ENCLOSURE 3 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. o. C. 20555 MAR 7 M
SUM 4ARY OF MEETING HELD IN BETHESDA ON THE DEVELOPMENT AND IMPLEMENTATION OF BABCOCK 4 WILCOX STANDARD TECHNICAL SPECIFICATIONS (B6W-STS)
On February 24, 1975, representatives from Duke Power Company, Florida Power Corporatian, Metropolitan Edison Company, Sacramento Municipal Utility District, Toledo Edison Company, Babcock & Wilcox Company, and the NRC met at the Phillips Building, Bethesda, Maryland. A list of attendees is enclosed.
'The purpose of the meeting was to discuss the B6W Utility Group review of the B6W-STS. Agenda items prepared by the Utility Group were discussed i
covering the following topics.
1.
Organization and interface with NRC for STS review.
1 2.
Time constraints for review completion, particularly as related to licensing of Davis-Besse.
3.
The need for inclusion in STS of requirements outside plant design.
a.
STS more restrictive than ASME code or design criteria.
b.
Response time testing.
c.
Channel calibration as defined in STS.
d.
Inclusion of non-nuclear safety-related equip $ent in LCO's.
4.
Acceptability of currently standardized B6W Tech Specs.
5.
Involvement of NRC regional personnel.
6.
Relationship of STT, to Environmental Tech Specs.
7.
Appropriateness of requirements for analysis in action section of STS.
8.
Use of B6W nomenclature.
9.
Legal status of bases.
s x..s$
._ _ q7
.s 2-MAR 7 M
- 10. Applicability of STS to non-177 plants.
- 11. Criteria for determining surveillance time requirements.
The details of the meeting and conclusions are presented in Enclosure 2.
The next meeting on March 4, 197S will review the specific comments on B4W-STS Definitions and Safety Limits.
h._
/ k hN(o C R. R. Bottimore, STS Group Operating Reactors Division of Reactor Licensing
Enclosures:
1.
Attendance List 2.
Summary of Meeting cc w/encls:
(
See next page 9
-~-w
. g7 g
ec w/encis:
Arkansas Power & Light Company ATIN: Mr. J. D. Phillips Vice President 4 Chief Engineer Sixth 6 Pine Streets Pine Bluff, Arkansas 71601 Duke Power Company AT1W: Mr. Austin C. Thies Senior Vice President 422 South Church Street P. O. Box 2178 Charlotte, North Carolina 28201 Florida Power Corporation ATTN: Mr. J. T. Rodgers Assistant Vice President P. O. Box 14042 St. Petersburg, Florida 33733 Metropolitan Edison Company s
(
ATIN: Mr. R. C. Arnold Vice President - Generation P. O. Box 542 Reading, Pennsylvania 19603 Sacramento Municipal Utility District AT1W:
Mr. E. K. Davis General Manager 6201 S. Street, P. O. Box 15830 Sacramento, California 95813 "Ihe Toledo Edison Company ATTN: Mr. Lowell E. Roe Vice President, Power Edison Pla::a 300 MMSon Avenue Toledo, Ohio 43652 Babcock & Wilcox Company ATIN:
Mr. James F. Mallay P. O. Box 1260 Lynchburg, Virginia 24505 v
e
~
. -m
)
ENCIASURE NO.1 ATTENDANCE LIST MEETING ON B6W STANDARD TECH SPECS NRC - STAFF L. B. Engle G. W. Manz R. E. Hall J. I. McMillen R. R. Bottimore A. Schwencer J. M. McGough K. R Go11er G. E. Lear D. H. Jaffe L. W. McDonough DUKE POWER COMPANY s
g T. L. Cotton FLORIDA POWER CORPORATION J. T. Rodgers B. Simpson J. Alberdi METROPOLITAN EDISON COMPA.W R. C. Arnold SACRAMENTO MUNICIPAL LTTILITY DISTRICT J. V. McColligan TOLEDO EDISON COMPA.W E. C. Novak J. Evans BABCOCK 8 WILCOX COMPA.W J. F. Mallay 7N F. J. Levandoski I
D. W. Montgomery "eep l
s ENCLOSURE NO. 2 DETAILS OF MEETING KEYED TO AGENDA ITEMS 1.
The Standard Technical Specification Group (STSG) will interface with the Utility Group during the review and development of the generic B4W-STS. The assigned Licensing Project Manager (LPM) will interface with the applicant during the implementation of the B5W-STS on individual dockets. The STSG will coordinate the implementation effort with the LPM and applicant to provide guidance and insure uniformity of applica-tion. The NRC will, upon request of the Utility Group, issue letters to each of the utilities in the group inviting their participation in the review and development of the B6W-STS.
