ATI.ANTA GEORGI A 30303 JUL 221976 D. Thompson, Acting Director, Division of Field Operations, IE:HQ FLORIDA POWER CORPORATION, CRYSTAL RIVER 3 (DN 50-302) - STATUS OF COMPLETION In accordance with inspection procedure No. 943003, the attached en-closures list remaining open items required to be completed before a finding of readinee for operation may be endorsed by Region II.
The significance of each identified item, relative to the planned issuance of the operating license, is discussed.
The licensee plans to request issuance of an operating license prior to ec=pletion of the do=e repair and proof testing that are tentatively scheduled for co=pletion in January 1977.
FPC is considering requesting that the license be conditioned to: (1) permit fuel loading and sub-critical testing, but not to achieve criticality; or (2) permit fuel loading, suberitical and rero power testing. Tentative dates stated for submittal of the request are during the period of July 26-September 7, 1976. Region II is strongly opposed to issuance of an operating license that would permit the reactor to be made critical prior to completion of the reactor building dome repair and satisfactory performance of the structural and integrated leak rate testing of the building.
E
_mb Norman C. Moseley, Director Region II cc:
B. Grier, Div. of RIP H. Thornburg, Div. of MIP D G. Gower, IE:HQ R. Lewis, IE:II F. Jape, IE:II
Enclosures:
A.
Status of Inspection Required by MC 2512, MC 2513, and MC 2514.
B.
Outstanding Items including Enforcement and Unrssolved Items.
C.
Preoperational Testing Status D.
Construction Status 8003170 O
h
o Enc'ir;ura A CRYSTAL RIVER 3 INSPECTION, STATUS 1.
Manual Chapter 2512 Completa 2.
Manual Chapter.2513 Moduit Title Percent Comolete 41301B Inspection of Operating Staff Training 70 42450B Operating Procedures Inspection 90 42451B Maintenance Procedures Inspection 30 424523 Emergency Procedures Inspection 60 80330B Environ = ental Program - Final Inspection 50 81100B Physical Protection 50 84330B Waste Management - Preop. Liquid Waste System 70 84331B Waste Management - Preop. Gaseous Waste. System 70 84332B Radioactive Waste Systems - Procedures, Measurements 50 851003 Materials Accountability 0
94300B.
Inspection Preparatory to Operating License Issuance 70
- 70313B Witness Contain=ent Leak Rate Test 0
70354B Evaluation of Test Results - 25% of Category I Tests 50 70355B Evaluation of Test Results - 25% of Category I Tests 10
- 70323B Evaluation of Test Results - Containment Leak Rate Testing 0
70358B Evaluation of Test Results - Integrated Hot Functional Testing 0
70325B Evaluation of Test Results - Vibratica Testing 0
70360B Evaluation of Test Results - Category II Tests 0
70361B Verification that 1/3 of Category I Tests are Evaluated by Licensee 0
70362B Verification that 1/3 of Category I Tests are 2 valuated by Licensee 0
70363B Verification that 1/3 of Categcry I Tests are Evaluated by Licensee 0
70364B Verification that All Category II Tests are Evaluated by Licensee 0
70365B Verification that 50% of Category III Tests are Evaluated by Licensee 0
703663 Verification that 50% of Category III Tests are Evaluated by Licensee 0
- Containment SIT and ILRT are delayed due to separations in the con-crete of the reactor building dome.
M em
s t
D 3.
Manual Chapter 2514 Module Title Percent Complete 35501B QA fdr the Startup Testing Program 10 39501B Startup Test Program Records 10 72500B Initial Fuel Loading Procedure Review 80 72568B Precritical Test Procedure Verification for Category'II and Unreviewed Category I Tests 90 72570B Low Power Test Procedure Review 90 72572B Low Power Test Procedure Review 90 72578B Power Ascension Phase Procedure Review 0
725803 Power Ascension Phase Procedure Review 0
72582B Power Ascension Phase Procedure Review 0
72584B Power Ascension Phase Procedure Review 0
72586B Power Ascension Phase Procedure Verification 80 83530B Radiation Protection'- Startup 0
84530B Radioactive Waste Systems - Startup and Power Ascension 20
~
/
t e
9 he 4
. + >.
-e-e=--
-.--c-g..
_.-m,
Enclesura B
-s.
~
Outstanding Items 1.
Enforcement a
Failure to follow procedur, for calibration labels for installed instrumentation,.
(Rpt. 76-11) 2.
Unresolved Items 75/8-2 Co=ments on Preoperational Test Procedures - All com=ents resolved except use of limit switches to prevent pump runout.
