ML19327A887

From kanterella
Jump to navigation Jump to search
Confirms Meeting Arrangements Re 891020 Enforcement Conference in Region II Ofc to Discuss Problems Associated W/Control Room Ventilation Sys & Annulus Ventilation Sys
ML19327A887
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 10/03/1989
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8910180361
Download: ML19327A887 (4)


Text

y._

e,,-

00T 03 2 e

i Docket Nos. 50-369, 50-370 i

L License Nos. NPF-9, NPF-17 j

i Duke Power Company g

L ATTN: Mr. H. B. Tucker, Vice President i

Nuclear Production Department l-422 South Church Street i

Charlotte, North Caroline 28242 1

)

Gentlemen:

L

SUBJECT:

CONFIRMATION OF MEETING ARRANGEMENTS - MCGUIRE UNITS 1 AND 2

,,/

i-This confirms the arrangements made between Mr. J. S. Warren of Duke Power Company and Mr. A. R. Herdt of my staff concerning an enforcement conference to be conducted in the Region 11 office on October 20, 1989, at 1:00 p.m._

The purpose of the meeting will be to discuss your recent problems associated with the Control Room Ventilation System and the Annulus Ventilation Systems.

Specific areas we would like you to address are identified in the enclosure.

i o

Should you have any_ questions regarding these arrangements, we will be pleasea 4

to discuss them.

Sincerely.

O ricQM @M gdw&

t=: ed. bsnp Stewart D. Ebneter i

Regional Administrator

Enclosure:

Ventilation System Items

-cc w/ enc 1:

T. L. M6Connell Station Manager McGuire Nuclear Station P. O. Box 488 Cornelius, NC 28031 J. S. Warren Nuclear Production Department Duke Power Company P. O. Box 33189 Charlotte, NC 28242 (cc w/ enc 1 cont'd - see page 2) 8910180361 891003 DR ADOCK O$00 p9 s

e s.

[

Duke Power Company 2

OCT 0 31989 I[

t cc w/ enc 1: Cont'd I

A. V. Carr, Esq.

Duke Power Company 422 South Church Street Charlotte, NC 28242 f

J. Michael McGarry, III Esq.

Bishop. Cook, Purcell and Reynolds 1400 L Street, NW Washington, D. C.

20005 Dayne H. Brown,_ Chief Radiation Protection Branch Division of Facility Services N. C. Department of Human Resources 701 Barbour Drive Raleigh, NC 27603-2008 County Manager of Mecklenburg County 720 East Fourth Street Charlotte, NC 28202 S. S. Kilborn, Area Manager Mid-South Area ESSD Project Westinghouse Electric Corporation MNC West Tower - Bay 239 P. O. Box 355-Pittsburgh, PA 15230 Dr. John M. Barry Department of Environmental Health Mecklenburg County j

1200 Blythe Boulevard Charlotte, NC 28203 Karen-E Long Assistant Attorney General N. C. Department of Justice P. O. Box 629 Raleigh, NC 27602 State of North Carolina i

i

)

Duke Power Company 3

007 03 seg bec w/ enc 1:

D. Hood, NRR Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Commission 12700 Hagers Ferry Rd.

Huntersville, NC 28078-8985

)

L l.

RII;,DJ RI :

R P

RII:

P RI -

/

RII:DRS

'B onser Shymiock AHerdt eyes nt ns AGibson Jt/g/89 9/q/89 9/)q/89

/,l/89 /F/3 89 9/ /89

/0 11.

i

^s

?

l ENCLOSURE VENTILATION SYSTEM ITEMS Control Room Yentilation System System description including design basis Sequence of events which led to the discovery of inadequacies in r

l design and testing of the system i'

Safety significance of the problem i

Description of short-term and long-term corrective actions 1

i Annulus Ventilation System System description including design basis Sequence of events which led to the discovery of inadequacies in design and testing of the system Safety significance of problem Description of other problems discovered with the system and results of your evaluations including:

Potential failures leading to the system running in constant discharge; qualification of preheater wiring; duct flooding; and two train operation leading to failure of i

filter preheaters to start.

Description of NRC Infomation Notice tracking program and enhancements being made to the program.

Description of why the Special Task Force set up as a result of Hydrogen Skimmer system problems (Inspection Report 369,3870/89-24) did not identify the other ventilation system problems, t

l-

,