Forwards Safety Insp Rept 50-443/89-14 on 891016-20.No Violations Noted
ML19327C188
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 11/09/1989
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Ellen Brown
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML19327C189 List:
References
NUDOCS 8911210128
Download: ML19327C188 (2)


See also: IR 05000443/1989014

Text

,3

y.

,,

,

-

- - - - - - - - _ _ _ - - - - - -

r ., . ,

.

,

,

.C'

!

'

.,

m

e

>

l

NOV 0 91989

.;

[o.

[

. . -

'

li

' Docket No~ 50-443

m

,

i

Public Service Company of New Hampshire

'

' ~

ATTN: Mr. Edward A. Brown,' President

.

and Chief Executive

ificer

'

,

'

New Hampshire Yankee Division

P

Post Office. Box 300

Seabrook, New Hampshire 03874

t

I

-

Gentlemen:

i

,

,

,

. Subject: . NRC Inspection Report No. 50-443/89-14

!

This letter refers to the routine safety inspection conducted by

)

H

Mr. A. L. Della Greca of this office on October 16-20, 1989 at the Seabrook

~

, Nuclear Power Station'of the activities authorized by NRC License No. NPF-56

and to the discussion of our findings held by Mr. Della Greca with members of

i

your. staff at the conclusion of the inspection,

t

r

i

Areas examined during this inspection included your corrective actions

,

{

-

associated with four open items relating to the environmental qualification

g ,

L.

of Raychem splices described'in the NRC Region I Inspection Report which is

.

'

enclosed with:this letter. Within this area, the inspection consisted of

!

o

selective examinations of procedures and representative records, interviews

!

[

with personnel, and' observations by the inspector.

t

)

'Your corrective actions for the four open items were found to be acceptable and

!

~

O'

the issues are closed,

i

i

Within the scope of this inspection, no violation were observed.

i

e

No reply to this letter is required.

Your cooperation with us on this subject

l

[

is' appreciated.

i

!

Sincerely

[

- -

Original Signed ByI

% " v P. Tiv.-

i

i

Jatque P. Durr, chief

Engineering Branch

i

Division of Reactor Safety

[

,

!

Enclosure: NRC Region I Inspection Report Nueber 50-443/89-14

.

!

.

.t

1

r i

.

,

OFFICIAL RECORD COPY

ND SB89-14 - 0001.0.0

11/06/89

891121012e e97 top

3

1

gDR

ADOCK 0500o443

.

. PDC

_

%.

-

..

,

NDY 0 91989

i

,.

Public Service Company

2

.c -

of New Hampshire

,

cc w/ enc 1:

J. C. Duffett, President and Chief Executive Officer, PSNH

T. C. Feigenbaum, Senior Vice President and Chief Operating Officer, NHY

J. M. Peschel, Operational Programs Manager, NHY

i

D. E. Moody, Station Manager, NHY

.

T. Harpster, Director of Licensing Services

-

P. W. Agnes, Jr., Assistant Secretary of Public Safety, Commonwealth of

i

Massachusett

i

Public Document Room (PDR)-

Local Public Document Room (LPDR)

NuclearSafetyInformationCenter(NSIC)

NRC Resident Inspector

State of New Hampshire

-

Commonwealth of Massachusetts

Seabrook Hearing Service list

bec w/ enc 1:

Region I Docket Room (with concurrences)

,

Management Assistant, DRMA (w/o enc 1)

' E. McCabe, DRP

i

J. Johnson, DRP

i

SRI - Seabrook (w/ concurrences)

!

V.' Nerses, NRR

K. Abraham, PA0 (20) SALP Reports and All Inspection Reports

J. Dyer, EDO

!

!

.

,

l'

l

,

L

!

1

-

i

!

6l*

RI:DRS

RI:DRS

RI:DRS

~

D

aGreca

Anderson

Durr

11/e' /89

11/I/89

'11/7/89

'

l

l'

0FFICIAL RECORD COPY

ND SB89-14 - 0002.0.0

l'

10/27/89

.