Forwards Response to IE Bulletin 79-27, Loss of Non-Class IE Instrumentation & Control Power Sys Bus During Operation. Describes Power Upset Events on Nni/Ics.Buffer Cord Installations Will Be Checked
ML19326D998
Person / Time
Site: Rancho Seco
Issue date: 03/12/1980
From: Walbridge W
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
IEB-79-27, NUDOCS 8007250370
Download: ML19326D998 (18)


Text

r I,,Q O

gSMUD SACRAMENTO MUNICirAL UTILITY DISTRICT O 6201 S Street, R0x 15830, Sacramento, California 95813; (916) 452-3211 March 12, 1980 s

/\\

m Nuclear Regulatory Cornission

'e.,

7~

U Attention:

!!r. R. H. Engelken, Director

/

Region V Office of Inspection & Enforcement Ei

',j 1990 North California Boulevard I

,4 Walnut Creek Plaza, Suite 202 iA

,.. y Walnut Creek, California 94596

\\.x s

gs Re: Docket No. 50-312 Rancho Seco Nuclear Generating Station, Unit No. 1 IE Bulletin 79-27

Dear Mr. Engelken:

The Sacramento !!unicipal Utility District reviewed IE Bulletin 79-27 and responded by letter iddressed to you dated February 22, 1980. As a result of the Crystal River Unit No. 3 Nuclear Station reactor trip on February 26, 1980, the Director, Office of Nuclear Reactor Regulation, issued a request for information dated March 6, 1980.

Within that request, all B&W licensees were directed to expand their review under IE Bulletin 79-27 to include the impli-cations of the Crystal River Unit No. 3 event.

Attached is the response to the request for information from the Office of Nuclear Reactor Regulation.

Please consider this as a supplement to SMUD's response of February 22, 1980, to IE Bulletin 79-27.

Please advise if we can provide any additional information; however, we consider this response to complete the requirements of the subject bulletin and the NRR request for information letter of March 6, 1980. We will take no further action unless so advised.

Sincer>ly yours,

/

f/

/

/)

-L m,

. s b

h'n. C. Ualbridge General Manager WCW:RPO: Jim Attachment cs:

Nuclear Regulatory Connission Office of Inspection and Enforcement Division of Reactor Operations Inspection

'Jashington, D. C.

20555 80072503b g AN ELECTRIC SYSTEV S E RVIN G MORE THAN 600,000 IN THE HEAR 1 0F C A l l f *,' N t

.b"

SACRAMENTO MUNICIPAL UTILITY DISTRICT RESPO?,*SE TO NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR INFORMATION DATED MARCH 6, 1980 O

r l.

REQUEST:

Summarize power upset events on NNI/ICS that have previously occurred at your plant.

RESPONSE

EVEhT #1,11-2-74, Rx 0 32% FP:

Momentary loss of NNI "Y" and "Z" DC power supplies due to tripping of "J" inverter during manual switching.

Some control room instru-centation was lost (%12 seconds).

EVENT #2,12-26-74, Rx 0 40% FP:

Loss of ICS X power due to a component failure (SCR) in the "C" inverter. Manual control of steam and feedwater was required.

EVENT #3 12-28-74, Rx 0 40% FP:

n Loss of ICS X power due to a component failure (30 Bridge) in the "C"

inverter. Manual control of steam and feedwater was required.

EVENT #4, 12-31-74, Rx 0 40% FP:

Momentary loss of NNI Y and Z and ICS Y power supplies due to tripping "J". inverter during manual switching.

Some control room instrumentation was lost (%45 seconds).

Following these events above, parallel inverter supply was added to the ICS and NNI DC supplies.

In addition, an automatic bus transfer was added to the 118 VAC instrumentation supply.

See Figure 1 for initial power supply configura-tion and Figure 2 for modification performed.

EVENT #5, 4-16-75, Rx 0 35% FP:

Reactor tripped due to loss of "B" inverter which resulted in a loss of neutron power signal to the ICS.

A two-input Auctioneer was added to select the highest of the average of two nehtron signals to prevent a recurrence.

The two inputs are powered by different inverters.

EVENT #6, 3-20-78:

See response to Item 3.

