the Midland site on June 8, 1976.

As a result of our inspections and meetings, and the specific problems leading to the June 8 stop work order, detailed plans of action to assure effective-ness of the QA/QC program were proposed by Consumers Power and later documented in your letter of June 18, 1976. The dates you plan to implement these actions are identified in your letter of June 24 1976.

Based on your letters of June 18 and 24, and telephone conversations between you and D. W. Hayes on June 23, 1976, and Slager of your staff and D. W. Hayes on Juneand Messrs. Southworth 24, 1976:

1.

We understand that prior to resumption of concrete placement for safety related structures at the Midland site, Consumers Power will implement the plans of action identified under Item 1 in your June 24, 1976 letter, " Activities to be Completed Prior to Re-sumption of 'Q' Listed Concrete Placement."

2.

We further understand in regard.to Issue No. 5 of the June 18, 1976 letter that, prior to the discontinuance of the overlay in-spections by Consumers Power, be reviewed with the NRC Region III off.lce.the rationale for such action will goWT%

b' G

6 3

s, u ib' n

gs

//6 19 8 0 0 6.L6 0 M N 4

9 4

a>r9

=

9 c-

<are-

-- g-

+---g-y

){.

R Consumers Power Company 2-June 25, 1976 If your understanding of the planned actionr, is not in accordance with those described above, please contact this office within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Concerning matters identified under Item 2 in yout Tune 24, 1976 letter, " Schedule for the Remainder of the Activi. Ac,"

please advise

' us of any changes in your proposed schedule of completion dates.

Sincerely youro, James G. Keppler Regional Director cc:

J. D. Selby, President Consumers Power Company bec w/ltrs dtd 6/18/76 and 6/24/76:

Central Files PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission i

Dr. Wayne E. North Myron M. Cherry, Chicago IE Mail and File Unit O

f r

,