05000334/LER-1980-046-03, /03L-0:on 800701,during IE Bulletin 79-14 as-built Walkdown,Embedment Plate for Component Cooling Water to RHR Heat Exchangers Found Slightly Bowed W/Spalled Concrete. Caused by Failure to Throttle Flow After Svc Isolation

From kanterella
(Redirected from ML19327A457)
Jump to navigation Jump to search
/03L-0:on 800701,during IE Bulletin 79-14 as-built Walkdown,Embedment Plate for Component Cooling Water to RHR Heat Exchangers Found Slightly Bowed W/Spalled Concrete. Caused by Failure to Throttle Flow After Svc Isolation
ML19327A457
Person / Time
Site: Beaver Valley
Issue date: 07/30/1980
From: Lacey W
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19327A454 List:
References
IEB-79-14, LER-80-046-03L, LER-80-46-3L, NUDOCS 8008060216
Download: ML19327A457 (1)


LER-1980-046, /03L-0:on 800701,during IE Bulletin 79-14 as-built Walkdown,Embedment Plate for Component Cooling Water to RHR Heat Exchangers Found Slightly Bowed W/Spalled Concrete. Caused by Failure to Throttle Flow After Svc Isolation
Event date:
Report date:
3341980046R03 - NRC Website

text

'martsstrxxturuxxrrm romrr--

NRC 1508464 364 (1711 LICENSEE EVENT REFORT CONT.%L SLCCK: l l

l l

l l

l (PLEASE PRINT oR TYPE ALL REQUIRE 3 INF3RMATl!N) l'P l A l B l V l S l 1 l@l 0 l 0 l-l 0 l 0 l 0 l 0 l 0 l-l0 l 0 l@l 4 l1 l1 11 l 1 l@l l

l@

7 8 9 L3CENSEE CODE le 15 68CEN5EN6MeER 25 26 LsCEN&E TYPE JJ SF GA T 64 CON'T 101il

$1u'RC [L @l 0 l 5 l010 l0 l 31314 @l 0 l 710 li j 8 l 0 @l 017 l 3l 0181 Ol@

i 8

60 61 OOCK ET Nu. veer 64 69 EVENT OATE 74 73 REPGRT DATE 80 EVENT DESCRIPTION AND PROBA8LE CONSEQUENCES O'o f57T1 l While performing an "as built" walkdown in accordance with IE Bulletin 79-14, the

[

ro7T1 l embedment plate for Component Cooling Water (CCR) to the Residual Heat Removal (RHR)l RT71 I heat exchangers was found to be slightly bowed and the concrete around the place was l Io#sl l spalled in a few locations. An engineering review found the embedment place to be

[

f5Ts"1 I structurally sound. Therefore, the health and safety of the public was not

[

I Io I 7 I I ieooardized.

I I o l !' ] l 40 SYSTEM

CAUSE

CAUSE COMP.

VALVE CODE COQE SueCCOE CCVPCNENT CODE SLSCCDE SUSCODE Q

lZ lZ l@ y@ l zi@ lS lU lP l0 lR lT l@ ]@ l Zi@

7 8

9 to it

  1. 2 3J to is 20 secutNTI AL OCCURRENCE REPORT REvisiCN LER EVENYvEAR REPORT No.

CCCE TYPE No,

@ yyg.'Ro 18l0l l-l l 0l 4l 61 l -l 10 l3 l l Ll

[-j l0l RE f

25 22 23 24 16 27 28 29 30 31 32 K N AC C C L NT MET MOURS see PC 8.

5 P Li MAN FAC RER I z l@l cl@

l zl@

l zl@

10 10 l o 10 l IN l@

{,N,j@

lZl@

lZi9l9l9l@

33 34 S

o 37 40 41 42 42 A4 47 CAUSE DESCRIPTION AND CCRRECTIVE ACTIONS 27 li t o l l The probable cause of the bowing was a failure to throttle the CCR flow to the RHR g l heat exchangers after intermittent isolation of service, causing water ha=mer and a g g l resultant stress on the embedment plate. The operating procedure has been changed I

gl to require throttling of the CCR flow to the heat exchangers.

l l

ITTTII so 7

s9

$A

%70wER OTHER STATu$

Di$ C RV Ol3COVERY CE$CRIPTICN y W @ l0l0l0l@l Design l

lCl@l Inspector observation l

CC' TENT AMOUNT oAeC m,TV @ l LoCAT,oN o, RELEA E @

A T1VITY ITTTl l,z.] @o e,REuAstl zi@l N/A RELEAst l

N/A l

,ERso~~EL E,, esses oE,CR,7,C~ @

Nu.E R TV,E ITT71 10 l 010 l@Lz_J@l N/A I

2

,ERseNNE L.,uu'R Es otsCR..Tio~@

~uv.im ITTil0lalo!@l N/A l

30 7

8 9 11 12 L0sS'of CR CAVAGE To FACILITY Q TvrE DE ICRt* TION

%,,r

[ Z_j@l N/A l

I O 30 7

8 9 10 e

IS$utI@ description IN l

N/A l

llllllll ll lll}

2 o 64 69 80 3 7

8 9 to t

Y NAME OF PREPARER PHONE:

8008060