Forwards Insp Rept 50-346/74-01 on 740108-10.Noncompliance Noted
ML19329B219
Person / Time
Site: Davis Besse 
Issue date: 02/20/1974
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19329B217 List:
References
NUDOCS 8001310567
Download: ML19329B219 (2)


See also: IR 05000346/1974001

Text

%b,,.,

..

-

O

(] lp'#

UNITED STATES

(

l

q

,o

ATOMIC ENERGY COMMISSION

,

(

,[J

DIRECTORATE OF REGULATORY OPERATIONS

%

REGION lli

%ts 09

799 ROOSEVELT ROAD

TEtrPHONE

GLEN ELLYN. ILLINOIS 6oI37

0 121 050-1660

FEB 2 0 1974

Toledo Edison Co:tpany

Docket No. 50-346

ATTN:

Mr. Lowell Roe

Vice President, Power

Edison Plaza

300 Madison Avenue

Toledo, Ohio 43652

Gentlemen:

This refers to the inspection conducted by Messrs. Dickerson, Sutton and

Hayes of this office on January 8-10, 1974, of activities at the Davis-Eesse

Construction Site authorized by AEC Construction Permit No. CPPR-80 and to

the discussion of our findings uith you, Messrs, Novak, Wilcox and others

of your staff at the conclusion of the inspection.

A copy of our report of this inspection is enclosed and identifies the

areas examined during the inspection. Within these creas, the inspection

v,

consisted of a selective examination of procedures and representative

records, interviews with plant personnel, and observations by the inspectors.

During this inspection, it was found that certain of your activities appear

to be in violation of AEC requirements. The items and reference to the

pertinent requirements are listed under Enforcement Action in the Succary

of Findings Section of the enclosed inspection report.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the AEC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office within thirty days of

your receipt of this notice, a written statement or explanation in reply,

including:

(1) corrective steps which have been taken by you, and the

results achieved; (2) corrective steps which will be taken to avoid further

violations, and (3) the date when full compliance will be achieved.

Such

a statement or explanation should be provided for each of the items listed.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this notice, the enclosed

inspection report, and your response to this notice will be placed in the

AEC's Public Document Room.

If this report contains any information that

you or your contractors believe to be proprietary, it is necessary that you

make a written application to this office, within twenty days of four receipt

\\j

80f1@ 567

r

i k,

l

%

__

-

- .-

. . _ _

.

.

~

.

FEB 2 0 1974

Toledo Edison Company

-2-

of this notice, to withhold such information from public discionure.

Any

such application must include a full statccent of the reasons for which it

is claimed that the information is proprietary, and ahculd be prepared so

the proprietary information identified in the application is contained in

a separate part of the document. Unless we receive an application to withhold

information or are otherwise contacted within the specified time period, the

written material identified in this paragraph will be placed in the Public

Document Room.

Should you have any questions concerning this inspection, we vill be gled

to discuss them with you.

Sincerely yours,

!

James G. Ecppler

Regional Director

O

Enclocure:

Cl

RO Inspection Rpt No.

050-346/74-01

!

,

bec:

RO Chief, FS&EB

,

RO:HQ (4)

Licensing (4)

DR Central Files

V4@ Files

i

PDR

l

NSIC

l

DTIE

l

i

'

s

l

5

.

--

.

-

.

.

_

_ _ _ _ . _ . _ . _ - _ . _ _ ,

.

_ _ _ .