ML19329B284
| ML19329B284 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 11/16/1976 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Roe L TOLEDO EDISON CO. |
| Shared Package | |
| ML19329B285 | List: |
| References | |
| NUDOCS 8002040677 | |
| Download: ML19329B284 (1) | |
Text
..
=
.r.
CENTRAL FILES UNITED STATES NUCt. EAR REGULATORY COMMISSION REGloN lli
' 79J ROOSEVELT ROAD GLEN ELLYN. ILLINOIS 60137 NDV10 f976' The Toledo Edison Company Docket No. 50-346 ATTli:
Mr. Lowell E. Roe Facilities Development Edison Plaza
.300 Madison Avenue Toledo, Ohio 43652 Gentlemen:
Thank you for your final report dated November 1, 1976, pursuant to 10 CFR 50.55(e) regarding instrument mounting brackets that had not been seismically qualified. We will revieu this matter during a future inspection.
Your cooperation with us is appreciated.
Sincerely yours, W
W R. F. Heishman, Chief Reactor Construction and Engineering Support Branch cc:
Dr. Ernst Volgenau Director of Inspection and Enforcement, IE:HQ cc w/1tr dtd 11/1/76:
Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC U. Young Park, Power Siting Commis.sion 0\\.UTIO4 4$ (%
- 'o
?
icd-@\\ l 8*o204%77 s
\\;ish']
.o
^
!? g.<g8
?
3b
- -