ML19327A410

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-333/80-02 on 800303-14 & Notice of Violation.Details Withheld (Ref 10CFR2.790)
ML19327A410
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/23/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Leonard J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML19327A407 List:
References
NUDOCS 8008060164
Download: ML19327A410 (2)


See also: IR 05000333/1980002

Text

-

=

f

--

g,f

t)NITED STATES

,

'

NUCLEAR REGULATORY COMMISslON

o

2

o

REGION I

3.e

$

431 PARK AVENUE

g$

r

xma oer PRuss:A. PENNSYLVANIA 19408

%,'..../

APR 2 31980

+

Docket No. 50-333

Power Authority of the State of New York

James A. FitzPatrick Nuclear Power Plant

ATTN: Mr. J. D. Leonard, Jr.

Resident Manager

P. O. Box 41

Lycoming, New York 13093

Gentlemen:

Subject:

Inspection No. 50-333/80-02

This refers to the inspection conducted by Mr. T. Stetka of this office on

March 3-14,1980 of activities authorized by NRC License No. DPR-59 and to the

discussions of our findings held by Mr. Stetka with yourself and other members

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

'

inspector.

i

Our inspector also verified the steps you have taken to correct the items of

noncompliance brought to your attention in letters dated December 28, 1977,

March 14,1978, and August 24, 1979.

We have no further questions regarding

,

your action at this time.

'

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

'

Notice of Violation, enclosed herewith as Appendix A.

This item of noncompliance

has been categorized into the levels as described in our correspondence to you

dated December 31, 1974.

This notice is sent to you pursuant to the provisions

of Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of

Federal Regulations.

Section 2.201 requires you to submit to this office,

within twenty (20) days of your receipt of this notice, a written statement or

explanation in reply including:

(1) corrective steps which have been taken by

'

you and the results achieved; (2) corrective steps which will be taken to avoid

l

further items of noncompliance; and (3) the date when full compliance will be

achieved.

'

I

!

S QQ8060 /(si

-.

--

.

.

'

.

,

_

APR 2 31980

'

Power Authority of the State

of New York

2

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Titl'e

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

t

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the information, which

.

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

,

considered by the Comission as listed in subparagraph (b)(4) of Section 2.790.

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

Additionally, and in accordance with Section 2.790(d.) of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, documentation of

findings of your control and accounting procedures for. safeguarding special

nuclear materials and your facility security procedures are exempt from disclosure;

therefore, the pertinent section of the inspection report and Appendix A, will

not be placed in the Public Document Room and will receive limited distribution.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

f,0. b N N [m.

Eldon.J. Brunner, Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation (Contains 2.790 Information)

2.

Office of Inspection and Enforcement Inspection

Report Number 50-333/80-02 (Contains 2.790 Information)

cc w/encis:

George T. Berry, Executive Director

P. W. Lyon, Manager - Nuclear Operations

A. Klausmann, Director, Quality Assurance

M. C. Cosgrove, Quality Assurance Supervisor

J. F. Davis, Chairman, Safety Review Comittee

V. J. Pratt, Assistant General Counsel

G. M. Wilverding, Licensing Supervisor

1

4

-

.

.

_ _ . . _ _ _

_

,,... __

_

_ - _ . . _ . _ _ . . , . . . . - _ . . , _