R. _ '
___
,
-
<
,
'
',
&+f ,
'
g
,[
,; f
~
,
< ~ ' ~
j
. ' , '
i
,
+
+
~ ,
.
it ,
OCT 181989
.
j
-
,'
l'1
1
>
c
ls
.
,
~
Docket, No.-50.293.
.$
s
.
q
,
Boston' Edison Company'
- .
'
'
O
, >
ATTN:.
Mr'.' Ralph G. Bird
,
4.,
.
Senior.Vice' President-Nuclear
'
e ,'
Rocky Hill. Road .;
02360
Plymouth, Massachusetts
'
- <
,
s
' Gentlemen:
,
e
<
B ;;
Subject: LNRC Region.I-Inspection Report'No. 50-293/89-08
,
.This' refers to the inspwction conducted by the NRC Restart Staff from July 11
-
-
through August 21',l1989 at the Pilgrim Nuclear Power Station, Plymouth,
Massachusetts.:. Areas examined during this inspection are described in the NRC
Region I Inspection-Report which is enclosed with this letter.
,
+
1
- The. Restart Staff, through extended shift inspections and routine program _ in-
s
'3
-spections, observed management controls and' conduct of operations at the 50%
'
- power plateau 'of the licensee's Power Ascension Test Program, as well as ascen-
' sion to;75% power.
Based on these reviews, the Restart Staff determined that
%'
additional'11censee management attention is warranted in procedural adequacy
'
- and procedural compliance. These issues were involved in air ejector problems
4
that led to a manual reactor scram on July 18, 1989 and in the condensate sys-
p, ,
tem suction. strainer damage _on August 2, 1989.
'
Your cooperation with us in this matter is appreciated.
'
[".
i
Sincerely,
Original Signed By:
.
NA
Samuel J. Collins, Deputy Director
Division of Reactor Projects
E
' Enclosure: NRC Region I Inspection Report No. 50-293/89-08 w/ attachments
~\\', . .
.,
W,
o
J
f
e
4
0FFICIAL RECORD COPY
IR PILGRIM 89-08 - 0001.0.0
10/05/89
220lI
'
.
.
...
-
. ..
.-.
,
, , . .
.
.
-,
9
'
. , . .
,
- -
g;
,
^
'
007 1 8 1989
Boston Edison Company ~
2
cc w/ enc 1:
.
K. Highfill, Vice President - Nuclear Operations
6
R. Anderson, Plant Manager
-
R. Swanson,. Nuclear Engineering Department Manager
i
J. Dietrich, Licensing. Division Manager
E._ Robinson, Nuclear Information Manager
The Honc able Edward M. Kennedy
.
The Honorable John F. Kerry
.
The Honorable Edward.J. Markey
The Honorable Edward P. Kirby
The Honorable: Peter V. Forman
The Honorable Nicholas J. Costello
The Honorable Lawrence R. Alexander
' B. McIntyre, Chairman, Department of Public Utilities
Chairman, Plymouth Board of' Selectmen
Chairman, Duxbury Board of Selectmen
Plymouth Civil Defense Director-
Assistant Secretary of Public Safety, Commonwealth of Massachusetts
Secretary of Energy Resources, Commonwealth of Massachusetts
R. Shimshak, MASSPIRG
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident' Inspector
. Commonwealth of Massachusetts (2)
s
0FFICIAL RECORD COPY
IR PILGRIM 89-08 - 0002.0.0
09/22/89
.
.
pe e
.
,
~
71
f Gj[. f
, , ~
'
'l
'
,
m.s .c4 <
mg .-
fh; ' '
y Boston-Edison' Company
3
007181m
-
,
,
_
p. , , . .
.
.
!
G,
.bec w/ encl:~ ' '
.
~ Region'I Docket Room (with concurrences)
' Management Assistant, DRMA (w/o enc 1)
N, .-
W. Russell, Region I
.
T.' Martin,:RI-
W Kane,-RI
']
'B. Boger,).I
'
.
.
.
N. Knapp, RI
J.' Johnson, RI
t
R. Blough, RI
R. Bellamy, RI
~
,
J. Durr, RI'
R. Gallo; RI
(
s
.
L. Kolonauskt, RI
'
E'. Conner,'RI.
-
R. Bores, RI
M. Miller, RI .
"
'K. Abraham,'RI
T. Rebelowski, RI
,
-
.T. Fish, RI
T. Dragoun, RI (See Section 3.0)
R. Wessman, NRR
- D.' Mcdonald, NRR
>
.J. Bongarra,.NRR
- K. Eccleston, NRR'
M.' Hunemuller, NRR
.
.C. Warren,- SRI - Arkansas Nuclear One'
,
C.' Marschall, SRI - Pilgrim Station
3
-
T. Kim, RI - Pilgrim Station
C. Carpenter, RI - P11 glim Station
G. Bethke, NRC Contractor
1
f
,.
y RI:DRP'
RI:DRP
RI:DRP
f
NC.Marschall/mo
'
R
uh
J
n
b
9/22/89
) ~~
y;
y)
0FFICIAL RECORD COPY
IR PILGRIM 89-08 - 0003.0.0
09/22/89
'
,
~.
- - , - . - - - . . . . - _ . . - -
- .
-
-