EVENT #7, 1-2-79, Rx 0 100% FP:

A reactor trip resulted from the loss of reacter oolant flow indication to the ICS.

The flow signal originates in the "A" Reactor Protection Channel which was depowered by a trip of the "A" inverter.

ICS responded correctly during post trip control..

r EVENT #8,1-5-79, Rx 0 1007. FP:

. During maintenance, a short'to ground caused ICS power supplies to trip. Automatic control was lost.

Excessive cooldown resulted from subsequent SFAS initiation of auxiliary feedwater.

s A Safety Grade Auxiliary Feedwater Control, independent of SFAS or ICS, is being designed.

EVENT #9, 4-22-79, Rx @ 100% FP:

A reactor trip resulted fron'the loss of reactor coolant flow indication j

to the ICS. The flow signal originates in the "A" Reactor Protection Channel which was depowered by a trip of the "A" inverter.

ICS responded correctly during post trip control.

2.

REQUEST:

Specifically review the Crystal River event, and address your susceptibility to it in general.

RESPONSE: SMUD has reviewed the Crystal River event, both the caus'c and sequence of events.

Bailey Meter Company has informed the Sacramento Municipal Utility District that the cause of the Crystal River event was the improper insertion of a buffer card (Part No. 6624609L1) into a buffer module (Part No. 6624610).

This improper insertion resulted in a short of 24 volts to common with a total loss of non-nuclear instrument X power supply.

Bailey also supplied installation instructions on the proper method of buffer card replacement. These instructions will be covered within a*t' raining program with all Instrument and Control Technicians during the present refueling outage.

In addition, these instructions will be added to applicable procedures.

To ensure that all buffer cards presently installed have been installed properly, Rancho Seco will inspect all modules containing these buffer cards during the present refueling outage. The inspection will consist of ensuring proper alignment of.the bifurcated contacts, no bent contacts and the contacts are properly seated.

Concerning the sequence of events, SMUD contends that with the modifi-cations made to the Rancho Seco NNI systems and'the addition of selected instrumentation availabic to the operators which is not dependent on NNI power, the primary code safety valves would not have'been challenged.

Not challenging the code safety valves-would therefore prevent filling the pressurizer relief tank, rupturing the rupture disc and spilling reactor coolant into the reactor containment building.

The modifications made to the Rancho Seco NNI systems and the dedicated instruments independent of the NNI power is explained in response number 3.

4 e

y-c,

,w-,v.e,

  • .,*, w c-ma w

+-

r~e*+

e virv -- we==v--ve-----'+-w-

--+-***ge-"---'e*r re e+y w v

-esva+=g ry e w

f SMUD's contention that reactor coolant would not spill into the reactor containment building is based on the fact that the instrumentation which is independent of NNI would provide information to the operator, so the subcooling margin could be determined and high pressure injection reduced, preventing solid plant conditions. This instrumentation would also provide steam generhtor level information, allowing the operator to utilize the Class 1 auxiliary feed system to supply feedwater, if necessary.

EEQUEST: Set forth the information presented by each licensee in the meeting on March 4.

RESPONSE

The SMUD representative at the March 4 meeting described Rancho Seco's NNI transient of March 20, 1978, and corre crive action taken.

Approximately 0425 on March 20, 1978, the NNI-Y channel tripped.

This trip was caused by a control room operator who was replacing a burned-out light bulb in a back-lighted pushbutton swittS on one of the control consoles.

The DC power for this switch is provided f ron the "Y" portion of the Non-Nuclear Instrumentation. To change out the light bulb, the light assembly was pulled out from the panel and flipped down, exposing the bulbs.

During the change, a bulb was dropped into the open light assembly cavity, creating a short to ground. The current-limiting and undervoltage protection for the NNI-Y DC power supplies actuated during the current surge, cutting off AC power to all ITdI-Y DC power supplies.

This transient was reported to the NRC by Reportable Occurrence 78-1 dated March 3'1, 1978.

The SMUD Management Safety Review Committee (MSRC) held a meeting on March 22. 1978, at which time a three-member committee was established. This committee was directed to investigate the Rancho Seco. transient and recommend corrective action to prevent future recurrence of this or a similar problem. The committee members were:

a.

