| Issue date: | 06/09/1977 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Howell S CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML19326D180 | List: |
| References | |
| NUDOCS 8006090601 | |
| Download: ML19326D179 (2) | |
See also: IR 05000329/1977004
Text
f
t
.
O '*
C $
.
,
ICENTRAL FILES ,
\\
p **80%
UfJITED STATES
.
\\'s
NUCLEAR REGULATORY COMMISSION
'-
f$_
r
neanora m
7 ;,hf
j
799 ROOSCVELT RoAO
.
ts . . . . ,f
cLEN ELLYN, ILUNOIS 60137
JUN
91977
'
-
Docket No. 50-329
Docket No. 50-330
--
Consumers Power Company
(MN3 DOCUMENT CONTNNS
POOR QUAUTY PAGES
ATTN:
Mr. Stephen H. Howell
Vice President
1945 West Parnall Road
Jackson, MI 49201
.
Gentlemen:
This refers to the special inspection conducted by Messrs.
D. W. Hayes of this office and R. E. Shewaaker of IE Head-
quarters, Washington, D.C. on May 4, 197', of activities at
the Midland Nucicar Power Plant conc:tru. ion site authorized
by NRC Construction Permits No. CPPR-85 and No. CPPR-82. A
discussion of the findings from the site inspecticn was held
~
with Messrs. G. L. Slagel and D. R. Keating of your staff.
m.,
The enclosed copy of our inspection report addresses the sub-
ject concerning the misplaced and omitted hoop tendon sheaths
in the Unit 1 containment building below the main steam line
penetrations and the , status of the preparation of the Unit 2
containment liner plate bulge area for repair.
Within the
scope of these subjects, the inspection consisted of an exami-
nation of specific records and engineering drawings, obser-
vations and interviews with personnel.
No items of noncompliance with NRC requirements were identified
during the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulationt.,
a copy of this letter and the enclosed inspection report
will be placed in the NRC's Public Document Room, except
as follows.
If the report contains information that you
or your contractors believe to be proprietary, you must
apply in writing to this office, within twenty days of your
receipt of this letter, to withhold such information from
~.,
8006090
-
w
.
.
.-
v
,
._.
,-
(G)
'
Consumero Power Company
-2-
JUll
9 1977
-
'
,
-
!
public disclosure. The application must include a full
'
statement of the rencona for which the information is con-
sidered proprietary, and should be prepared so that
l
propriotary information identified in the application is
I
contained in an enclosure to the application.
We will gladly discuss any qucations you have concerning this
inspection.
-
,
.
Sinceroly,
,
'
-
-
\\
R. F. Heishman, Chief
I.,
Reactor Construction and
(
$
Engincoring Support Branch
,;\\
_
..
f
Enclosure:
IE Inspection
f ' ~'s
Report No. 50-329/77-04
!(,)
and No. 50-330/77-07
ce v/ encl:
~
Mr. Mike Sewell, Nuclear
Licensing Administrator
Central Files
.
Reproduction Unit NRC 20b
,
~'
Local PDR
USIC
~
Ronald Callen,Illchigan Public
Servico Commission
Dr. Wayne E. North
Myron M. Cherry, Chicago
.
/X
)
'
s-
2
RIII g ,_
- I
g
orric e ,
.,
9,
Ilq1 ' man
Shewm er
l
6/7/77
k .a
\\1
Q.
._
. . . _ . _ . . .
. . _ . . .
._
om *