2.
The review and development of the BSW-STS will be completed by June 30, 1975. The implementation of the STS on Davis-Besse Unit I will be done on a sectional basis following completion of each B6W-STS sectional review by approximately 30 days, All instances of STS requirements being more restrictive than 3.
a.
's ASME Code requirements or design criteria will be identified and resolved during the review of the specific STS sections.
b.
The requirement for periodic response time testing of the Reactor Protection System and certain Engineered Safety Features represents an established NRC position stated in the 5tdndard Review Plan. This requirement is necessary to confirm the validity of assumptions used in the accident analyses, The definition of Channel Calibration in the STS is consistent c.
with that used by IEEE-279 which requires the sensor to be included 3.n the calibration.
d.
All instances of inclusion of non-safety related specifications in the STS will be identified and resolved during review of specific sections.
4.
The Utility Group pointed out that technical specifications for current B6W 177 fuel element plants represented in their view "Standardi:ed 177 Technical Specifications" and were, therefore, suitable for use on the remaining 177 type plants to be licensed. They stated that the imposition of the NRC B5W-STS on 177 plants at this time was inappropriate and would involve an unnecessary expenditure of time and manpower to accommodate the review and modification of plant
/N
)
\\ _.
e
s m.
2-procedures and possible retraining of operations personnel.
- We r.oted the relevance of these factors and responded that we believed the overall gains to be achieved on a long term basis through the standardization effort would offset these concerns.
In addition, we noted that the B6W-STS'for 177 plants would be used as the. basis for development of STS's applicable to later generations of B&W plants now in the licensing process.
S.
OISE involvement in the B6W-STS review will be coordinated through Ray Hall of Headquarters according to previously established methods.
The assigned OI6E inspector will be invited to attend and participate in meetings when the B6W-STS is implemented on individual cases.
6.
Conflicts between the B6W-STS and the Environmental Technical Speci-fications will be identified and resolved during application on individual cases.
7.
The basis for definition of analysis requirements will be identified and resolved during the review of specific STS sections.
8.
B4W nomenclature will be used in the B4W-STS to describe systems,
\\
equipment and structures; however, the terminology for mode identi-fication will remain standardi:cd between the PWR vendors.
9.
The Bases for the B4W-STS are not a part of the technical specifications pursuant to 10 CFR 50.36 but do provide a summary statement.of the justification for each specification. Additional effort will be directed toward providing more definitive bases material during review of the B4W-STS.
t
- 10. As was noted in agenda item 4, the current B6W-STS will be used as the basis for STS's development for future classes of B6W plants.
I
- 11. The surveillance requirements in the B6W-STS are consistent with those used in other vendor ST 's for comparable equipment. The l
requirements represent the staff's best estimate of the frequency and type of testing required to insure equipment operability. based on data accumulated frca operating plants.
i l
ENCLOSURE 4 4
PROPOSED SCHEDULE FOR REVIEW OF B&W-STS TASK TARGET DATE FOR COMPLETION 1.
Review STS Sections e,
February 17, 1975
- 1. 0, 2.1, 2.2 and Bases 2.
Forward comments on February 24, 1975-STS Sections 1.0, 2.1, 2.2 and Bases
- 3.
Issue agenda for March 3,1975 meeting on STS Sections 1.0, 2.1, 2.2 and Bases.
Propcsed meeting date: March 19,1975**
4.
Review STS Sections March 17,1975 3/4.0 through 3/4.4 and Bases 5.
Forward comments on March 24,1975 STS Sections 3/4.0 through 3/4.4 and Bases 6.
Issue agenda for March 31,1975 meeting en STS sections 3/4.0 through 3/4.4 and Bases Proposed meeting date:
April 16,1975 7.
Review STS Sections May 12,1975 3/4.5 through 3/4.6 and Bases 8.
Forward ccmtents on May 19,1975 STS Sections 3/a.5 through 3/4.6 and Bases 9.
Issue agenda for May 26,1975 meeting on STS Sections 3/4.5 through 3/4.6 and i
Bases. Proposed meeting date:
June 11,1975.
- Witnin a week following review of the STS Sections, please inform us of particular comments on the sections under review.
Comments may be-forwarded in rough form by mail or telephone.
- Jithin one week of receipt of the comments the agenda of a review meeting, if required to be held, will be provided.
In addition to a complete review of the STS sections, we will be prepared to answer any other specific concerns.
