Responds to NRC Re Violations Noted in IE Insp Rept 50-313/75-06.Corrective Actions:Followup Rept Re Deficiency in Hydraulic Performance of Reactor Bldg Spray Sys Filed 750625.Unit Not in Violation of Tech Specs
ML19326C563
Person / Time
Site: Arkansas Nuclear 
Issue date: 07/21/1975
From: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19326C556 List:
References
NUDOCS 8004230678
Download: ML19326C563 (2)


Text

,

l H E LPIN G B UILO ARKANSAS A RK ANS AS. POWER G LIGHT COM PANY 9,N & LCU1GIAN A ST A..,s. LIT TL. ACCK. A*3K ANS AS 72203. (50U 371-4000 July.21, 1975

=.:=.

- +:

Mr. G. L. Madsen, Chief

.Rcactor Construction 6. Operation Branch p

Office of Inspection 6 Enforcement 0

Nuclear Regulatery Commission' Rcgion IV Arlington, Texas

Subject:

Arkansas Nuclear One -Unit I l.

Docket No. 50-313 L

License No. DPR-51 IE Inspection Report No. 50-313/75-06

[

Centlemen:

[b The subject inspection report identified an item of non-compliance involving the reporting of Unusual Event No. 50-313/75-2. The inspector's finding was that, contrary to Section 6.12.3.2 of the ANO-1 Technical Specifications, the written report'of this event was not submitted within 30 days. The eveat in i

question concerned a possible deficiency in the hydraulic performance of the

.Rcactor Building Spray System which had been identified generically by Bab-

-cock and Wilcox and reported by them on May 8,1975. ' On our receipt of this B 6 W report, we undertook an independent evaluation of the ANO-1 system to i

determine if the event was applicable to ANO-1.

When it was found that this cvaluation would not be complete until mid-August, the matter was discussed in a telecon between your Mr. D. Anderson and our Mr. D. Rueter on June 20.

It was Mr. Anderson's recommendation at that time that a report should be submitted with a followup report to be written upon completion of our evalua-tion.

The report was thus filed on June 25, 1975.

The assignment. of May 8,1975 as the occurren.

Ste was based solely on the fact that on that-date the event was reported to the NRC by B 4 W.

Since we

. were uncertain.of the applicability to ANO-1, the occurrence date should have

. been assigned based on the receipt of the results of our independent evalua-tion.- We believe.that this matter represents merely a procedural technicality and that we were not in violation of our Technical Specification.

However,' to. avoid : future occurrences of this type,.the unusual event reports will be. filed within 30 days following identification of the events applica-8004230 6 l. m. Ab,-.-. _,-,,L.

,1..

,e w L,

7' I

=

l

.g

" T!! *

".hh,bk-

~Mr. G. L. Madsen 2-July 21, 1975 ms bility to.ANO-1, and delayed reports, should they occur, will be identified end explained'in_the transmittal letter.

...." ~:

If.you have further comments or_ questions, please advise.

Ve y truly yours f

p:::

y c

. f_

William Cavanaugh III Manager, Nuclear Serv ues WC :DAR:dp -

i a

I' 4

e llA.. ?

I t

i b

+

a S

_ ll.

w-

.... ~.

-