Responds to NRC Re Violation Noted in IE Insp Rept 50-313/76-07.Corrective Actions:Surveillance Test Procedures 1104.02 & 1104.06 Revised to Reflect Actual Nuclear Safety Sys Description & Being Reviewed
ML19326B540
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/20/1976
From: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19326B536 List:
References
NUDOCS 8004160330
Download: ML19326B540 (2)


Text

O; t

Y

.,,,.f

,m g

)

(

n etoo n c e u s e. o an><ansas c: isis ARK ANS AS POWER & LIGHT COMPANY July 20, 1976 Reactor Construction and Operation Branch United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Drive, Suite 1000 Arlington, Tens 70 12 Attention: Mr. G. L. Madsen

Subject:

Arkansas Power 4 Light Company Arkansas Nuclear One - Unit One Docket No. 50-313, Lic-nse No. DPR-51 IE Inspection Report No. 50-313/76-07 Gentlemen:

The subject inspection report identified one violation of the Arkansas

[mv}

Nuclear One - Unit One Technical Specifications. As applicable, our response to the violation includes:

(1) corrective steps which have been taken and results achieved; (2) corrective stsps which will be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved. The NRC position on the cited violation and corresponding APSL redpanse is pro-vided below:

NRC Position Technical Specification 6.7 requires that changes to procedures relating-t to surveillance and testing requirements of systems and components involving nuclear safety shall be reviewed by the Plant Safety Committee and approved by the Superintendent prior to implementation. Technical Specification 6.7 also requires that temporary procedures which do not change the intent of the procedure must be approved by two staff members, one of which must be a shift supervisor. Temporary procedures that change the intent must be approved by the Plant Superintendent.

Contrary to the above, Surveillance test procedures 1104.02 and 1104.06 were changed without evidence of approval.

'Ihis item is an infraction.

APSL Response Procedures 1104.02 and 1104.061 ave been revised to reflect the actual p

system description and are, currently, in the review process.

\\

)

8 0 0 4 I s o33g

t USNRC - Madsen-July 20, 1976 Page Two We have initiated a program to review and update operational surveillance test procedures, as required, to assure that the actual system description is defined therein.

It is our belief that we will be in full compliance with the requirement of section 6.7 of the Arkansas Nuclear One - Unit One Technical Specifica-tion by October 19, 1976.

V ry truly yours p i

~

f!

n liam Cav augh III Assistant Director, er Production j

WC:mcc t

S' 1