1 APPENDIX A NOTICE OF VIOLATION Northeast Nuclear Energy Company Docket No. 50-423 Millstone Unit 3 License No. OPR-65 During a routine resident inspection from July 18 through August 28, 1989, the following violation was identified in accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C:
10 CFR 50.73 (a)(2)(vii)(C) requires the holder of an operating license for a' nuclear power plant to submit within thirty days a Licensee Event Report (L'ER) for any event that occurs which causes two independent trains or channels to become inoperable in a single system designed to control the release of radioactive material.
Contrary to the above, on May 24, 1989, while fuel movement was in pro-gress in the fuel building, a security guard opened a roll-up door in the j
fuel building which effectively rendered the two fuel building independent ventilt. tion trains inoperable.
l As of August 28, 1989, the licensee had not submitted an LER for the event.
]
This is a Severity Level IV Violation (Supplement I).
Pursuant to 10 CFR 2.201, Northeast Nuclear Energy Company is hereby re-I quired to submit to this office, within thirty days of the date of the letter which transmits this Notice, a written statement or explanation in i
reply including: (1) the corrective steps taken and results achieved; (2) corrective steps to be taken to avoid further violations; (3) the date 3
when full compliance will be achieved. Where good cause is shown, con-l sideration will be given to extending this response time.
L l
l l
8910310325 891018 PDR ADOCK 05000423 o
. -.