Item referred to HQ for resolution on March 17, 1976.
(AITS F20133H1) 75/8-3 operability of Category I Hydraulic Shock and Sway Suppressors (IEB 75-05) - Test data obtained, results being reviewed for acceptanc2.
Surveillance procedure not available for review.
75-8/6 Instruments Inside of Shielded Cubicle - Licensee review-ing A-E reco=mendation.
75-16/2 Tra'ining Co=pletion and Docu=entation - FSAR amendment
~
is being prepared by licensee.
75-19/4 Testing of Radioactive Waste Samole Lines - Details of test program have not been determined.
75-19/6 Evaluation of Samoline Media Collection Efficiencies 76-6/2 Precritical Test Program TSAR amendment is being prepared by licensee.
76-9/1 Diesel Generator Control Panels Licensee making survey and equipment modifications.
3.
Other Items a.
Surveillance Specimen Program Licenseestatedthatthesurveillancespecimencapfsuleswill not be installed as described in FSAR 4.4.5 and Appendix H of 10 CFR 50.
Exemption has not been granted by Licencing.
6
.r.
r!
c g,
b.
Repair of Reactor Building "ome a
Lift-off measurements underway.
Final decision concerning de-tensioning and repair has not been made.
c.
Resolution of Comments in Report 76-7 concerning Emergency Plan Implementation.
d.
Resolution of Cor:ments in Report 76-7 concerning test program.
9 e
f
/
e
r" r
l ENCLOSURE C i
- w.
Preop' rational Testing-Status e
1 Class 3 Class 1 & 2 I
1.
Test Performed and 90.5%
84%
completed 2.
Test Results approved 55%
47%-
t l
e i
1
=
9 4
9 O
I
.~--.~e
Encier.:ura D Construction Status-Construction reported 98% complete.
e e
9 8
9 4
9 e
-n..-.-.
y*
uriowr.uc>rmoq[ l u,,,,,,,,,,,
R,,.i..co,
~ ~ ~ ~ T r-roe.,.T.E i
- an.--n -
'o ei (u:,o3... u.n>
=v,
annuo
+
/
l \\
4GY/l k J. Fairobent s
u H&M Branch, DSE
, (
un THRU:
. Congel, RAB
~,.
i
~
M '. Q ' 'O !
TO (Nam. and unen pdfiALs msmAmo un TO (n....aa va.o riu.s uuuu un FRCM (N.mo and godt) agmAngs O
M. A. Parsont /'
SPECIAL LOCATIONS FCR CRYSTAL FB7:R RIS/RABM,
Attached clease find a cecy of the above.
An in c M e
P-214 copy of same was transmitted en 7/21/76e PHONE #C DATE 27955 7/22/76 L'31 w.*MER $lCE FOR ADDITfCNAL REMAmKS CPri t 1971 O. 445 443 O
9 4
D*"
r %
]D fkTi lI R w%3s} a a
O
e p
9 9
?
,~e e
~ '
O g
6 s%
e e
e I
J
(s
/
b TABLE AS 11 STANCES AND METEOROLOGICAL PARAMETERS DIRECTIONS, FOR RESIDENCES WITHIN 5 MILES X/Q D/Q (sec.M-3)
(M-2)
D tance to Nearest Direction Residence and Carden
-10 5.2 x 10 y,9?
-8 x 10
> 4 miles N
-10 4.3 x 10 4.3 x 10
~
> 4 miles NNE
-10
-8 8.7 x 10 9.3 x 10
> 3 miles NE
-10 7.7 x 10' 8.7 x 10 i
> 3 miles ENE
~9
'3 mi)es 1.0 x 10 1.5 x 10
~
E
-10 4.2 x 10 5.2 x 10
~
> 4 miles ESE
-10
~0 4.4 x 10 3.9 x 10
> 4 miles SE
-10 6.2 x 10 2.7 x 10
~
> 4 mile SSE
-10
-8 5.1 x 10 3.1 x 10
> 4 mil s N!N h
36 1
O e
e A-18
c.
v Y:.
~
,n TAllLE A6 DISTANCES TO NEAREST SITE BOUNDARY, BY DIRECTION Distance Distance (feet)
(feet)
Direction Direction S
9,049 4,397 N
~
NE 4,928 WSW 7,451.
4,465
]
ENE W
8,225 E
7,090 WW 8,120 ESE 6,936 NW 5,341 8,278 SE NW 4,567 SSE
' 9,823 3
{
f g
e e
O e
O i
A-19 P
e m.
7
- -.