Forwards Insp Rept 50-346/74-02 on 740213-15.Noncompliance Noted
ML19329B214
Person / Time
Site: Davis Besse 
Issue date: 03/20/1974
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19329B210 List:
References
NUDOCS 8001310563
Download: ML19329B214 (2)


See also: IR 05000346/1974002

Text

--

-

-

-

_.

$0ft l Q

~

'

'

'

.

UNITED STATES

f

ATOMIC ENERGY COMMISSION

1.l

.e

.

DIRECTORATE OF REGULATORY OPERATIONS

/g

b

REGION lli

45 6

799 ROOSEVELT ROAD

yggsy,,ouc

,

GLEN ELLYN. ILLINOIS So!37

012) ass-aseo

MAR 2 0 1974

Toledo Edison Company

Docket No. 50-346

ATTN:

Mr. Lowell Roe

Vice President, Power

Edison Plaza

300 Madison Avenue

Toledo, Ohio 43652

Centlemen:

This refers to the inspection conducted by Messrs. Dickerson and llayes

~

-

of this office on February 13-15, 1974, of activities at the Davis-Besse

Construction Site authorized by AEC Construction Permit No. CPPR-80, and

to the discussion of our findings with you, Messrs. Novak, Lenardson and

others of your staff at the conclusion of the inspection.

G

A copy of our report of this inspection is enclosed and identifies the

)

areas examined during the inspection. Within these areas, the inspection

consisted of a selective examination of procedures and representative

records, interviews with plant personnel, and observations by the inspector.

During this inspection, it was found that certain of your activities appear

to be in violation

! AEC requirements. The item and reference to the

pertinent requirements are listed under Enforcement Action in the Summary

of Findings Section of the enclosed inspection report.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the AEC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office within thirty days of

your receipt of this notice, a written statement or explanation in reply,

including:

(1) corrective steps which have been taken by you, and the

results achieved; (2) corrective steps which will be taken to avoid further

violations; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this notice, the enclosed

i"

inspection report, and your response to this. notice will be placed in the

AEC's Public Document Room.

If this report contains any information that

you or your contractors believe to be proprietary, it is necessary that you

make a written application to this office, within twenty days of your receipt

,

PDR

/

( u)

% SDIT TO:

}

.

, (,.

,

.

waa v

]l,' T

.21C

21C

g

a*

80 1310 6[>3

-

-

-

_ _

, _ _ _

_

&.

-

.

\\

Toledo Edison Conpany

-2-

<

of this notice, to withhold such information from public disclosure. Any

such application must include a full statement of the reasons for which it

is claimed that the information is proprietary, and should be prepared so

the proprietary information identified in the soplication is contained in

a separate part of the document.

Unless we receive an application to withhold

information or are otherwise contacted within the specified time period, the

written material identified in this paragraph will be placed in the Public

Document Room.

Should you !cve any questions concerning this inspection, we will be glad

to discuss them with you.

Sincerely yours,

Y

-

James G. Keppler

Regional Director

Enclosure:

RO Inspection Rpt No. 050-346/74-02