Immediate Action Ltr 80-18 Referring to 800625 Telcon Re Review & Evaluation of Const Deficiencies in Refueling Water Storage Tank & Demineralized Water Storage Tank.Corrective Actions Should Be Taken to Assure Adequacy of Const
ML19326E066
Person / Time
Site: Beaver Valley
Issue date: 06/26/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Dunn C
DUQUESNE LIGHT CO.
References
IAL-80-18, NUDOCS 8007250543
Download: ML19326E066 (2)


Text

Sent Facsimile to Duquesne Light Company 6/26/80

'T h pM E!

%'o UNITED STATES g

g 8

NUCLEAR REGULATORY COMMISSION g

r, 3

.j REGION 1 0

4 631 PARK AVENUE

,o#

KING OF PRUSSIA, PENNSYLVANIA 19406 aw 2 613%

Docket No. 50-334 IAL No. 80-18 Duquesne Light Company ATTN:

Mr. C. N. Dunn Vice President 01erations Division 435 Sixt1 Avenue Pittsburgh, Pennsylvania 15219 Gentlemen:

This refers to a telephone conversation between you and Mr. E. Brui..ier of this office on June 25, 1980, regarding your review and evaluation of construction deficiencies in the Refueling Water Storage Tank and Demineralized Water Storage Tank which may be implicative of similar deficiencies in other structures and components constructed by the same contractor.

We understand that the contractor responsible for the construction of those tanks also constructed the containment liner and six tanks which normally contain radioactive water.

Based on the results of these discussions it is our understanding that you will take the following actions to assure the adequacy of construction of the con-tainment liner and additional tanks:

1.

Conf.cm the construction of the containment liner to be acceptable and in conformance with the requirements of the Final Safety Analysis Report and the applicable construction specifications by conducting a review of construction records and comprehensive sample reinterpretation of original radiography.

Submit the results of this review, including the identifica-tion and disposition of any construction deficiencies or record irregulari-ties, to this office by July 14, 1980 via written report.

Should this review identify deficiencies in the quality of containment liner construc-tion or unacceptable record irregularities, submit to this office, within seven working days of such identification, either,1) a plan and schedule for additional, confirmatory nondestructive examination, or, 2) the basis on which such additional examinations are not necessary.

2.

Submit to this office, by July 14, 1950, a plan and schedule for verifica-tion of the adequacy of Boron Recovery System tanks which were constructed by the same contractor.

In addition to the written reports required by Technical Specification 6.9.1.9.d, report any deficiencies which degrade the tanks' capabilities to contain radioactive materials to this office by telephone and in writing within three working days of their identification.

1 80 07250543

Sent Facsimile to Duquesne Light Company 6/26/80 JUNI5i9s Duquesne Light Company 2

If our understanding of your planned actions, described above, is not in accord-ance with the actual plans and actions being implemented, please contact this office by telephone and in writing within twenty-four hours.

Sincerely,

/

d f

n,'

Boyce H. Grier Director cc:

F. Bissert, Technical Assistant Nuclear R. Washabau J. Werling,gh, QA ManagerStation Superintendent G. Moore, General Superintendent, Power Stations Department J. J. Carey, Director of Nuclear Operations R. Martin, Nuclear Engineer J. Sieber, Superintendent of Licensing and Compliance, BVPS

.