Notifies That No Noncompliance Found in Insp on 720111-12. Major Areas Inspected:Revised Procedures for Placement of Pumped Concreted,Concrete Sample Cylinder Strength Test Results & Containment Vessel Fabrication
ML19329B250
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/03/1972
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sampson G
TOLEDO EDISON CO.
Shared Package
ML19329B241 List:
References
NUDOCS 8001310602
Download: ML19329B250 (2)


Text

..

J. B. H<nderson. CO O

UNITED STATES g

ATOMIC ENERGY COMMISSION

(.

1 k[

DIVISION OF COMPLIANCE e

REGION lli 799 ROCSEVELT ROAD g

GLEN ELLYN. L N s 6 137 (31a) ass.zeso Toledo Edison Company Docket No. 50-346 l

ATTN: Mr. Glenn J. Sampson Vice President, Power 420 Madison Avenue Tc,ledo, Ohio 43601 Gentlemen:

This refers to the inspection conducted by Messrs. Hayes and Rohrbacher of this office on January 11 - 12, 1972, of construction activities at the Davis-Besse site authorized by AEC Construction Permit No. CPPR-80 and to the discussion of our findings at the conclusion of the inspection with Messrs. Wadsworth, Eichenauer, Maring, and Wilcox of your staff.

Areas examined during the inspection included revised procedures for placement of pumped concrete, concrete sample cylinder strength test resulto, containment vessel fabrication, concrete placement practices, receipt and storage of component heat exchangers and waste gas decay tanks, and procedures for installing Class I piping. Within these areas, the inspection consisted of selective examination of procedures and representative records, interviews with plant personnel, and observations by the inspectors.

The inspectors also e===4nad actions you have taken with respect to the items identified in your letter of December 2, 1971, relating to matters previously brought to your attention. We have no further questions on these matters.

No items of noncompliance with AEC requirements were identified within the areas ow= mined during this inspection.

With regard to questions raised during this inspection, we understand that all concrete production at the site was stopped pending resolu-tion of a possible problem related to concrete having low compressive strength based on the results of seven-day break tests. We also I

u J

l 8001 n0 sj 2 0200

O Toledo Edison Company February 3, 1972 l

understand that you have initiated a program to determine the ca. ee of the low strength test results which inclusies a review of the physical as well as the chemical aspects of concrete production, j

We will examine your accian on this matter during our next routine inspection.

No reply to this letter is necessary; however, should you have questions concerning this inspection we will be glad to discuss them with you.

Sincerely yours, Boyce H. Grier Begional Director cc:

L. E. Poe, Project Engineer N. L. Wadsworth, Canarst

)

Superintendent J. A. Lanardson, Quality Assurance Engineet bec: J.

B. Henderson, CO L. Kornblith, C0 R. H. Engelken, CO A. Giambusso, CO P. A. Morris, DRL CO Files DR Central Files PDR Local PDR NSIC R. L. Shannon, DTIE

-