UNITED STATES NUCLEAR REGULATORY COMMISSION W ASHINGToN, D.
C. 20555 AUG 181975 R. E. lleineman, Director, Division of Technical Review TECIINICAL ASSISTANCE REQUEST NO. ORB-1 172 Your assistance is requested for the following:
PLANT NAME:
Oc e Units 1, 2, and 3 DOCKET NOS.:
-269 50-270, and 50-287 RESPONSIBLE BRANCH:
ORB #1 i
CONTACT:
Gary G. Zech (x-7434) l TECTINICAL REVIEW BRANCll:
Effluent Treatment Systems Branch DESCRIPTION OF REQUEST:
By the enclosed letter of June 23.1975, and referenced document entitled "Oconce Nuclear Station Waste Management Facility Safety Analysis Report", Duke Power Company has identified the design objectives and criteria to be incorporated into the stations' per-manent waste facility.
An interim waste facility was constructed at Oconec after Units 1 and 2 were licensed and prior to fuel loading of Unit 3.
The interim facility was considered necessary af ter it was determined that the original f acility, as described in the FSAR, would not be adequate to process the expected volume of liquid wastes.
It should be noted that the licensee has inferred that the design of tho perunnent facility involves no unreviewed safety questions as defined in 10 CFR 650.59.
In addition, there are no changes to te operating licenses or technical specifications involved in this facility modification.
\\
s
,,wn..-
,s ku n
. w u.. +
a e
..,9.
,w c
Qcw n 01020 80
's u
is
}
Q:'
fN[
2-AUG 181375 R. E. lleineman It is requested that Technical Review review the referenced safety analysis report for the Oconee permanent waste facility to determine hbther we agree with the licensee that no w
unreviewed safety questions are involvalas are defined in 10 CPR 550.59. This report has been previously provided to the Effluent Treatment Systems Branch.
TARGET DATE FOR COMPLETION: September 30, 1975 Of Of Robert A. Purple, Chief Operating Reactors Branch #1 i
Division of Reactor Licensing
Enclosure:
Duke Power Company's letter dated June 23, 1975 l
cc w/ enclosure:
l J. Collins, ETSB l
cc w/o enclosure:
D. Eisenhut I
K. Goller T. Carter R. Purple G. Zech S. Sheppard DISTRIBUTION Docket File ORB #1 Reading Subj File RL:0RB#1 RL:0RB#1 orric.
GZech de..,_.hRAPurp.le 1
i 8/18/75 8/16 / 75 s
I Ferns AIC319 (Rev. 9-53) ABCM 0244 W u. s.novsawusar ensurine orrics sete.es see
(