ML19326E261
| ML19326E261 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 06/30/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19326E259 | List: |
| References | |
| NUDOCS 8008010016 | |
| Download: ML19326E261 (2) | |
See also: IR 05000413/1980008
Text
-
.
,yn ato
oq'o
UNITED STATES
8
g
NUCLEAR REGULATORY COMMISSION
-,
o
,[ )
{
E
FIEGION 11
r
o
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
JUN 3 01980
In Reply Refer To:
RII:CRM
50-413/80-8
50-414/80-8
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by C. R. McFarland of this office on
May 12 through 16, 1980 of activities authorized by NRC Construction, Permit Nos.
CPPR-116 and CPPR-117 for the Catawba facility, and to the discussion of our
findings held with D. G. Beam at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items.
The status of these items is dis-
cussed in the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
1
80080100 %
..
..
,
.
'
.
s
Duke Power Company
-2-
,
- Should you have any questions concerning this letter, we will be glad to discuss
them with you.
i
Sincerely,
.
C. E. M6rphy, C ief
Reactor Construction and Engineering
Support Branch
Enclosures:
Inspection Report Nos. 50-413/80-8
and 50-414/80-8
cc w/ encl:
J. W. Hampton, Station Manager
P. O. Box 392.
Clover, SC 29710
D. G. Beam, Project Manager
P. O. Box 223
Clover, SC 29710
.
-
i
I
4
e
w
= - - - - - .
,
-
- - , , . ,
-.w-
- - - - - - , w
+- ,