SMUD Supervising Electri.al Engineer b.

SMUD Supervising Mechanical Engineer c.

SMUD Nuclear Engineer who held an NRC Senior License This committee presented a report to the MSRC on June 19, 1978.

The recommenda-tions and corrective action taken were as follows:

a.

RECOMMENDATION:

Nuclear Operations should develop a nonconducting plastic cap or rectangular foam rubber plug to insert in or cover the open back-lighted pushbutton modules whenever the lamp bulb section of the module is lifted out.

ACTION TAKEN:

Nuclear Operations developed and instituted the use of a rectangular foam rubber plug.

. l i

b.

RECO:C:ENDATIO!!: Transport the upper bulb fixture portion of the module to a renote location for removal and replacement of bulbs.

ACTION T KE::: This practice has been instituted with all fixtures which are renovabic.

s c.

RECO::1ENDATIO:i: Perform tests on the existing NNI-Y power supply syste.m to determine the following conditions:

1) Trip point of the power supply monitors (22 V)
2) Time delay to trip circuit breakers S1 and S2 (0.5 sec.)
3) The ampere limiting point of the 24-volt DC NNI-Y power supplies (7.5)
4) Transfer voltage point of the AC automatic transfer switch, relay 83 (100 V)
5) Overcurrent test at least 3 of the SA fuses and compare test data with the manufacturer's curves.
6) Conduct an actual short circuit test similar to the accident case and verify protective device coordination using an oscillograph.

ACTION TANES: Testing was performed as recommended.

The figures in parentheses are the results of the tests.

In all cases,

' acceptance criteria were met.

~Iulate d.

RECO:CIENDATION:

For the ::NI-Y power circuit, measure or u the amperes in the backlighted pushbutton-auxiliary relay circuits, and determine the possibility of using lower-rated fuses.

Possibly lower-rated fuses would carry the load of the lamp bulbs and relay coils and would provide faster clearing of faults and prevent tripping at the 120 volt AC input circuit. breakers.

ACTION TAKEN:

As a result of the recommendation, all SA fuses are being replaced with 0.75A fuses. This will be completed during the present refueling outage.

c.

RECO:CAEN6ATION:

Provide a separate power supply module for the NNI lastruneet selector switches, associtted indicating lamps and auxiliary relays.

This circuit would be similar to that shown in Figura No. 3 attached. This change would not be likely to prevent a plant trip, but it would reduce the quantity of instru-mer.tation lost for r. short circuit condition identical to that of

'!a rch 20, 1973. '

I l

1 ACTION TANEN:

A design was produced as shown in Figure No. 4.

Equipment was ordered and the modifications are being made during the present refueling outage, fs RECOMIENDATION: Make a study of all circuits connected to the NNI-X and Y power supplies '.nat are not fused. Presently, there are several devices which are tied solid (no fuse) to the DC and AC s6urce supplies.

In crder to provide proper isolation for short circuits, the addition of fuses is recommended.

ACTION TAKEN: This reconnended study was performed. As a result, a design has been produced which will fuse all circuits leaving the NNI panels and all internal AC circuits.

This modification will be completed during the present refueling outage.

g.

RECOMMENDATION: Make a study on the possibility of using a lower-rated fuse rather than the universal 5A fuse now in use.

A preliminary check on some of the devices, now protected by SA fures, revealed that this fuse may be oversized.

Since the power supplies are automatic current limited to 7A, it is critical that the lowest possible fuse size be used.

Possibly a 1 or 2-amp fuse would provide the fast operation necessary to prevent tripping of the input breakers for faults that should be cleared by the fuses.

ACTION TAKEN: This recommended study was performed.

As a result, all SA' fuses are being replaced with fuses sized by an analysis of the load during the present refueling outage. The majority are 0.75A.

h.

RECOMMENDATION: Make a study to determine if it is reasonably possible to inprove the present NNI DC power supply configuration.

For the NNI-Y system, the existing scheme provides redundancy for a single power supply failure and/or opening of one of the two AC source input breakers.

However, because of design of the power supply monitor tripping scheme, the redundancy is negated for a low voltage condition on one bus because the monitor trips both AC input breakers at the same time.

