ML19329A580

From kanterella
Jump to navigation Jump to search
Discusses Telcon W/Util Re Analysis of Steam Line Safety Valves
ML19329A580
Person / Time
Site: Oconee 
Issue date: 02/24/1972
From: Peltier I
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001070577
Download: ML19329A580 (1)


Text

,

(( { ~,p ] c) ~~~

~

FEB 2 41972 NCrrE TO FILES ANALYSIS OF STEAM LINE SAFETY VALVES ON OCONEE In a telecon with K. Canady, and Miller of Duke, it was learned that Oconee main steam line valves were analyzed for 1.

Dead weight loads 2.

Thermal stress 3.

l Static thrust loads (from relief valve action) 4.

Seismic (Dynamic) loads Primary system blowdown (LOCA) loads were not analyzed because "onee' through" steam generators are rigidly mounted and these loads are not transmitted to the steam line.

hk I. A. Peltier cc:

A. Schwencer I. Peltier e

' k l

p 8001070 [ 7 7 g

.._ _