ML19326E002

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 80-28, Prompt Reporting of Info in Accordance W/10CFR50.55(e). No Written Response Required
ML19326E002
Person / Time
Site: Grand Gulf  
Issue date: 06/13/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
References
NUDOCS 8007250377
Download: ML19326E002 (2)


Text

r.

'/

7
.= = =..

=...

_--.: = ~~~= = =

o e,

'o, UNITED STATES NUCLEAR REGULATORY COMMISSION g

a REGION il t

\\..... o 101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 In Reply Refer To:

RU:JP O. -

fiQ, 5_0-417 j Mississippi Power and Light Company Attn:

N. L. Stampley Vice President of Production P. O. Box 1640 Jackson, Mississippi 39205 Gentlemen:

This Information Notice is being forwarded to you for information.

No written response to this Information Notice is required.

If you have any questions related to the subject, please contact this office.

Sincerely,

(

C_M James P. O'Reill Director 5

Enclosures:

1.

IE Information Notice No. 80-28 2.

List of Recently Issued Information Notices I

l i

ON@

80072 Q

r JUN 131980 i

Mississippi P;w;r cnd Light Company *,

cc w/ encl:

C. K. McCoy Plant Manager Post Office Box 756 Port Gibson, Mississippi 39150 l

.i i

b i,

.I

?

k I

i

.4

.t J

I 1

r 9

SSINS No.: 6835 UNITED STATES Accession No.:

d~

NUCLEAR REGULATORY COMMISSION 8005050063 0FFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 June 13, 1980 IE Information Notice No. 80-28 PROMPT REPORTING OF INFORMATION IN ACCORDANCE WITH 10 CFR 50.55(e)

The recently implemented expansion of the NRC Resident Inspection Program at nuclear power plants and fuel facilities, has led to some misunderstandings regarding the required reporting of information to the NRC.

In order to clarify this matter, the following is provided for your information.

Some licensees have been making the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> reports required by 10 CFR 50.55(e)(2) orally to NRC resident inspectors.

This does not satisfy the intent of the regulation. Adherence by all licensees to the explicit requirements of the regulation provides for each Regional Office to be a single focal point for reporting, and minimizes the possibility of inadvertent oversight. While we continue to enlist your cooperation in fully informing our resident inspectors, where appropriate, or any other NRC inspector who may be at your facility at such a time, such informational exchanges do not satisfy the reporting requirements of 10 CFR 50.55(e)(2).

Your cooperation in assuring that the appropriate members of your staff are

[

fully aware of this information will be appreciated.

J No written response to this information notice is required.

If you require i

additional information regarding this matter contact the Director of the appropriate NRC Regional Office.

N l

f

-~-*-ww e - smess e,.w em m m e.-, -

s-

-e-.

L--

~

/

IE Information Notice No. 80-28 Enclosure June 13, 1980 RECENTLY ISSUED IE INFORMATION NOTICES Information Subject Date Issued To Notice No.

Issued 80-28 Prompt Reporting of Infor-6/13/80 All holders of nuclear mation in Accordance with power reactor construction 10 CFR 55.55(e) permits 80-27 Degradation of Reactor 6/11/80 All Pressurized Water Coolant Pump Studs Reactor Facilities holding power reactor OLs or cps 80-26 Evaluation of Contract,*

6/10/80 All Part 50 Licensees QA Programs 80-25 Transportation of 5/30/80 Material Licensee in Pyrophoric Uranium Priority / Categories II-A, II-D, III-I and IV-DI; Agreement State Licensees in equivalent categories 80-24 Low Level Radioactive 5/30/80 All NRC r-3 Agreement Waste Burial Criteria State Licensees 80-23 Loss of Suction to 5/29/80 All power reactor to Emergency Feedwater facilities with an Pumps OL or CP 80-22 Breakdawe In Contamination 5/28/80 All power reactor Control Programs OLs and near term cps 80-21 Anchorage and Support of 5/16/80 All power reactor Safety-Related Electrical facilities with an Equipment OL or CP 80-20 Loss of Decay Heat Removal 5/8/80 All light water reactor Capability at Davis-Besse facilities holding Unit I While in a Refueling power reactor OLs or cps Mode 80-19 NIOSH Recall of Recircu-5/6/80 All holders of a power lating-Mode (Closed-Circuit) reactor OL, Research Self-Contained Breathing Reactor License, Fuel Apparatus (Rebreathers)

Cycle Facility License and Priority I Material License

.