O
(] lp'#
UNITED STATES
(
l
q
,o
ATOMIC ENERGY COMMISSION
,
(
,[J
DIRECTORATE OF REGULATORY OPERATIONS
%
REGION lli
%ts 09
799 ROOSEVELT ROAD
TEtrPHONE
GLEN ELLYN. ILLINOIS 6oI37
0 121 050-1660
FEB 2 0 1974
Toledo Edison Co:tpany
Docket No. 50-346
ATTN:
Mr. Lowell Roe
Vice President, Power
Edison Plaza
300 Madison Avenue
Toledo, Ohio 43652
Gentlemen:
This refers to the inspection conducted by Messrs. Dickerson, Sutton and
Hayes of this office on January 8-10, 1974, of activities at the Davis-Eesse
Construction Site authorized by AEC Construction Permit No. CPPR-80 and to
the discussion of our findings uith you, Messrs, Novak, Wilcox and others
of your staff at the conclusion of the inspection.
A copy of our report of this inspection is enclosed and identifies the
areas examined during the inspection. Within these creas, the inspection
v,
consisted of a selective examination of procedures and representative
records, interviews with plant personnel, and observations by the inspectors.
During this inspection, it was found that certain of your activities appear
to be in violation of AEC requirements. The items and reference to the
pertinent requirements are listed under Enforcement Action in the Succary
of Findings Section of the enclosed inspection report.
This notice is sent to you pursuant to the provisions of Section 2.201 of
the AEC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office within thirty days of
your receipt of this notice, a written statement or explanation in reply,
including:
(1) corrective steps which have been taken by you, and the
results achieved; (2) corrective steps which will be taken to avoid further
violations, and (3) the date when full compliance will be achieved.
Such
a statement or explanation should be provided for each of the items listed.
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this notice, the enclosed
inspection report, and your response to this notice will be placed in the
AEC's Public Document Room.
If this report contains any information that
you or your contractors believe to be proprietary, it is necessary that you
make a written application to this office, within twenty days of four receipt
\\j
80f1@ 567
r
i k,
l
%
__
-
- .-
. . _ _
.
.
~
.
FEB 2 0 1974
Toledo Edison Company
-2-
of this notice, to withhold such information from public discionure.
Any
such application must include a full statccent of the reasons for which it
is claimed that the information is proprietary, and ahculd be prepared so
the proprietary information identified in the application is contained in
a separate part of the document. Unless we receive an application to withhold
information or are otherwise contacted within the specified time period, the
written material identified in this paragraph will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we vill be gled
to discuss them with you.
Sincerely yours,
!
James G. Ecppler
Regional Director
O
Enclocure:
Cl
RO Inspection Rpt No.
050-346/74-01
!
,
bec:
RO Chief, FS&EB
,
RO:HQ (4)
Licensing (4)
DR Central Files
V4@ Files
i
l
l
DTIE
l
i
'
s
l
5
.
--
.
-
.
.
_
_ _ _ _ . _ . _ . _ - _ . _ _ ,
.
_ _ _ .