ML19329D756
| ML19329D756 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/24/1976 |
| From: | Butler W Office of Nuclear Reactor Regulation |
| To: | Rodgers J FLORIDA POWER CORP. |
| References | |
| NUDOCS 8003170696 | |
| Download: ML19329D756 (1) | |
Text
.
Y Distribution /
Docket Fil V ELD MA,Y 0.I 1pg NRC PDR IE (3)
Local PDR LWR #4 File R. C. DeYoung Docket No. 50-30 F. J. Williams W. Butler L. Engle bec:
J. R. Buchanan, NSIC Florida Power Corporation M. Rushbrook T. B. Abernathy, TIC ATTN:
Mr. J. T. Rodgers ACRS (16)
Assistant Vice President and Nuclear Project Manager P. O. Box 14042 S. Petersburg, Florida 33733 t
Gentlemen:
We have completed our review of your " Report on Replacement Assembly 3A3h" dated March 26, 1976 and " Supplement to Report on Replacement Assembly 3A33" dated May 4, 1976, 1
We find acceptable your proposal to use replacement fuel assembly 3A33 during first cycle operation of Crystal River, Unit 3 (CR-3).
The information, analyses, and data submitted by you concerning the subject fuel assembly has been found to be in accordance with NRC approved methods, codes and design limits.
Our evaluation for first cycle operation with fuel assembly 3A33 will appear in Supplement No. 2 of the CR-3 Safety Evaluation Report.
Sincerely,
,3- ~e, a-- y 4Q-Walter R. Butler. Chief Light Water Reactors Branch No. 4 Division of Project Management "cc:
Mr. S. A. Brandimore Vice President and General Counsel P. O. Box 14042 St. Petersburg, Florida 33733 orrics > J E #'r T.1,m #4 LEng;) him WRButler
..-a,
5/l);fl76 5/2]/76 pose ABc.313 (Rev.9 53) AEcM 0240 W u. s. oovsmausar eninvene orricsi tere.sae. nee 8003170676 E
l