Forwards IE Insp Repts 50-269/75-09,50-270/75-10 & 50-287/75-10 on 750729-31.Noncompliance Noted
ML19329A459
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/27/1975
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19329A460 List:
References
NUDOCS 8001031026
Download: ML19329A459 (2)


See also: IR 05000269/1975009

Text

_ _ .

- - . .

- - .....--- - - - - -...-.

.-

-

v, ,s l

,

,

..,

.

'

.O

.py

-

-

.

l

-

UNITED STATES

6

1

j

l

-

NUCLEAR REGULATORY COMMISSION

/

,_

REGION il

n.

!

230 PE ACHTR EE STREET N. W. $UITE SIS

ATLAN TA. GEO RCI A 30303

In Reply Refer To:

'

IE:II:TNE

50-269/75-9

.

50-270/75-10

50-287/75-10

-

-

Duke Power Company

ATIN:

Mr. Wipliam O. Parker, Jr.

Vice President

-

Steam Production

P. O. Box 2178

422 South Church Street

Charlotte, North Carolina

28242

Gentlemen:

,

This refers to the inspection conducted by Mr. T. N. Epps of this effice

on July 29-31, 1975, of activities authorized by URC Operating License Nos.

'

DPR-38, DPR-47 and DPR-55 for the Oconee 1, 2 and 3 facilities, and to the

discussion of our findings held with Mr. J. E. Smith at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

l

We have examined actions you have taken.vith regard to previously reported

unresolve'd items.

These are identified in Section IV of the sum nry of the

'

enclosed report.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirecents.

Thet.c items

and references to pertinent require =ents are listed in Section I of the

i

l

summary of the enclosed report. Additional information on Abnorcal Occur-

i

rence A0-287/75-7 in your letter dated Auwst 8,1975, was received by

this office.

No additional response is requested.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Fedaral Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you believe

tuTio9

%-

~~

[*

C

A %' T]h

/

if

7

\\p

8 001031'D/ t$

>>y.ge

du

.

__

.

.f.*

AUG 2 71975

.

.

.

.

.

!

.

.

i

Duke Power Company

. .

-2-

'

<

74

-

.

to be proprietary, it is necessary that you submit a written application

to this office requesting that such information be withheld from public

disclosure.

If no proprietary information is identified, a written

statement to that ef fect should be submitted.

If an application is

submitted, it must fully identify the bases for which information is

claiced to be proprietary. The application should be prepared so that

information sought to be withheld is incorporated in a separate paper

and referenced in the application since the application will be placed

in the Public Document Room.

Your application, or written statement,

should be submitted to us within 20 days.

If we are not contacted as

specified, thi enclosed report and this letter may then be placed in

the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Very truly yours,

.

.

',

( *, ci.

<

Norman C. Moseley

Director

Enclosure:

IE Inspection Report Nos.

50-269/75-9, 50-270/75-10,

f

and 50-287/75-10