ACTION TAKEN: A study was performed to determine if the power supt y monitor tripping scheme could be changed.

It was determined l

that the present scheme is the best.

The auctioneered concept is to pro'ide redundancy for the 1 ;s of either input voltage or the power supply itself.

The function of the power supply monitor trip is to prevent operation of instrumentation below 22 VCD or single phase.

Operation in this region would have unknown results on instrunent response.

It is therefore a better situation to trip the instrumen,ts rather thn-have the instruments display or control with false signals. As result, the power supply monitor tripping scheme will not be modified..

9

1.

REC 0"NENDATION:

Study the practicability of providing the following instrument indications for both RCS loops in the control rocm even though NNI-X or NNI-Y power supply is inoperative.

Computer readout of these indications is satisfactory.

2 - Uncompensated pressurizer levels s

1 - Wide range RCS pressure 1 - Wide range RCS Loop A Tc 1 - Ufde range RCS Loop B T c

1 - RCS Loop A Th 1 - RCS Loop B T h 1 - OTSC A Startup level 1 - OTSG B Start p level 1 - OTSG A pressure 1 - OTSG B. pressure 1 - Makeup tank level 1 - Source range nuclear instrument ACTION TAKEN:

In conjunction with the above recommendation and the Fire Hazards Analysis Report, new instrumentation has been installed with readout capability on the plant computer in the control room.

With the exception.of the uncompensated pressurizer levels, all the instrumentation listed above is independent of both NNI-X and Y.

The control room computer has four (4) uncompensated

' pressurizer level inputs. One input is totally independent of NNI-X or Y, two are supplied by NNI-X and one is supplied by NNI-Y.

This instrumentation meets the recommendation, that is, there will always be two uncompensated pressurir.er levels available for loss of NNI-X or NNI-Y.

Additional instrumentation beyond that listed.above also made available are:

2 - Incore thermocouples, range 0-2000*F 1 - Ulde range RCS pressure 1 - Source range nuclear instrument This, instrumentation is completely independent of both NNI-X and Y power. These indications are available to the operator on the computer.

Directions have been placed on the computer console, excerpts from procedures discussed in J. below, directing the operator to place the following points on the computer trend recorders:

1 - Uncompensated pressurizer level (independent af NNI-Y and N) 1 - Ulde range ECS pressure 1 - Wide range RCS Loop A T 1 - Wide range RCS ',oop B T 1 - OTSG A startup cVel 1 - OTSG B startup level.

y

All remaining points have been placed in an operator's group.

This group will be called up by procedure to print every minute.

The line printer used for this function is completely independent of the alarn line printer and cannot be overloaded due to alarms.

J.

RECO:0!rNDATION: Nuclear Operations should prepare a procedure for safety shutting down the plant upon total loss of both the 20;I-X and K::I-Y power supplies and associated instrumentation.

Because these systems are non-Class I and non-redundant, their continuous availability cannot be assured; consequently, the total loss of both systens should be expected to occur at some time during the life of the plant.

ACTION TAKEN:

Procedures have been written for loss of NNI-Y,

!O'I-X and both NNI-Y and X simultaneously.

The instrumentation discussed above is utilized within all procedures.

Licensed Operators have been trained in these procedures.

4.

REQUEST: Address information available to the operator following various NNI/ICS power upset events, including a discussion of:

- how the operator determines which information is reliabic;

- what information is needed to bring the plant to cold shutdown.

RESPONSE: Th.c information available to the operator independent of either NNI power supplies or the ICS power supply was discussed in 3.1. above.

This information was selected for presentation to the operator with the intent of bringing the plant to a cold shutdown condition. The design objective of this instrument selection was to remove any doubt from the operator, when experiencing a power upset on NNI/ICS power supply, that the information presented was anything but reliable.

By having a congletely independer* group of instruments; cumbersome procedures did not have to be written; any power upset in the NNI or ICS power supplies could be handled quickly; and the mistake of reading a bad instrument and controlling on that bad inst,rument could be eliminated.

It is SMUD's conL. ion that completely independent instrumentation is the preferred method of' responding to NNI or ICS power supply upset events.

5.

