ML19327B467

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-293/89-08 on 890711-0821.No Violations Noted.Addl Licensee Mgt Attention Warranted in Procedural Adequacy & Procedural Compliance
ML19327B467
Person / Time
Site: Pilgrim
Issue date: 10/18/1989
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML19327B468 List:
References
NUDOCS 8910310245
Download: ML19327B467 (3)


See also: IR 05000293/1989008

Text

R. _ '

___

,

-

<

,

'

',

&+f ,

'

g

,[

,; f

~

,

< ~ ' ~

j

. ' , '

i

,

+

+

~ ,

.

it ,

OCT 181989

.

j

-

,'

l'1

1

>

c

ls

.

,

~

Docket, No.-50.293.

.$

s

.

q

,

Boston' Edison Company'

.

'

'

O

, >

ATTN:.

Mr'.' Ralph G. Bird

,

4.,

.

Senior.Vice' President-Nuclear

'

e ,'

Rocky Hill. Road .;

02360

Plymouth, Massachusetts

'

<

,

s

' Gentlemen:

,

e

<

B ;;

Subject: LNRC Region.I-Inspection Report'No. 50-293/89-08

,

.This' refers to the inspwction conducted by the NRC Restart Staff from July 11

-

-

through August 21',l1989 at the Pilgrim Nuclear Power Station, Plymouth,

Massachusetts.:. Areas examined during this inspection are described in the NRC

Region I Inspection-Report which is enclosed with this letter.

,

+

1

The. Restart Staff, through extended shift inspections and routine program _ in-

s

'3

-spections, observed management controls and' conduct of operations at the 50%

'

power plateau 'of the licensee's Power Ascension Test Program, as well as ascen-

' sion to;75% power.

Based on these reviews, the Restart Staff determined that

%'

additional'11censee management attention is warranted in procedural adequacy

'

and procedural compliance. These issues were involved in air ejector problems

4

that led to a manual reactor scram on July 18, 1989 and in the condensate sys-

p, ,

tem suction. strainer damage _on August 2, 1989.

'

Your cooperation with us in this matter is appreciated.

'

[".

i

Sincerely,

Original Signed By:

.

NA

Samuel J. Collins, Deputy Director

Division of Reactor Projects

E

' Enclosure: NRC Region I Inspection Report No. 50-293/89-08 w/ attachments

~\\', . .

.,

W,

o

J

f

e

4

0FFICIAL RECORD COPY

IR PILGRIM 89-08 - 0001.0.0

10/05/89

220lI

'

.

.

...

-

. ..

.-.

,

, , . .

.

.

-,

9

'

. , . .

,

- -

g;

,

^

'

007 1 8 1989

Boston Edison Company ~

2

cc w/ enc 1:

.

K. Highfill, Vice President - Nuclear Operations

6

R. Anderson, Plant Manager

-

R. Swanson,. Nuclear Engineering Department Manager

i

J. Dietrich, Licensing. Division Manager

E._ Robinson, Nuclear Information Manager

The Honc able Edward M. Kennedy

.

The Honorable John F. Kerry

.

The Honorable Edward.J. Markey

The Honorable Edward P. Kirby

The Honorable: Peter V. Forman

The Honorable Nicholas J. Costello

The Honorable Lawrence R. Alexander

' B. McIntyre, Chairman, Department of Public Utilities

Chairman, Plymouth Board of' Selectmen

Chairman, Duxbury Board of Selectmen

Plymouth Civil Defense Director-

Assistant Secretary of Public Safety, Commonwealth of Massachusetts

Secretary of Energy Resources, Commonwealth of Massachusetts

R. Shimshak, MASSPIRG

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident' Inspector

. Commonwealth of Massachusetts (2)

s

0FFICIAL RECORD COPY

IR PILGRIM 89-08 - 0002.0.0

09/22/89

.

.

pe e

.

,

~

71

f Gj[. f

, , ~

'

'l

'

,

m.s .c4 <

mg .-

fh; ' '

y Boston-Edison' Company

3

007181m

-

,

,

_

p. , , . .

.

.

!

G,

.bec w/ encl:~ ' '

.

~ Region'I Docket Room (with concurrences)

' Management Assistant, DRMA (w/o enc 1)

N, .-

W. Russell, Region I

.

T.' Martin,:RI-

W Kane,-RI

']

'B. Boger,).I

'

.

.

.

N. Knapp, RI

J.' Johnson, RI

t

R. Blough, RI

R. Bellamy, RI

~

,

J. Durr, RI'

R. Gallo; RI

(

s

.

L. Kolonauskt, RI

'

E'. Conner,'RI.

-

R. Bores, RI

M. Miller, RI .

"

'K. Abraham,'RI

T. Rebelowski, RI

,

-

.T. Fish, RI

T. Dragoun, RI (See Section 3.0)

R. Wessman, NRR

- D.' Mcdonald, NRR

>

.J. Bongarra,.NRR

K. Eccleston, NRR'

M.' Hunemuller, NRR

.

.C. Warren,- SRI - Arkansas Nuclear One'

,

C.' Marschall, SRI - Pilgrim Station

3

-

T. Kim, RI - Pilgrim Station

C. Carpenter, RI - P11 glim Station

G. Bethke, NRC Contractor

1

f

,.

y RI:DRP'

RI:DRP

RI:DRP

f

NC.Marschall/mo

'

R

uh

J

n

b

9/22/89

) ~~

y;

y)

0FFICIAL RECORD COPY

IR PILGRIM 89-08 - 0003.0.0

09/22/89

'

,

~.

- - , - . - - - . . . . - _ . . - -

- .

-

-