Text
--
-
-
-
_.
$0ft l Q
~
'
'
'
.
UNITED STATES
f
ATOMIC ENERGY COMMISSION
1.l
.e
.
DIRECTORATE OF REGULATORY OPERATIONS
/g
b
REGION lli
45 6
799 ROOSEVELT ROAD
yggsy,,ouc
,
GLEN ELLYN. ILLINOIS So!37
012) ass-aseo
MAR 2 0 1974
Toledo Edison Company
Docket No. 50-346
ATTN:
Mr. Lowell Roe
Vice President, Power
Edison Plaza
300 Madison Avenue
Toledo, Ohio 43652
Centlemen:
This refers to the inspection conducted by Messrs. Dickerson and llayes
~
-
of this office on February 13-15, 1974, of activities at the Davis-Besse
Construction Site authorized by AEC Construction Permit No. CPPR-80, and
to the discussion of our findings with you, Messrs. Novak, Lenardson and
others of your staff at the conclusion of the inspection.
G
A copy of our report of this inspection is enclosed and identifies the
)
areas examined during the inspection. Within these areas, the inspection
consisted of a selective examination of procedures and representative
records, interviews with plant personnel, and observations by the inspector.
During this inspection, it was found that certain of your activities appear
to be in violation
! AEC requirements. The item and reference to the
pertinent requirements are listed under Enforcement Action in the Summary
of Findings Section of the enclosed inspection report.
This notice is sent to you pursuant to the provisions of Section 2.201 of
the AEC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office within thirty days of
your receipt of this notice, a written statement or explanation in reply,
including:
(1) corrective steps which have been taken by you, and the
results achieved; (2) corrective steps which will be taken to avoid further
violations; and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this notice, the enclosed
i"
inspection report, and your response to this. notice will be placed in the
AEC's Public Document Room.
If this report contains any information that
you or your contractors believe to be proprietary, it is necessary that you
make a written application to this office, within twenty days of your receipt
,
/
( u)
% SDIT TO:
}
.
, (,.
,
.
waa v
]l,' T
.21C
21C
g
a*
80 1310 6[>3
-
-
-
_ _
, _ _ _
_
&.
-
.
\\
Toledo Edison Conpany
-2-
<
of this notice, to withhold such information from public disclosure. Any
such application must include a full statement of the reasons for which it
is claimed that the information is proprietary, and should be prepared so
the proprietary information identified in the soplication is contained in
a separate part of the document.
Unless we receive an application to withhold
information or are otherwise contacted within the specified time period, the
written material identified in this paragraph will be placed in the Public
Document Room.
Should you !cve any questions concerning this inspection, we will be glad
to discuss them with you.
Sincerely yours,
Y
-
James G. Keppler
Regional Director
Enclosure:
RO Inspection Rpt No. 050-346/74-02
bec: RO Chief, FS&EB
RO:HQ (4)
Licensing (4)
DR Cantral Files
d Files
Local PDR
'