REQUEST: Address the feasibility of performing a test to verify reliable information that remains following various NNI/ICS power upsets.

RESPONSE

A test will be performed which will prove that the instrumentation listed in 3.1. above is in fact independent of NNI/ICS power upsets.

This test will show that the turning off of each of the NNI/ICS power supplies will not affect the information being used by the operator in the computer for such upsets. This test will be performed during the current refueling outage.

j.

6.

REQUEST: Address each CR-3 proposed corrective action in terms of applica-bility to your plant.

RESPONSE

CR-3 I!P!EDIATE PROPOSED CORRECTIVE ACTION s

a.

CR-3: Thorough testing of NNI system to determine cause of failure.

RS: 'See item 2 response concerning SMUD action taken as a result of the CR-3 cause of failure.

b.

CR-3: Modify PORV so that NNI failure closes valve.

RS:

SMUD is modifying the PORV circuitry so that failure of the NNI power supply will fail the PORV close.

This modification will be installed during the current refueling cutage. A test will be performed to verify that failure of the NNI power supply will fail the PORV close.

This test will duplicate the sequential loss of power as experienced at CR-3.

c.

CR-3: Modify the pressurizer cpray valve so that the valve doesn't open on NNI failure.

'RS:

SMUD is modifying both spray walves circuitry so that failure of the NNI power supply will not cause either of the two spray valves to open. This modification will be installed during

  • the current refueling outage. A test will be performed to verify that failure of the NNI power supply will not cause the spray valve to open.

d.

CR-3:

Provide positive indication of all three relief or safety valves.

RS:

NUREG-0578 item 2.1.3a required SMLD to install direct indication of power-operated relief valve '(PORV) and safety valve posillon.

In SMUD letter, J. J. Mattimoe to Harold R. Denton, dated January 16, 1980, it was explained r. hat equipment located within the reactor buildf,; to perform the positive indication function should be installed during the present refueling outage.

It was also explained that delivery of equipment to be located outside the reactor building (signal processing equipment) has a reasonabic delivery date of May 1, 1980.

In response to SMUD letter of January 16, 1980, NRC letter of February 1, 1980, liarold R. Denton to J. J. Mattimoe, recognizes that late delivery of the signal processing equipment. This letter requires implenentation of positive indication of the PORV and safety valves within 30 days of receipt of the equipment but no later than June 1, 1980.

-g-

~ _.. _ _

t c.

CR-3:

Establish procedural control of NNI selector switches.

RS: The fntent of the procedural controls planned by CR-3 is to have all indications displayed from one NNI pcuer supply. This will allow the operator to shift Indication if that power supply should fail. As an example, if all of the instrumentation displayed was from the NNI-X power uupply, and the NNI-Y power supply failed..the operator would know that the displayed indica-l tion cas accurate. Then again, if the NNI-X power supply failed.

the operator could shift to other inputs, which would be NNI-Y supplied, thereby presenting accurate indication.

At SMUD, as a result of the study explained in item 3, procedural control of NNI selector switches was not practical. This was due to the cross pollination of NNI-X and Y power to various instru-cents, switches and buffers within instrument strings. This was one of the reasons SMUD decided to install instrumentation completely independent of either NNI-X or Y.

The instruments supplied to the control room are explained in item 3.1.

f.

CR-3: Train all operators in response to NNI failures.

RS:

SMUD has developed procedures for l'ss of NNI-X, NNI-Y and o

both NNI-X and Y.

These procedures are presently being revieved and revised to incorporate the instrumentation being installed this refueling outage. Prior to completion of the refueling outage, all operators will receive training in the new procedures and

. refresher training in the methods of restoring failed NNI power supplies.

.s g.

CR-3: Move 120 V ICS X power to a vital bus.

RS: At Rancho Seco, NNI-Y, NNI-X and the ICS power supplies receive their input power from both a vital bus, Class I, 118 VAC battery backup inverter and a Class II, 118 VAC battery backup inverter.

Figure 4 attached is a typical diagram of either NNI or ICS, power supplies.

There are two +24 V power supplies, one being supplied from the vital bus and one supplied from the secondary plant bus.

