ML19329B945

From kanterella
Jump to navigation Jump to search
Forwards 761110 Memo Noting Util Deletion of Natural Circulation Test & Recommending Test Inclusion in Startup Test Program
ML19329B945
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/01/1976
From: Sniezek J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML19329B947 List:
References
NUDOCS 8002070545
Download: ML19329B945 (1)


Text

.

C*

Distribution IE Files

' Central Files DEC 0137s IE Reading RIP Reading LWRPB Chron John F. Stols, Chief, Light Water Reactors 3 ranch No.1. Division of Project Masamt, NRR DELETION OF NATURAL CIRCULATION TEST - TOLEDO EDISON Co. (DAVIS-BESSE 1)

The enclosed memorandum (with attachment) from R. C. Inop, dated E A r 10, 1976, states that the Tolede Edison Company has deleted the Natural Circulation Test pianand for performance during the startup testing phase of Davis-Besse 1.

The Natural Circulation Test is listed as a required test in Regulatory Ceide 1.68.

We recommend that the Matural Circulation Taat be included in the startup test program for Davise-Besse 1.

If your staff has any questions regarding this :aatter, C. R. Klingler

)

is the cognizant IE contact (492-7451).

cfgs wd k1 g.,. >.1 Jxnes R. Sniesek, Chief Light Water Reactor Programs Branch Division of Reactor Inspectica Programs, IE

Enclosure:

As stated.

cc:

R. C. Knop, NRC:III C. Fiore111. ERC III mm D

D C. R. Klingler, IE WW 0

F3 0233 H1 t

A 0

. q,j u x a

RIP 996 iI

.rb N &

isne..l I

o r 'e =

  • IE:LWRPB

. II:LWRPE-CRKlingler JHSniezek

'"""a"'*

11/30/76 1 /- /76 -

  • Form AEC-318 (Rev. 9 53) AECM 0240
  1. u. a. sovsamasswv emmtime orricas s era.sas see 8 o o 2 07 0 ff s-V