ML19326C563
| ML19326C563 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 07/21/1975 |
| From: | Cavanaugh W ARKANSAS POWER & LIGHT CO. |
| To: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML19326C556 | List: |
| References | |
| NUDOCS 8004230678 | |
| Download: ML19326C563 (2) | |
Text
,
l H E LPIN G B UILO ARKANSAS A RK ANS AS. POWER G LIGHT COM PANY 9,N & LCU1GIAN A ST A..,s. LIT TL. ACCK. A*3K ANS AS 72203. (50U 371-4000 July.21, 1975
=.:=.
- +:
Mr. G. L. Madsen, Chief
.Rcactor Construction 6. Operation Branch p
Office of Inspection 6 Enforcement 0
Nuclear Regulatery Commission' Rcgion IV Arlington, Texas
Subject:
Arkansas Nuclear One -Unit I l.
Docket No. 50-313 L
License No. DPR-51 IE Inspection Report No. 50-313/75-06
[
Centlemen:
[b The subject inspection report identified an item of non-compliance involving the reporting of Unusual Event No. 50-313/75-2. The inspector's finding was that, contrary to Section 6.12.3.2 of the ANO-1 Technical Specifications, the written report'of this event was not submitted within 30 days. The eveat in i
question concerned a possible deficiency in the hydraulic performance of the
.Rcactor Building Spray System which had been identified generically by Bab-
-cock and Wilcox and reported by them on May 8,1975. ' On our receipt of this B 6 W report, we undertook an independent evaluation of the ANO-1 system to i
determine if the event was applicable to ANO-1.
When it was found that this cvaluation would not be complete until mid-August, the matter was discussed in a telecon between your Mr. D. Anderson and our Mr. D. Rueter on June 20.
It was Mr. Anderson's recommendation at that time that a report should be submitted with a followup report to be written upon completion of our evalua-tion.
The report was thus filed on June 25, 1975.
The assignment. of May 8,1975 as the occurren.
Ste was based solely on the fact that on that-date the event was reported to the NRC by B 4 W.
Since we
. were uncertain.of the applicability to ANO-1, the occurrence date should have
. been assigned based on the receipt of the results of our independent evalua-tion.- We believe.that this matter represents merely a procedural technicality and that we were not in violation of our Technical Specification.
However,' to. avoid : future occurrences of this type,.the unusual event reports will be. filed within 30 days following identification of the events applica-8004230 6 l. m. Ab,-.-. _,-,,L.
,1..
,e w L,
7' I
=
l
.g
" T!! *
- ".hh,bk-
~Mr. G. L. Madsen 2-July 21, 1975 ms bility to.ANO-1, and delayed reports, should they occur, will be identified end explained'in_the transmittal letter.
...." ~:
If.you have further comments or_ questions, please advise.
Ve y truly yours f
p:::
y c
. f_
William Cavanaugh III Manager, Nuclear Serv ues WC :DAR:dp -
i a
I' 4
e llA.. ?
I t
i b
+
a S
_ ll.
w-
.... ~.
-