70;

%._. y, x October 5, 1989 Docket No. 50-302 Florida Power Corporation JATTN:a Mr. Walter S. Wilgus, Vice President t

Nuclear Operations l

P.O. Box 14042,.M.A.C. H-2 St. Petersburg, FL 33733

Gentlemen':

By application dated September 22, 1989, you requested a partial exemption from the FY 1989 annual fees of 10 CFR 171 for the Crystal River 3 reactor.- You-requested that a portion of fees already paid be refunded because you had been-charged for research which had not been performed.

As you are aware, Part 171 user fees are assessed on the basis of budgeted costs, not actual obligations. - Since it is expected that there will be some deviations between the funds budgeted for a specific activity and those actually obligated, exemptions will rarely be granted.

However, in. unusual situations where'there is a very. significant variation between the budgeted obligations and.

the actual obligations, an exemption may be considered.

-We have completed our review of the exemption request filed by your attorneys.

Based on the fact that very significant budgeted costs for two B&W research-related activities, namely, " Prevent Reactor Core Damage - Plant Performance -

B&W Testing" and " Reactor Accident Risk Analysis - Assessment of Plant Risks,"

were not totally obligated for these specific activities in FY 1989, but rather were expended for other activities relating to all power reactors, we have

, determined that a partial exemption is appropriate. Therefore, pursuant to the provisions of 10 CFR 171.11, a partial exemption is.hereby granted for the Crystal River 3 reactor. The annual fee is reduced from the FY 1989 rate of'

$1,592,000 to $1,320,000; accordingly, an-appropriate refund will be sent to you ' shortly. Enclosed is a document showing how the refund has been calcu--

' lated.

l If there are questions regarding this exemption, please contact Mr. Lee Hiller, Deputy Controller, on 301-492-7351.

r!gNabgnev By:

James M. Taylor James M. Taylor Acting Executive Director for Operations gpol

Enclosure:

is Refund Calculation See attached for distribution.

v ims okhk 0FC OC OGC '

OC DO


:------- ----:-- rfgL------:----

NAME
CJH(fl ay:js g f 4'.---- : -. -

k----- - : ------- l-- :: L '/ @f /89 er

RMS gins : JM

-:-----(-----:----j/89 10/Si89 DATE..10/h/89 10/ g

10/

/89 8910180f02' 891005 PDR ADOCK 05000302 0FFICIAL RECORD COPY PDC f

g. W ;;q '

-.! 65,

r...

, {., A i- '

f

u-J-

r DISTRIBUTION 1

h T

)JMTaylor,ActingEDO-

ED0 R/F License Fee Debt Co11ection'171 Fee File!

LA' s

F

- Docket) File,

OC Part 171EExemption File'

.CJHolloway,0C:(2)!

LHiller, 0C RMScroggins, 00-OCLR/F GDJohnson, OC/DAF EKBlack 0C/DAF

'DBDandois, OC/LFDCB

-JDWeiss,OC/LFDCB i

TRothschild, OGC:

i RSmith, 0GC 90A

\\

S r

(.

e

.=

G~,

, ;* j, _

l a

. COMPUTATION OF PROPOSED ADJUSTED ANNUAL-f, Ftt TO BE ASSESSED FOR EIGHT BABCOCK AND WILCOX (B&W) REACTORS

'FY 1989 BUDGET

{

Part 171 Work by-Research PTS FTE

' Original Budget Base NuclearSteamSupply'Sy(B&Wonly) stem -

Large Dry Containment _

1.

Prevent Reactor Core Damage -

$3,500,000 1.8'

[

Plant-PerformanceL-B&W Testing 2.

Reactor Accident Risk Analysis -

475,000

.7 Assessment of Plant Risk Subtotal

$3,975,000 2.5 2.5 FTE x $150,900/FTE =

377,000 Total Costs

$4.352,000 = $544,000 per reactor-.

[

Total B&W Reactors 8-RevisedBudgetBase(SumsObligated) 1.

Prevent Reactor Core Damage.-

$1,309,000 1.6 L

Plant' Performance - B&W Testing

.2._

Reactor Accident Risk Analysis -,

Assessment of Plant Risks L

.1.6 FTE x $150,900/FTE =

241,000 L

Subtotal

$1,309,000 1.6-Subtotal Revised Costs

$1,550,000

. Recap-L L

$4,352,000 Original' Costs y

1 550,000_ Revised Costs

$2,802,000 Costs Applicable to All Plants 106 Reactors L

$26,400 x 8 B&W Reactors

211,000 l

Total B&W Revised Costs i

$1,761,000 = $220,000 per reactor Total B&W Reactors 8

$5'44,000-$220,000=$324,000x.84(MFactor)=$272,000 Amount of Each Refund l

ENCLOSURE 1 4

- ---