Forwards Safety Insp Rept 50-423/89-14 on 890718-0828 & Notice of Violation.Requests Reasons for Failure to Repair Steam Generator Blowdown Radiation Monitor in Timely Manner & Plan for Restoring Monitor to Svc
ML19327B508
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/18/1989
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19327B509 List:
References
NUDOCS 8910310324
Download: ML19327B508 (2)


See also: IR 05000423/1989014

Text

y

,

~

[ ' 'c

Eq

ti

V

1:

...

..

,

,

.;

'

OCT 181999

Docket / License: 50-423/NPF-49

i

Northeast Nuclear Energy Company

l

"

ATTN: Mr. Edward J. Mroczka

c

Senior Vice President - Nuclear

i

Engineering'and Operations Group

'

P.O. Box 270

Hartford, Connecticut

06101-0270

,

Gentlemen:

'

Subject: Millstone 3 Routine' Inspection 50-423/89-14

This refers to the routine resident, safety inspection conducted from July 18

-through August 28, 1989 at the Millstone Nuclear Power Station, Unit 3.

The

results of the inspection are described in the NRC Region I inspection report

'

enclosed with this lettet and were discussed with Mr. C. H. Clement of your

staff at the conclusion of the inspection.

As specif,ied in the enclosed Notice of Violation (Appendix A), certain activi-

ties apparently were not conducted in full compliance with NRC requirements.

This violation; involved failure to report to the NRC an event which rendered

inoperable a system designed to control the release of radioactive material. A

response to this violation is required and should address the items listed in

,

Appendix A.

Also, as described in the enclosed inspection report, we note that a steam

generator blowdown radiation monitor, which is required by the technical

,

specifications to be operable, has been out of service for 3.5 years,.which we

!

consider an excessive length of time. We request that you provide to us,

'

within thirty days of the receipt of this letter, a written response that

describes the reasons for failure to repair the monitor in a timely manner, and

.;

outline to us a plan for restoring the monitor to service.

Your cooperation with us is appreciated.

Sincerely,

0:. a .L E .E0 SY

EDV.'A'iD C. WEiNGER

Edward C. Wenzinger, Chief

Projects Branch No. 4

Division of Reactor Projects

Enclosures:

1;

Appendix A, Notice of Violation

2.

NRC 3egion I Inspection Report 50-423/89-14

.

s\\

OFFICIAL RECORD COPY

IR MILL 3 89-14 - 0001.0.0

[\\\\

10/14/89

U

0910310324 891018

,

'PDR

ADOCK 05000423

O

PDC

_

_

r::( u.,,

' . eL ,

p

2

~

OCT 181989

Northeast Nuclear. Energy Company

2

,

c

,

cc w/encis:

W. D. Romber,, Vice President, Nuclear Operations

'

R, M. Kacich, Manager, Generation Facilities Licensing

'

,

'

D. O. Nordquist, Director of Quality Services

S. E, Scace, Station Superintendent

-

l

D. B. Miller, Station Superintendent, Haddam Neck

,

'

Public Document Room (PDR)

s

e

Local Public Document Room (LPDR)

. Nuclear Safety Information Center (NSIC)

,

NRC Senior Resident Inspector

'

State of Connecticut '

t

F

bec w/encls:

Region I Docket Room (with concurrences)

C. Anderson,'DRS (Section 3.01

' Management Assistant, DRMA (w/o enclosures)

D. Jaffe, LPM, NP.R

p

DRP Section Chief

W. Raymond, SRI, Millstone

D. Kolaczyk, RI, Millstone 3

'

T. Shediosky, SRI, Haddam Neck

t

,

!

l

l

l

,

{

l

? s,'

gef

RI:DRP

RI:DRP

WR'f

Pk*

9

aymond/pj

DHaverkamp

e?. zinger

10/11/89

10/u/89

10/j g/89

l

0FFICIAL RECORD COPY

IR MILL 3 89-14 - 0002.0.0

10/14/89

1

,

. _

_

_

_