Text
-.
3 :)
n. .:
.
-
.
"
UNITED STATES
NUCLEAR REGULATORY CoMMISSloN
,
OFFICE OF INSPECTION AND ENFORCEMENT
N
REGloN IV
611 RYAN PLAZA oRIVE, SUITE 1000
ARLINGTON, TEXAS lleamz 76011
July 1, 1976
,
Arkansas Power and Light Company
Docket No.
50-313
-
ATTN:
Mr. J. D. Phillips
Senior Vice Presidenc
Sixth and Pine Streets
Pine Bluff, Arkansas 71601
'
Gentlemen:
This refers to the inspection conducted by Messrs D. G. Anderson and
R. Smith of this office on June 16-18, 1976, of activities authorized
by NRC Operating License No. DPR-51 for the Arkansas Nuclear One, Unit 1
facility, and to the discussion of our findings held with Mr. J. W. Anderson
and other members of your staff at the conclusion of the inspe.ction.
O
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
\\s /
of selective examinations of procedures and representative records, inter-
views with personnel, and observations by the inspectors.
During this inspection it was found that certain of your activities were
not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Enclosure (1). This notice
is.sent to you pursuant to the provisions of Section 2.201 of the NRC's
" Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section
2.201 requires you to submit to this office, within 20 days of your receipe
'
of this notice, a written stateoent or explanation in reply including:
(1) corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance; and
(3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If
this report contains any information that you or your contractors believe
to be proprietary, it is necessary that you make a written application
within 20 days to this office to withhold such information from public
disclosure. Any such application must include a full statement of the
reasons on the basis of which it is claimed that the information is
proprietary, and should be prepared so that proprietary information
O)-
l
L
t
j
v
8.004 W 3
-
!
l
!
.-
, _ . .
.- -
.
.
.
. . . - - -
.
-
_
. -
. .
-
.-
.
.
'
.
(
Arkansas Power and Light Company
2-
-
.
identified in the application is contained in a separate part of the
'
document. If we do not hear from you in this regard within the specified
!
period, the report will be placed in the Public Document Room.
i
i
Should you have any questions concerning this inspection we will be
pleased to discuss them with you.
Sincerely,
j
.
G. L. Madsen, Chief
Reactor Operations and
Nuclear Support Branch
Enclosures:
1.
Appendix A - Notice of Violation
,
2.
IE Inspection Report No. 50-313/7.6-07
.
k
i
e
1
4
i
s
,
4
1
.
-
y
y--
-t,
,,.y,.
- + - -
we
--w
g
ea---.
- -
um
mw-
e-s--se-ev=---r=e---------
r+w-w
v--*-m-
e
w+-r----
ew-w=rww-e=ew
---ve-m-w.ev----.
- e