The output from these two +24 V power supplies is auctioneered to supply the load. A loss of either the vital bus supply or the secondary supply will therefore not cause a loss of +24 V.

This explanation is the same for the -24V supply.

The NNI-X, NNI-Y and ICS power supplies are installed in this manner.

The 118 VAC power supply for NNI or ICS is protected through an auto-transfer switch. This is shown on Figure 4.

The auto-transfer switch normal 111eup is to the vital bus supply.

On decreasing voltage (100V), the auto-transfer switch transfers to the secondary plant bus.

This transfer is alarmed in the control room and local indicating lights display from which source the auto-transfer switch is receiving power. Operator action'is required to reposition the auto-transfer back to the vital bus.

m e,-

m

h.

CR-3:

Initiate more extensive pregram for events recorder system.

RS:

Rancijo Seco utilizes a Bailey 855 computer system.

The softuare for this system is updated and verified to be operable each refueling outage by a Eailey Meter Company representative.

This includes the post trip review portion.

In addition, SMUD is installing a new computer system.

This new systeh will be a backup to the Bailey 855.

This new system has an independent post trip review capability, thereby providing Rancho Seco with two independent post trip recording packages.

It is expected that the new system will be operable by mid year.

i. CR-3: Provide operator with redundant indication of main plant parameters.

RS: As explained in item 3.1., SMUD is installing instrumentation which is totally independent of either NNI power supply.

This new instrumentation meets the intent of this CR-3 corrective action.

CR-3 AT NEXT REFUELING (SEPTEMBER 1980) PROPOSED CORRECTIVE ACTION j.

CR-3:

Install indication lights on all panels to know if power on panel.

RS: The NNI-Y and NNI-X power supplies have both ampere meters and voltage meters which are tsed to determine that the power

' supply is operating.

The new power supplies for indicating lamps and auxiliary relays will initially have lights on their front panels indicating proper operation. Ampere meters and voltage meters are on order and will be installed in the near future.'

A future modification to the panel doors which house the power supply will be to install clear plexiglass windows, thereby not requiring the unlocking and opening of the panel doors to determine the power supplies are operating.

k.

CR-3:. Quick access to fuses is be ng designed into cabinets.

RS:

Rancho Seco utilizes CLD fuses in UKA self-indicating holders.

If a fuse should fail, the self-indicating holder would illuminate, and the control room would receive an alarm.

Each fuse is labeled indicating the equipment that power source supplies.

The operator is able to quickly determine which fuse has failed by vieuing through the plexiglass panels which will be installed on the cab-inet doors.

1.

CR-3: "odify EP..' pump circuit to start pumps on any low steam generator level signal..

RS: The S::UD representative at the !! arch 4,1980, meeting did not record this corrective action statement in the same context as listed above. The SMUD representative recorded this corrective action as'follows:

" Modify EF punp auto start circuit and reactor trip circuit so that any power failure will not prevent activation on low SC 1cvel."

The EFU pumps at Rancho Seco start on three different signals:

1.

Loss of all. reactor coolant pumps; 2.

Low main feed pump discharge pressure for both pumps (850 psig).

3.

SFAS initiation (1600 psig RCS pressure).

All of these auto starting circuits are independent of NNI and ICS power supplies.

Rancho Seco's EFU pumps do not auto start on reactor trip or low SG level. As a result, no circuit changes are contemplated.

CR-3 LONG TERM PR0p0 SED CORRECTIVE ACTION m.

CR-3:

Investigate upgrade of NNI capabilities - total loss of NNI.

RS: As explained within item 3, Rancho Seco has performed a study and is presently upgradini; both the NNI power supplies and adding instrumentation to the control room which is independent of NNI.

h'ith this upgrade and new instrumentation, Rancho Seco op..ators will be able to respond to a total loss of NNI without repeating the CR-3 transient, n.

CR-3:

Remote shutdown is being designed.

RS: The new instrumentation as explained in item 3 is first routed to the Rancho Seco emergency shutdown panel.

This panel is located on the grade level within the Auxiliary Building in the A, 4160 V switchgear room.

As a result, the remote shutdewn, as stated by CR-3, is being upgraded to be independent of both NNI and ICS power supplies.

o.

