ML19326E005

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 80-28, Prompt Reporting of Info in Accordance W/10CFR50.55(e). No Written Response Required
ML19326E005
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/13/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
References
NUDOCS 8007250380
Download: ML19326E005 (2)


Text

r UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

g

,a REGION il

?,

[

101 MARIETTA ST., N.W., SulTE 3100

/

ATLANTA, GEORGIA 30303 JUN 131980 In Reply Refer To:

RII:JPO g95 ;

South Carolina Electric and Gas Company Attn:

T. C. Nichols, Jr., Vice President Power Production and System Operations Post Office Box 764 Columbia, South Carolina 29218 Gentlemen:

This Information Notice is being forwardet* to you for information.

No written response to this Information Notice is required.

If you have any questions related to the subject, please contact this office.

Sincerely, k~

James P. O'Reilly Director

Enclosures:

1.

IE Information Notice No. 80-28 2.

List of Recently Issued Information Notices 8 00 Y25 0 3FO

-. Q.

e-a e

s SSINS No.: 6835 UNITED STATES Accession No.:

NUCLEAR REGULATORY COMMISSICN 8005050063 0FFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 June 13, 1980 IE Information Notice No. 80-28 PROMPT REPORTING OF INFORMATION IN ACCORDANCE WITH 10 CFR 50.55(e)

The recently implemented expansion of the NRC Resident Inspection Program at nuclear power plants and fuel facilities, has led to some misunderstandings regarding the required reporting of information to the NRC.

In order to clarify this matter, the following is provided for your information.

Some licensees have been making the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> reports required by 10 CFR 50.55(e)(2) orally to NRC resident inspectors. This does no'. satisfy the intent of the regulation. Adherence by all licensees to the explicit requirements of the regulation provides for each Regional Office to be a single focal point for reporting, and minimizes the possibility of inadvertent oversight. While we continue to enlist your cooperation in fully informing our resident inspectors, where appropriate, or any other NRC inspector who may be at your facility at such a time, such informational exchanges do not satisfy the reporting requirements of 10 CFR 50.55(e)(2).

Your cooperation in assuring that the appropriate members of your staff are fully aware of this information will be appreciated.

j No written response to this information notice is required.

If you require additional information regarding this matter contact the Director of the appropriate FRC Regional Office.

l b.h.emnN w gw Ellqe ha6

-w e

w -

r iv 1

h 0

i IE Information Notice No. 80-28 Enclosure June 13, 1980 RECENTLY ISSUED IE INFORMATION NOTICES Information Subject Date Issued To Notice No.

Issued 80-28 Prompt Reporting of Infor-6/13/80 All holders of nuclear mation in Accordance with power reactor construction 10 CFR 55.55(e) permits 80-27 Degradation of Reactor 6/11/80 All Pressurized Water Coolant Pump Studs Reactor Facilities holding power reactor OLs or cps 80-26 Evaluation of Contractor 6/10/80 All Part 50 Licensees QA Programs 80-25 Transportation of 5/30/80 Material Licensee in Pyrophoric Uranium Priority / Categories II-A, II-D, III-I and IV-DI; Agreement State Licensees in equivalent categories 80-24 Low Level Radioactive 5/30/80 All NRC and Agreement Waste Burial Criteria State Licensees 80-23 Loss of Suction to 5/29/80 All power reactor to Emergency Feedwater facilities with an Pumps OL or CP 80-22 Breakdown In Contamination 5/28/80 All power reactor Control Programs OLs and near term cps 80-21 Anchorage and Support of 5/16/80 All power reactor Safety-Related Electrical facilities with an Equipment OL or CP 1

80-20 Loss of Decay Heat Removal 5/8/80 All light water reactor Capability at Davis-Besse facilities holding Unit 1 While in a Refueling power reactor OLs or cps Mode 80-19 NIOSH Recall of Recircu-5/6/80 All holders of a power lating-Mode (Closed-Circuit) reactor OL, Research Self-Contained Breathing Reactor License, Fuel Apparatus (Rebreathers)

Cycle Facility License and Priority I Material License

- - - -.