~.
_g_
~
e TASK TARGET OATE FOR COMPLETI0t!
- 10. RevfewSTSSections June 9, 1975 3/4.7 through 3/4.10 and Bases
- 11. Forward comments on June 16,1975 STS Sections 3/4.7 through 3/4.10 and Bases
- 12. Issue agenda for June 23,1975 meeting on STS Sections 3/4.7 through 3/4.10 and Bases. Proposed meeting date: July.16,1975
- 13. Review STS Sections 5.1 July 14,1975 through 5.7 and 6.1 through 6.13.
14.
Forward comments on STS July 21,1975 Sections 5.1 through 5.7 and 6.1 through 6.13 l
15.
Issue agenda for meeting July 28,1975 on STS Sections 5.1 through 5.7 and 6.1 through 6.13.
Proposed meeting date: August 13, 1975 Please mail or telephone your comments and questions to:
Robert R. Bottimore, Jr.
P-904 US Atomic Energy Connission Washington, D. C.
20545 (301) 973-7744 e
t
ENCIDSURE 5
~
REVISED SCHEDULE FOR B&W STS TASK TARGET DATE FOR COMPLETION 1.
Review STS Sections February 17, 1975 (completed) 1.0 and 2.1 2.
Forward comments on February 24, 1975 (completed)
STS Sections 1.0 and 2.1 3.
NRC/B&W-UG meeting on March 19, 1975 (completed)
STS Sections 1.0 and 2.1 4.
Review STS Sections 2.2 and March 17, 1975 (completed Bases and 3/4.0 through 3/4.3 5.
Forward comments on March 24, 1975 (completed STS Sections 2.2 and Bases and 3/4.0 through 3/4.3 l
6.
NRC/B&W-UG meeting on April 16, 1975 (completed)
STS Sections 2.2 and Bases and 3/4.0 through 3/4.3 7.
Review STS Sections 3/4.4 April 23, 1975 (completed) through 3/4.8 8.
Forward comments on STS April 30, 1975 Sections 3/4.4 through 3/4.8 9.
NRC/B&W-UG meeting on STS May 14, 1975 Sections 3/4.4 through 3/4.8 10.
Review STS Sections 3/4.9 and May 21, 1975 3/4.10 LCO Bases, Design Features and Administrative Controls 11.
Forward comments on STS Sections Nby 28, 1975 3/4.9 and 3/4.10, LCO Bases,' Design Features and Administrative Controls 12.
NRC/B&W-UG meeting on STS Sections June 11, 1975 3/4.9 and 3/4.10, LCO Bases, Design Features and Administrative Controls
~~_
l
ENCLOSURE 6 SCHEDULE FOR B&W STS FOR DAVIS-BESSE, UNIT 1 TASK TARGET DATE FOR COMPLETION 1.
Review B&W STS Sections May 7, 1975 1.0; 2.1; 2.2 and Bases; 3/4.0 through 3/4.3 2.
Forward comments for Davis-May 14, 1975 Besse 1 STS Sections 1.0; 2.1; 2.2 and Bases; 3/4.0 through 3/4.3 3.
NRC/TECO meeting on Davis-May 28, 1975 Besse 1 STS Sections 1.0; 2.1; 2.2 and Bases; 3/4.0 through 3/4.3 l
4.
Review B&W STS Sections 3/4.4 June 4, 1975 through 3/4.8 5.
Forward comments for Davis-June 11, 1975 Besse 1 STS Sections 3/4.4 dirough 3/4.8 l
6.
NRC/TECO meeting on STS June 25, 1975 Sections 3/4.4 through 3/4.8 i
7.
Review B&W STS Sections 3/4.9 July 2, 1975 through 3/4.10, LCO Bases, Design Features and Administrative Controls 1
8.
Forward comments for Davis-Besse 1 July 16, 1975 STS Sections 3/4.9 through 3/4.10, 1
i LCO 3ases, Design Features,and Administrative Controls j
l 9.
NRC/TECO meeting on Davis-Besse 1 July 30, 1975 i.
STS Sections 3/4.9 through 3/4.10 i
LCO Bases, Design Features and kiministrative Controls I
i
~
i
Con't Enc 1"' urn 6 TASK TARGET DATE FOR COMPLETION
- 10. All Davis-Besse 1 STS conssents August 13, 1975 resolved 11.
Draft Davis-Besse 1 STS to August 20, 1975 Applicant for final review
- 12. Davis-Bessa 1 STS finalized September 19, 1975 i