Forwards Insp Rept 50-346/78-19 on 780606-08,13-15,20-23 & 0717-19.Noncompliance Noted in Div of Reactor Operations Insp Ltr
ML19329A959
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/15/1978
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Johnson W
TOLEDO EDISON CO.
Shared Package
ML19329A940 List:
References
NUDOCS 8001270211
Download: ML19329A959 (2)


See also: IR 05000346/1978019

Text

.

.

.

.

. . .

'-

q-

-

,

.e

.

7 ** "*%

t

UNITED STAMS

NUCLEAR REGULATORY COMMISSION

i

r

l

[

i #'

_ j.

REGloN ill

2

799 ROOSEVELT RoAo

GLEN ELLYN,ILLINotS 60137

,

g,

    • ..*

SEP 151978~

.

Docket No. 50-346

Toledo Edison Company

ATTN:

Mr. W. A. Johnson

Senior Vice President

Operations

l

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This letter refers to the inspection conducted at Davis-Besse

Nuclear Power Station, Unit 1 by Messrs. T. Tambling, J. Foster,

J. Menning and J. Streeter of our Region III office in Glen Ellyn,

Illinois, on June 6-8, 13-15, 20-23, and July 17-19, 1978. The

inspection was performed to review the reportable occurrence on

~

!

June 2, 1978, involving discovery of the design and installation

'

defects associated with the Safety Feature Actuation System

.

sequencer logic. The findings from this inspection were reviewed

'

I

with Mr. T. Murray, Plant Superintendent, and others of your staff

on June 8, 15, 23, and July 19, 1978 and with you and others on

August 16, 1978.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

,

Part 2. Title 10, Code of Federal Regulations, a copy of this

4

letter and the enclosed inspection report will be placed in the

NRC's Public Document Room, except as follows. If this report

contains information that you or your contractors believe to be

proprietary, you must apply in writing to this office, within

twenty days of your receipt of this letter, to withhold such

information from public disclosure. The application must include

a full statement of the reasons for which the information 4 con-

sidered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an

enclosure to the application.

A separate letter setting forth certain matters of concern and

the items of noncompliance found during this inspection hts been

',

sent from the Director, Division of Reactor Operations Inspection,

Office of Inspection and Enforcement. Your response to those

items should be made directly to that office.

O

i

,f

r,

'

r

8001270 A

.-

.

.

.

. .

-

.

-

.

.

-

.-

T

.

,

-s

e

L

Toledo Edison Company

-2-

$[p13{93

.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

James G. Keppler

Director

Enclomace: IE Inspection Rpt

No. 50-346/78-19

cc w/ encl:

Mr. J. Williamson, President

and Chief Executive

T. Murray, Station

Superintendent

Central Files

/ Reproduction Unit NRC 20b

s\\

PDR

Local FDR

NSIC

TIC

U. Yotng Park, Power

Siting Comunission

l

l

.

.

'

/~L

RIII /

_RIII

,

RIII

RIII

RIIJ

RIII

i

omce>

Tamblin dec

Knop

Menning

e

e

SURNAMED

_

_ _ _ ,

___

,

,,,,_

_,

______

,,,,,,,,,Tff,f/,7,(

_ ,,__

__

,,,,,,,,,

_,

'Fiorelli k,,,1.fy.1,,

DATA > _,9.f Lif_78__ _ _fsitt_

Foste

NRC Form 3108 (R!!!)(170) NRCM 0240

.u. s. nove nmeatnr en anne [,re2E asys-as u s?

W

-

-

_

_

_

_

_

.