ML19329B945
| ML19329B945 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 12/01/1976 |
| From: | Sniezek J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19329B947 | List: |
| References | |
| NUDOCS 8002070545 | |
| Download: ML19329B945 (1) | |
Text
.
C*
Distribution IE Files
' Central Files DEC 0137s IE Reading RIP Reading LWRPB Chron John F. Stols, Chief, Light Water Reactors 3 ranch No.1. Division of Project Masamt, NRR DELETION OF NATURAL CIRCULATION TEST - TOLEDO EDISON Co. (DAVIS-BESSE 1)
The enclosed memorandum (with attachment) from R. C. Inop, dated E A r 10, 1976, states that the Tolede Edison Company has deleted the Natural Circulation Test pianand for performance during the startup testing phase of Davis-Besse 1.
The Natural Circulation Test is listed as a required test in Regulatory Ceide 1.68.
We recommend that the Matural Circulation Taat be included in the startup test program for Davise-Besse 1.
If your staff has any questions regarding this :aatter, C. R. Klingler
)
is the cognizant IE contact (492-7451).
cfgs wd k1 g.,. >.1 Jxnes R. Sniesek, Chief Light Water Reactor Programs Branch Division of Reactor Inspectica Programs, IE
Enclosure:
As stated.
cc:
R. C. Knop, NRC:III C. Fiore111. ERC III mm D
D C. R. Klingler, IE WW 0
F3 0233 H1 t
A 0
. q,j u x a
RIP 996 iI
.rb N &
isne..l I
o r 'e =
- IE:LWRPB
. II:LWRPE-CRKlingler JHSniezek
'"""a"'*
11/30/76 1 /- /76 -
- Form AEC-318 (Rev. 9 53) AECM 0240
- u. a. sovsamasswv emmtime orricas s era.sas see 8 o o 2 07 0 ff s-V