ML19329B284

From kanterella
Jump to navigation Jump to search
Ack Receipt of 761101 Deficiency Rept Re Seismically Unqualified Instrument Mounting Brackets
ML19329B284
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/16/1976
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19329B285 List:
References
NUDOCS 8002040677
Download: ML19329B284 (1)


Text

..

=

.r.

CENTRAL FILES UNITED STATES NUCt. EAR REGULATORY COMMISSION REGloN lli

' 79J ROOSEVELT ROAD GLEN ELLYN. ILLINOIS 60137 NDV10 f976' The Toledo Edison Company Docket No. 50-346 ATTli:

Mr. Lowell E. Roe Facilities Development Edison Plaza

.300 Madison Avenue Toledo, Ohio 43652 Gentlemen:

Thank you for your final report dated November 1, 1976, pursuant to 10 CFR 50.55(e) regarding instrument mounting brackets that had not been seismically qualified. We will revieu this matter during a future inspection.

Your cooperation with us is appreciated.

Sincerely yours, W

W R. F. Heishman, Chief Reactor Construction and Engineering Support Branch cc:

Dr. Ernst Volgenau Director of Inspection and Enforcement, IE:HQ cc w/1tr dtd 11/1/76:

Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC U. Young Park, Power Siting Commis.sion 0\\.UTIO4 4$ (%

  1. 'o

?

icd-@\\ l 8*o204%77 s

\\;ish']

.o

^

!? g.<g8

?

3b

- -