Text
~
<
-
. g.
1.y
pj4
N .3 4 a , ,
.'
1
n
gg
g'
@
g'
'
In Reply Refor To:
,,
E
Docket: 50-285/89-33'
}y
,
-
,
..
-Qasha Public Power District
'i
.
,
ATTN: Mr. Kenneth J. Morris, Division Manager
l
!
-
. Nuclear' Operations-
t
'
'
444 South 16th Street Mall
>
Omaha, Nebraska . 68102-2247
{
4
,
'
' Gentlemen:
l
'
.
This refers to the inspection conducted by Messrs. P. Harrell, G. Pick, and
H
T. Reis of this office during the period September 1 through October 10, 1989,
,
of activities authorized by NRC Operating License DPR-40 for the Fort Calhoun
Station, and to the. discussion of our findings with you and other members of
l
your staff.at the conclusion of.the inspection,
j
Areas examined during the inspection includ$d licensee event report followup;
f
- operational safety verifications plant tours; monthly maintenance observations;
j
monthly surveillance observations; security observations; radiological
!
protection observations; inoffice review of periodic, special, and nonroutine
!
(
event reports; and review of onsite events. Within these areas, the inspection
!
consisted of selective examination of procedures and representative records,
!
l
interviews with personnel, and observations by the inspectors. The inspection
!
l
findings erw documented in the enclosed inspection' report.
1
,
During this inspection, it was found that"certain of.your activities were in
!
,
violation of NRC requirements. Consequently, you are mquired to respond to
l-
these violations, in writing, in accordance with'the' provisions of
!
Section 2.201 of the NRC's " Rules of Practice," Part 2. Title 10, Code of
"
,
l'
Federal Regulations. Your response should be based on the specifics contained
1
i
in the Notice of Violation enclosed with;this letter. 'In addition, you are
i
l'
requested in your response to Violation A to address whether or not the
!
effectiveness of the Radiological Emergency Response plan was reduced when the
-l
!
- change in personnel monitoring device requirements of Section 1.4.1 of
l
Appendix.J of.the plan were instituted without prior NRC approval.
Additionally, it was' found that certain other of.your activities were in
l
violation of.NRC requirements. However, in accordance with Section V.A. of the
i
NRC's Enforcement Policy, the violation is not being cited. This action was
j
S,
.:taken to' encourage and support your self-identification and correction of
i
, problens. The noncited violation is discussed in paragraph 7.b of the enclosed
.
. inspection report.
.,
m
,
-
i
'
a RIV:R
. SRI
DRP/B
C:DRP/
- DRP
\\
TRei nc,
PHH
11
RPMu111 kin
TFVesterman
Milhoan
'
<
10/ /89
10/
89
l0 /p/89
f/Q/89
ft/ M 89
h
j
,
h
Y
%
s
.
i
'8911130064 891102
'
ADOCK 05000285
'
.. 4
Q
,
,
~
PDC'.
,
.
. -
.
. . .
. .
.
f
-.
_.
_
._.
y
,-
,
n.
.d'
'
0
- 4
L: p, . ' ,, " i
,,
e
,
.
,
'
Omaha Public Power District
-2-
,
,
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 3 of the enclosed report,
,
e
The responses directed by this letter and the accompanying Notice art not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, FL 96-511
l
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
,.
-
Sincerely,
)
,'
OW signed Br.
i
'
,
Thomas P.Gwynn
James L. Milhoan, Director
!
-
Division of Reactor Projects.
i
i
Enclosures:
1.
Appendix A - Notice of Violation
i
'
2.
Appendix B - NRC Inspection Report
h
50-285/89-33
7
,
cc w/ enclosures:
!
4
. .
l
LeBoeuf Lamb, Leiby & MacRae
ATTN: Harry H. Voigt. Esq.
i
1333 New Hampshire Avenue, NW
!
' Washington..D.C.
20036
- ,
Washirgton County Board
i
of Supervisors
ATTN: Jack Jensen, Chairman
i
Blair, Nebraska 68008
l
U.S. Nuclear Regulatory Commission
I.
ATTN: Senior Resident Inspector
T
P.O. Box 309
1
Fort Calhoun, Nebraska 68023
-!
Combustion Engineering, Inc.
D
. ATTN: Charles B. Brinkman, Manager
Washington Nuclear Operations
12300 Twinbrook Parkway, Suite 330
Rockville, MD 20852
U.S. Nuclear Regulatory Comission
ATTN: Regional Administrator, Region IV
l
611 Ryan Plaza Drive. Suite 1000-
Arlington, Texas 76011
.
&
,
m
3
.
.[ . .
'
~
,n
I
.t<
i
'Dmaha Public Powcr District
-3-
l
t.
L
,
[t ,
l
'
Department of Health
1
'
ATTN:
Harold Borchert, Director
Division of Radiological Health
!-
301 Ceistennial Mall, South
!
P.O. Box 95007
!
Linccin, Nebraska 68509
Fort Calhoun Station
l
ATTN: - G. R. Peterson, Manager
,
'
P.D. Box 399
Fort Calhoun, Nebraska 68023
l
\\
'
bec to DMB (IE01)
bec distrib by RIV:
R. D. Martin, RA
- MIS System
- Section Chief (DRP/B)
- DRP
i
- RIV File
- Project Engineer (DRP/B)
- RSTS Operator-
- A. Bournia, NRR Project Manager (MS 13-D-14)
'-
-
Lisa Shea, RM/ALF
- RRI
d.t
- DRS
- RPB-DRSS
I
- w/766
!
I
t
I
i
,
b
!
s
?
i
'
,
f
!
!
i