ML19326B426

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-313/77-21 on 771114-18 & Notice of Violation
ML19326B426
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 12/07/1977
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
Shared Package
ML19326B415 List:
References
NUDOCS 8004150784
Download: ML19326B426 (2)


See also: IR 05000313/1977021

Text

.

.

.

..

O

UNITED STATES

}

0,

NUCLEAR REGULATORY COMMISSION

,

,

(

611 RYAN P ZA DRIVE.SulTE 1000

Nog /c

ARLINGTON. TEXAS 76011

,

%.%>(/

....

December 7, 1977

Docket No. 50-313

Arkansas Power and Light Company

ATTN: William Cavanaugh III

Executive Director of

Generation and Construction

P. O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Messrs. T. F. Westerman and

M. W. Dickerson of our staff on November 14-18, 1977, of activities

authorized by NRC Operating License No. DPR-51 for the Arkansas Nuclear

One, Unit 1 facility, and to the discussion of our tindings held with

Mr. J. W. Anderson and other members of your staff at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of Facedures and representative

records, interviews with personnel, and observations by the inspecturs.

During this inspection it was found that one of your activities was not

conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Enclosure (1). This notice

is sent to you pursuant to the provisions of Section 2.201 of the NRC's

" Rules of Practice," Part 2, Title 10,-Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within 20 days

of your receipt of this notice, a written statement or explanation in

reply including:

(1) corrective steps which have been taken by you,

and the results achieved; (2) corrective steps which will be taken to

avoid further noncompliance; and (3) the date when full compliance will

be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulatior s, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

-

Room.

If this report contains any information that you or your

G

/

1

O

8004150 M

o

.

.

'

.

Arkansas Power and Light Company

-2-

December 7, 1977

contractors believe to be proprietary, it is necessary that you make

a written application within 20 days to this office to withhold such

information from public disclosure. Any such application must include

a full statement of the reasons why it is claimed that the infonnation

is proprietary. The application should be prepared so that proprietary

information identified in the application is contained in a separate

part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document

Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

fec$w_/

G. L. Madsen, Chief,

Reactor Operations and

O

Nuclear Support Branch

Enclosures:

.

1.

Notice of Violation

2.

IE Inspection Report No. 50-313/77-21

'

'

.

4

.

O

m

-

-

-

._ .

J

.