ML19329B012

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-346/74-09 on 741125-27. No Noncompliance Noted
ML19329B012
Person / Time
Site: Davis Besse 
Issue date: 01/14/1975
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19329B013 List:
References
NUDOCS 8001290733
Download: ML19329B012 (2)


See also: IR 05000346/1974009

Text

-

0l

lu

UNITED STATES

,

.

f.

I

ATOMIC ENERGY COMMISSION

.

'j

DIRECTORATE OF REGULATORY OPERATIONS

k

,

REGION lli

A

85 #

799 ROOSEVELT ROAD .

-

GLEN ELLYN. ILLINOIS Sol 37

-

dt2) ass-2sso

.

1AN i '4 1975

,

e

Toledo Edison Company

Docket No. 50-346

ATTN:

Mr. Lowell E. Roe

Vice President, Power

-

Edison Plaza

300 Madison Avenue

Toledo, Ohio

43652

Gentlemen:

-

This refers to the inspection conducted by Messrs. R. Martin and H.

Dance of this office on November 25, 26, and 27, 1974, of activities at

Davis-Besse Unit 1 Construction Site authorized by AEC Construction

Permit CPPR-80 and to the discussion of our findings with J. Evans and

others of your staff at the conclusion of this inspection.

A copy of our report of'this inspection is enclosed and identifies the

areas examined during the inspection. Within these areas, the inspection

Ci

' records, interviews with plant personnel, and observations by the inspectors.

consisted of a selective examination of procedures and representative

No violations of AEC requirements were identified within the scope of

this inspection.

.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the AEC's Public Document

Room.

If this report contains any information that you or your con-

tractors believe to be proprietary, it is necessary that you make a

written application to this office, within twenty days of your receipt

of this letter, to withhold such information from public disclosure.

Any such application unust include a full statement of the reasons for

which it is claimed that the information is proprietary, and should be

prepared so the proprietary information identified in the application is

contained in a separate part of the document.

Unless we receive an

application to withhold information or are otT.erwise contacted within

the specified time period, the written material identified in this

paragraph will be placed in the Public Document Room.

l

')

t

\\m

i

      • '290733 9

.

..

.

.

..

_ _ .

-

.

7 ,.

.. _ ._

.

L

.

.

.

.,

.

Toledo Edison Company

2-

py

i 4 yone -

-

-

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

,

Sincerely yours,

!

9

.

.

Gaston Fiore111, Chief

Operations Branch

Enclosure:

.

.

RO Inspection Report

,

'

No. 050-346/74-09

.

s

.

.

,

,

.

.

bec: RO Chief, FS&EB

RO:HQ (4)

' '

,

- Licensing (4)

DR Central Files

'

UMffiles

-

PDR

-

'

Local PDR

NSIC

.

TIC

.

.

4

4

%

!

l

-

%

!

.

.;

1

-

-

. . _ . - . - _ ,

_ _ . _ _

.

-

- .

.

. -

_

- , - - - . . , . - . _ - .