Notifies of Postponement of Continuation of FSAR Review for Approx 10 Months.Present Schedule for Review & Processing of Environ Rept Has Not Changed.Initial FSAR Review Completed
ML19329D783
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/07/1972
From: Deyoung R
US ATOMIC ENERGY COMMISSION (AEC)
To: Rodgers J
FLORIDA POWER CORP.
References
NUDOCS 8003170728
Download: ML19329D783 (2)


Text

,j.

rom l

[MA,up:-:

g,

,,~ b y ep:. '

Docket ho. 50-302 JUL 7 1372 Florida Power Corporation ATTMs J. T. Rodgers Nuclear Project Manager D,,

og y;

~

,ww o

Iqa F. O. Box 14042 St. Petersburg, Florida 33733 Gentlemen:

This letter is to inform you that we are postponing for approximately ten months the continuation of the review of your Final Safety Analysis Report (FSAR) for Crystal River Unit 3 Nuclear Generating Plant. This postponement corresponds to a like delay in your best estimate fuel leading and it is intended not to interfere with your stated plans for plant startup and operation.

In your letter of May 30, 1972, we were informed that Florida Power Corporation expects to revise, in the near future, its Application for Licenses to. state that construction of Crystal River Unit 3 is scheduled

_ for earliest fuel loading to begin in May 1974, with latest fuel loading to begin in December 1974.

In a subsequent telephone conversation, Mr.

J. Emmaock of your staff identified September 1974 as your best estimate date for fuel loading. Because of the demand upon the regulatory staff with other license applications, we deem it prudent to postpone continu-aties of your safety review consistent with these revised fuel loading dates.

i As of this time'we have completed our initial review of your FSAR, have requested additional information, and have received replin.s to nearly all

^

of these requests.

It is our understanding that the few outstanding requests will be answered; shortly. Review of these re) lies will be~

q,.

postponed een months, and if further information is still required,

~--

requests will be forwarded about June 1973. We plan en reviewing your application for an operating license with the Advisory Comm1ttee on Beactor Safeguards in November 1973. This schedule is intended to provide timely review and.lisensing of Crystal River Unit 3 censistent with your revised schedule for plant operation.

Because of their potentially significant effect on continued construction, our review of a few items will not be postponed. Two such items are the l

d rosolution of the uni== vater level at the plant site and the seismic

' ; omcc >

p so-.i

,G sn.

V lDATE>

- ~ Foran.AEC-stb (Revt9 53) AECW 0240,.

-4 On '.id 5.LoovmNumert PRDWTDiG' OFFICE : '

1970 0 - 40$-m M:n i >

-v a

%; %;. &% ny;l',

n.

.a,~~

os17oMf s

3,,,..

design adequacy of the secondary steam lines. You will receive additional casumunication from us concerning these items shortly.

This postponement only applies to the review of the FSAR. No change to the present schedule for review and processing of your Environmental Report has occurred.

If you destre mnplification or additional discussion eencarning this postponement, please contact us.

Sincerely, Set inet Signed by t

a. c, c,y g R. C. DeYoung, Assistant Director for Praesurized "ater P.sactors Directorate of Licensing es: Plorida Power Ccrporation ATfN Mr. 8. A. Brandbacre Vise President and General Counsel F. O. Box 14042 St. Petersburg, Florida 33733 Distribution AEC PDR Local PDR Docket File RP Reading RCDeYoung PWR Branch Chiefs RWKlecker HJFaulkner Regulatory Operations (3)

DMuller VWilson

.,a /

OF7tCE >

h.

..h..I.P W Apf.P.,,

,LIAp--RR,,...

4._

,./

$URNAME

..,... _ _., e r.

M,c,wencer DMts11er __

.RCDeYoung,_.

y DATE >. 7/... /.22....... 7/[#./.22 7 / /.r./22...

.21..T/12.....

Foran AEC-Sta (Rev. 9-Sh AECM 0240

.*s--se-steas.: us-e7s