Ack 750922 Receipt of Util Provisions for Meeting Reg Guide 1.79, Pre-operational Testing of ECCS for Pwrs. Provisions Inadequate.Requests Response Re NPSH Sump Test Verification & Vortex Formation Control within Seven Days of This Ltr
ML19329D637
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/09/1975
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Rodgers J
FLORIDA POWER CORP.
References
NUDOCS 8003160261
Download: ML19329D637 (1)


Text

. _..

wxty..+ pwCci>rony gy mmycSysg.j,}puv%f'F L.

.a 5

h?

k*

a 4 #g. e,J, &g

- a. ;,Z 3.w m =

.c m :t i:n & A.L, - 4g g +M** Y g-Q,g,g a y -..

- e q

%4 -

. : 9 ;;cM, g k,..J.h.Q ?,m,s 3

4 y ~%. d t

)r 2%.

irrys':

M,,.. x i:a QL &:a

T Distribution

p Docket Fil<imu=*

RHeineman Docket No. 50-302 OCT. 091975 URC PDR RWKlecker Local PDR MWilliams TIC ELD LWR 2-3 File IE (3)

Florida Power Ccrporation VAMoore LEngle ATTN:

Mr. J. T. Rodgers EGoulbourne TR Branch Chiefs

' Assistant Vice President LWR 1 S 2 Branch Chiefs JPanzarella

& Nuclear Manager ACRS (16)

JRBuchanan, ORNL P. O. Box 14042 TBAbernathy, DTIE St. Petersburg, Florida 33733 Gentlemen:

On Septe~.ber 22, 1975 we received your provisionc for meeting Regulatory Guide 1.79, "Preoperational Testing of Emergency Core Cooling System for Pressurized Water Reactors", for Crystal River, Unit 3 (CR-3).

We find your response includes no provisions for a sump test verification of Net Positive Suction Head (NPSH) and control of vortex formation.

Therefore, wo find your response to Regulatory Guide 1.79 is not acceptable at this time.

t As we indiented to you in our letter of September 10, 1975, tinely i

resolution of these matters is needed in order that your preoperational testing required for meeting Regulatory Guide 1.79 will not impact your accelerated fuel load date.

We request that your response to Regulatory Guide 1.79, with regard to a sump test for NPSH and vortex control be submitted for staff review on October 31, 1975.

If you cannot meet this date, please inform us by letter within seven (7) days after receipt of this letter so that we may revise cur scheduling.

Please call us if you have any questions concerning these natters.

Sincerely, j

Original Signed by AiSchviencer.

A. Schwencer, Chic #

Light Uater Reactors Branch 2-3 Division of Reactor Licensing

.cc:

Mr. S. A. Brandinere Vice President & General Counsel

{

P. O. Box 14042 St. Petersburg, Florida 33733 SEE PREVIOUS YELLOW FOR COUCURREUCES A

c,eie.

RI,4. WF 2. -3

.DTR:RSB

' RL "lf 2 3,

l g

LEn, E pga_

TNovak A chwencer i

.u...w e

b i

10/7/75 10/9/75 7

10/ /75

(