ML19329B424
| ML19329B424 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 04/06/1977 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Roe L TOLEDO EDISON CO. |
| Shared Package | |
| ML19329B425 | List: |
| References | |
| NUDOCS 8002050630 | |
| Download: ML19329B424 (2) | |
See also: IR 05000346/1977009
Text
.
.
.
.
m
N
L
,
4,
.
,
,1 >A 8E00g,[*,,
/
\\
UNITED STATES
(
+
NUCLEAR REGULATORY COMMISSION
IBFILE COPY
q(;U f
3
REGloN lli
Io *,'
g
799 ROOSEVELT ROAD
-
g
cLEN ELLYN. ILUNOIS 401 M
,,
APR D R
Docket No. 50-346
Toledo Edison Company
ATTN:
Mr. Lowell E. Roe
Vice President
Facilities Development
Edison Plaza
300 Madison Avenue
'
Toledo, oil 43652
,
Gentlemen:
This refers to the inspection conducted by Mr. K. R. Naidu of this
office on March 16-18, 1977, at Babcock & Wilcox, Lynchburg, relative
to the review of quality documents pertaining to Davis-Besse Nuclear
Power Station, Unit 1, authorized by NRC Construction Permit No.
CPPR-80 and to the discussion of our findings with members of the
tO)
B&W staff and your Mr. E. M. Wilcox at the conclusion of the inspection.
-
U
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of specifications, purchase orders, Quality
Assurance Documents, related correspondence and interviews with 36W
personnel relative to Quality Assurance documentation on seven Velan
valves with Kieley-Mueller operators and High Pressure Injection pump
forced bearing lube oil modification components.
No items of noncompliance with NRC requirements were identified
during the course of this inspection.
As discussed in the exit interview with B&W personnel, we underrcand
that B&W Lynchburg will obtain the additional documents to asstre that
the field modifications of the Velan valves and High Pressure ::njection
pump meet specification requirements.
'In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this notice,
.i
the enclosed inspection report, and your response to this notice will
50b
/')
0'A
~ ' '
(
0
0
.
.
.
a
.
.
.
'
L
5
.
.
t.7'
i
U(m
\\
r
.
-
Toledo Edison Company
- 2.-
APR
G 19T/'
,
,
.
!
be placed in the NRC's Public Document Room, except as follows.
If this
report contains information that you or your contractors believe to be
proprietary, you must apply in writing to this office, within twenty
days of your receipt of this notice, to withhold such information from
public disclosure. The application must include a full statement of the
reasons for which the information is conoidered proprietary, and should
be prepared so that proprietary information identified in the application
is contained in an encic,sure to the application.
a
We will gindly discuss any questions you have concerning this inspection.
'
-
Sincerely,
.
i
.
R.*F.
Heishman, Chief
Reactor Construction and
^
'
Engineering Support Branch
Enclosure:
IE Inspection
'. -
t
Report No. 050-346/77-09 _
'
cc w/ enc 1:
s,
,,
,
Central Files
,.
Reproduction Unit IRC 20b
,
,
, , , ,
Local PDR
,
,
,.
,
_,
l
U. Young Park, Power
,_
Siting Commission
,, ,
-
f
I
,
l !V
l
1
l
- serie %. RIII
,ie*-ARTl
RIII hf
RIII
. .....
. afdu/Is
- pn
.
1 Jet m g
Tambli.nn
'ltl77
,___
_,h;5
if J r.[ {']"]
_
4
..,.