0l
lu
UNITED STATES
,
.
f.
I
ATOMIC ENERGY COMMISSION
.
'j
DIRECTORATE OF REGULATORY OPERATIONS
k
,
REGION lli
A
85 #
799 ROOSEVELT ROAD .
-
GLEN ELLYN. ILLINOIS Sol 37
-
dt2) ass-2sso
.
1AN i '4 1975
,
e
Toledo Edison Company
Docket No. 50-346
ATTN:
Mr. Lowell E. Roe
Vice President, Power
-
Edison Plaza
300 Madison Avenue
Toledo, Ohio
43652
Gentlemen:
-
This refers to the inspection conducted by Messrs. R. Martin and H.
Dance of this office on November 25, 26, and 27, 1974, of activities at
Davis-Besse Unit 1 Construction Site authorized by AEC Construction
Permit CPPR-80 and to the discussion of our findings with J. Evans and
others of your staff at the conclusion of this inspection.
A copy of our report of'this inspection is enclosed and identifies the
areas examined during the inspection. Within these areas, the inspection
Ci
' records, interviews with plant personnel, and observations by the inspectors.
consisted of a selective examination of procedures and representative
No violations of AEC requirements were identified within the scope of
this inspection.
.
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the AEC's Public Document
Room.
If this report contains any information that you or your con-
tractors believe to be proprietary, it is necessary that you make a
written application to this office, within twenty days of your receipt
of this letter, to withhold such information from public disclosure.
Any such application unust include a full statement of the reasons for
which it is claimed that the information is proprietary, and should be
prepared so the proprietary information identified in the application is
contained in a separate part of the document.
Unless we receive an
application to withhold information or are otT.erwise contacted within
the specified time period, the written material identified in this
paragraph will be placed in the Public Document Room.
l
')
t
\\m
i
- '290733 9
.
..
.
.
..
_ _ .
-
.
7 ,.
.. _ ._
.
L
.
.
.
.,
.
Toledo Edison Company
2-
py
i 4 yone -
-
-
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
,
Sincerely yours,
!
9
.
.
Gaston Fiore111, Chief
Operations Branch
Enclosure:
.
.
RO Inspection Report
,
'
No. 050-346/74-09
.