Text
-
r
. s * **4: q g+
a UNITED STATES 8'
k NUCLEAR REGULATORY COMMISSION e
WASHINGTON, D. C. 20555 g
jp
%QCt9. E Jt1L 7 1980 Docket Nos. 50-546 50-547 Public Service Company of Indiana ATTN:
Mr. S. W. Shields Vice President - Electric System 1000 East Main Street Plainfield, Indiana 46168 Gentlemen:
My letter to you dated May 15, 1980 enclosed the " Graduated Rescission of Order Dated August 15, 1979" and the guidelines (in the Appendix to the Graduated Rescission) for a controlled, stepwise resumption of activities at the Marble Hill site when certain prerequisites have been met.
Your letter dated June 27, 1980 requesting authority to resume the first activity, receipt inspection, has been received.
Specifically, your letter stated that those Public Service Company of Indiana (PSI) activities necessary for authorization of receipt inspection have been completed and requested permission to begin receipt inspection of PSI procured items for the Marble Hill project.
The NRC inspectors have been monitoring the progress made as your organization has worked toward the completion of various tasks associated with the hold points.
NRC inspectors completed their efforts associated with receipt inspec-tion this past week and the NRC conclusion is that such activities may begin.
The restart program (the Appendix to the Graduated Rescission which is enclosed) has been completed for Item A, Revised QA Program, and for Item B, Receipt Inspection, through Item B.2.
Based upon the i.aspection findings, which confirm the information reported in your June 27, 1980 letter, I have concluded under Items A.2. and B.3. of the restart program that a satisfactory revised QA program has been developed by the licensee and that the prerequisites necessary for receipt inspection have been satisfactorily completed. Accordingly, Public Service of Indiana is authorized to commence receipt inspections consistent with Item B.4. of the restart program.
s Victor Stello, Jr.
s Director Office of Inspection and Enforcement
Enclosure:
Restart Program (Appendix to the Graduated Rescission) 80072800
w m
e RESTART PROGRAM FOR MARBLE HILL UNITS 1&2 WITH FRC HOLD POINTS At each point in this schedule identified as an NRC hold point, NRC will conduct a specia1' inspection or series of inspections to review the ap-propriate procadures and practices for the particular operation.
If the NRC determines that the licensee has met satisfactorily all the necessary requirements, a letter of approval will be written by the Director of the Office of Inspection and Enforcement (IE) to the licensee to state that the matter has been resolved satisfactorily and to confirm the types of activities which may be restarted.
A.
Revised QA Program l
1.
Public Service of Indiana (PSI) will accomplish the following actions before any new' safety related construction can occur:
(a). Respond to the specific concerns expressed in the Office of Nuclear Reactor Regulation's April 1,1980 and April 28, 1980 questions relative to the upgrading of the quality assurance program and provide a Consolidated Quality J
'-- Assurance Program description that includes the licensee's 1
_. _ _ responses.
_J,
,. g% a (b) 'D'evel'op a Project Quality Assurance Manual (PQAM).
' (c) Dev'elop an ASME Quality Ass.urance Manual (AQAM).
(d) Incr--ca nroject staff experience levels in accordance wi'
.censee s su m ttal dated February 28, 1980.
bi 2.
NRC HOLD POINT:
NRC will review the adequacy of items b, e and d '-
above, and if the adequacy is confirmed, the Director of IE will issue a written statement to that effect to PSI.
B.
Receipt Inspection 1.
PSI will develop project management and other related procedures.
and vill qualify its staff for receipt inspection.
2.
NRC HOLD POINT:
NRC will review PSI's program, procedures, and staffing for receipt inspection.
3.
If the results of the NRC's review are satisfactory, PSI may resume receipt inspection upon writtaa notification from the Director of IE.
e l
4.
PSI will start receipE ins;iectfon aiid retain administrative custody of the equipment and materials.
5.
' Each contractor will make adjustments as necessary to its QA program, procedures, and staffing for receipt inspection activities.
. - -. 6.
PSI management will review aihd approve the above adjustments for
,. receipt. inspection for each. contractor as required by planned
. activities and irrforn.the Director of NRC Region III in writing of the adjustments.
7.
NRC HOLD POINT:
HRC will review the adequacy of the adjustments' noted in ites.B.5 and B.6.
8.
If the r' esult.s of the NRC's' review are satisfactory, contractors within the subject-discipline:may. start receipt inspection, and storage and maintenance of. PSI equipment and materials upon written notification from the Director of IE.
The four main disciplines arc : Civil / Structural; Mechanical; Electrical; and Piping...p d =
- .-- - i I r-
- -- - -
- riI m-
~-
. -. _.. yaw C.
Material Verification Program - Currently in progress and may be accomp3ish'ed irtparallel.with. Receipt Inspection. -
1.
PSI will complete appropriate project management and special process procedures and conduct a Material Verificat%n Program for,all disciplines..
2.
PSI management will review and approve the Mate ~fal Verifica-tion Progran results and inform the Director of NRC Region III in writing of the results.
3.
NRC HOLD POINT:
NRC will review the material verification efforts of PSI and confirm adequacy of the prosram in each discipline.
l D.
Construction Verification Program - Currently in progress and may be accomplished in parallel with Receipt Inspection.
1.
PSI wil'1 complete appropriate project manageme1t procedures, special process procedures and conduct a Const>.uction Verifica-tion Program.
~
2.
PSI management wi11 review and approve the Cor struction Verifi-cation'?rogram,results and inform the Director of NRC Region l
III in t.-iting of the results.
l
..-7
,_,f
..e
e of a
3 3.
NRC HOLD POINT:
The NRC will review the construction verification efforts of PSI and confirm the adequacy of the program in each discipline.
E.
Resumpi. ion of Constrtid. ion.
1.
NRC HOLD POIhT:
NRC will review PSI's program and its implementation as. discussed in B, C, and D above for all disciplines.
If the. -
adequacy is confirmed, the. Director.of IE will issue written notifica-tion to. proceed as described in. Item 2 below.
.v..:
2.
Contractors'. Program Adjustments
~
- a. - Each contractor-will adjust its QA program, procedures, and staffing to be can'sistent with PQAM, AQAM, and other PSI pro-
. gram requirements for.' ach discipline.
e 3....
- .5 b.-
PSI management will review and approve the above adjustments for each discipline and inform. the Director of NRC Region III
- ::in writing-of the adjustments.
- ._.,3 3.'
NRC HOLD POINT: The NRC will review the program adjustments for a _...
- : particular tiiscipline and the Director of IE will provide writteri""~
- notificatierr that construction activities in a particular discipline say proceed in whole or in part if the adjustments ar.e acceptable.
W F
e i
g
.