CP-3:

Provide backup AC sources to inverters'with automatic transfer.

RS:

Fipure 4, atta'ched, displays the typical arrangement of NNI-Y, NNI-X and ICS power supplies. As can be seen, each of these pcwer supplies receives its primary source of AC supply from a vital bus.

Secondary plant inverters supply backup AC sources.

Therefore, SML'D has already nodified the NNI and ICS power supplies to meet the intent of this CR-3 long-term corrective action..

7.

REQUEST:

Expand your review under IE Eulletin 79-27 to include the impli-cations of the CR-3 event.

Inforra us of your schedule for completion of thic expanded review as discussed on ?! arch 4,1980.

RESP 0;SE:

S,ML'D has perforced an in-depth study of the : NI and ICS power supplies.

As explained within this report, the changes and modifications being instituted at Rancho Seco fully respond to the CR-3 event. A copy of this report will be forwarded to ISE Region V as a supplenent to the SMUD letter of February 22, 1980, which was the response to IE Eu'.letin 79-27.

SMUD, therefore, feels the expanded review is complete.

9 8

g &

e 0 '

118 VAC 118 VAC INVERTER SUPPLY INVERTER SUPPLY A

A

._ __ T_R I P___ _(-2_2_V)

__q l

l ALARM ALARM iA A

l l

l POWER POWER SUPPLY SUPPLY MONITOR MONITOR POWER POWER POWER SUPPLY SUPPLY SUPPLY 9

2E 3?

Zi V

T

+ 24 VDC

. - 24 VDC

- 24 VDC TO INSTRUMENT SELECTOR SWITCHES, INDICATING LAMPS AND AUXILIARY RELAYS ORIGINAL POWER SUPPLY DISTRIBUTION FIGURE 1 I

..r y.

r----

r - -

e 138 VAC INSTRUMENT POWER SUPPLY

'k 118 VAC -<

>- 118 VAC INVERTER J l

INVERTER D AUTOMATIC TRANSFER SWITCH S1 S2 )

TRIP (22V) l l ALARM I

A l

I POWER POWER POWER POWER POWER SUPPLY SUPPLY SUPPLY SUPPLY SUPPLY N0'NITOR n

n n

es ry es

/\\

/\\

I E

E 2s 2i i

V t

+ 24 VDC

- 24 VDC 1975 POWER SUPPLY MODIFICATION -

FIGURE 2

m 118 VAC INSTRUMEfiT P0' DER SUPPLY Ol 118 VAC INVERTER SUPPLY 118 VAC i d-118 VAC INVERTER J l

JNVERTERD hd AUT0FATIC TEA.'iSFER SWITCll S1 )b S2)(TRIP (22V)

)k TRIP (22V)


]

l vRa A

4 1

l l

n I

i lALARM l

}

P.0WER F0WER I

T SUPPLY SUPPLY POWER E.ITOR POUCR PCWER POWER POWER ggppty SufPLY SUPPLY SUPPLY SUPPLY MONITOR g

-a d

n n

,\\

/\\

/\\

/k

/\\

/k Y

^

l TO INSTRUME!iT SELECTOR SWITCHES, If1DICATING LAMPS AND AUXILIARY RELAYS t

t.

+ 24 VDC 24VDC NNI COMMITTEE RECOMMENDED MODIFICATION FIGURE 3

118 VAC 118 VAC INSTRUMENT 118 VAC FIGURE 4 INVERTER J POWER SUP'LY INVERTER D 1980 POWER SUPPLY MODIFICATION P

k 0

k j-1 AUTOMATIC

_1 TRANSFER g-SWITCH n

I k

TRIP (220 n

l ALARM ALA M l

POWER POWER POWER POWER SUPPLY POWER Poller P0tlER POWER SUPPLY SUPPLY SUPPLY SUPPLY SUPPLY MONITOR SUPPLY SUPPLY MONITOR

~[

[/;[

j n

n es m

n

/\\

/\\

ps

/%

/\\

l 37

)I 1E 5

-24 VDC Y

p i

TO INSTRUMENT SELECTOR

+24 VDC

-24 VDC SMITCHES, INDICATING LAMPS AND AUXILIARY RELAYS 1

.