Forwards IE Insp Rept 50-346/77-09 on 770316-18. No Noncompliance Noted
ML19329B424
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/06/1977
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19329B425 List:
References
NUDOCS 8002050630
Download: ML19329B424 (2)


See also: IR 05000346/1977009

Text

.

.

.

.

m

N

L

,

4,

.

,

,1 >A 8E00g,[*,,

/

\\

UNITED STATES

(

+

NUCLEAR REGULATORY COMMISSION

IBFILE COPY

q(;U f

3

REGloN lli

Io *,'

g

799 ROOSEVELT ROAD

-

g

cLEN ELLYN. ILUNOIS 401 M

,,

APR D R

Docket No. 50-346

Toledo Edison Company

ATTN:

Mr. Lowell E. Roe

Vice President

Facilities Development

Edison Plaza

300 Madison Avenue

'

Toledo, oil 43652

,

Gentlemen:

This refers to the inspection conducted by Mr. K. R. Naidu of this

office on March 16-18, 1977, at Babcock & Wilcox, Lynchburg, relative

to the review of quality documents pertaining to Davis-Besse Nuclear

Power Station, Unit 1, authorized by NRC Construction Permit No.

CPPR-80 and to the discussion of our findings with members of the

tO)

B&W staff and your Mr. E. M. Wilcox at the conclusion of the inspection.

-

U

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of specifications, purchase orders, Quality

Assurance Documents, related correspondence and interviews with 36W

personnel relative to Quality Assurance documentation on seven Velan

valves with Kieley-Mueller operators and High Pressure Injection pump

forced bearing lube oil modification components.

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

As discussed in the exit interview with B&W personnel, we underrcand

that B&W Lynchburg will obtain the additional documents to asstre that

the field modifications of the Velan valves and High Pressure ::njection

pump meet specification requirements.

'In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this notice,

.i

the enclosed inspection report, and your response to this notice will

50b

/')

0'A

~ ' '

(

0

0

.

.

.

a

.

.

.

'

L

5

.

.

t.7'

i

U(m

\\

r

.

-

Toledo Edison Company

- 2.-

APR

G 19T/'

,

,

.

!

be placed in the NRC's Public Document Room, except as follows.

If this

report contains information that you or your contractors believe to be

proprietary, you must apply in writing to this office, within twenty

days of your receipt of this notice, to withhold such information from

public disclosure. The application must include a full statement of the

reasons for which the information is conoidered proprietary, and should

be prepared so that proprietary information identified in the application

is contained in an encic,sure to the application.

a

We will gindly discuss any questions you have concerning this inspection.

'

-

Sincerely,

.

i

.

R.*F.

Heishman, Chief

Reactor Construction and

^

'

Engineering Support Branch

Enclosure:

IE Inspection

'. -

t

Report No. 050-346/77-09 _

'

cc w/ enc 1:

s,

,,

,

Central Files

,.

Reproduction Unit IRC 20b

,

,

PDR

, , , ,

Local PDR

,

,

NSIC

,.

,

TIC

_,

l

U. Young Park, Power

,_

Siting Commission

,, ,

-

f

I

,

l !V

l

1

l

- serie %. RIII

,ie*-ARTl

RIII hf

RIII

. .....

. afdu/Is

  1. pn

.

1 Jet m g

Tambli.nn

'ltl77

,___

_,h;5

if J r.[ {']"]

_

4

..,.