ML19326B296
| ML19326B296 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/09/1973 |
| From: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Phillips J ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML19326B293 | List: |
| References | |
| NUDOCS 8004140646 | |
| Download: ML19326B296 (2) | |
See also: IR 05000313/1973014
Text
._
_
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_
.
g.V
.
[b p# [ %
UNITED STATES
,
'g
ATOMIC ENERGY COMMISSION
l ! r
,e '
l
DIRECTORATE OF REGULATORY OPERATIC iG
/
,[
.-
REGloM ll - SUsT E 818
O' g
23018E AC MT R E C ST R E ET . NOR T HW E *.?
g - r
I'4 f t 5
'
AT t. A N T A. C E oRG e A 30303
007 9
tp3
In Reply Refer To:
RO:II:MSK
50-313/73-14
Arkansas Power and Light Company
ATTN:
Mr. J. D. Phillips
Vice President and Chief Engineer
Sixth and Pine Streets
Pine Bluff, Arkansas
71601
Gentlemen:
This refers to the inspection conducted by Messrs. W. W. Peery and M. S. Kidd
of this office on September 11-14 and 25-28, 1973, of activities authorized by
AEC Construction Permit No. CPPR-57 for the Arkansas Nuclear One, Unit 1
facility, and to the discussion of our findings held by Messrs. Peery and Kidd
g
)
with Mr. J. W. Anderson and other members of your staff at the conclusion
v
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of selective examination of procedures and representative records,
interviews with personnel, and observations by the inspectors.
Within the scope of this inspection, no violations were disclosed.
,1
We have also examined actions you have taker with regard to previously
j
identified enforcement matters and unresolved items. The status of
1
these items is identified in Sections II and IV of the summary of
the enclosed report.
Three new unresolved items resulted from this inspection and are
identified in Section III of the summary of the enclosed report.
l
These items will be examined during subsequent inspections.
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,
,
Title 10, Code of Federal Regulations, a copy of this letter and the
l
enclom-d inspection report will be placed in the AEC's Public Document
Room. li this report contains any information that you believe to be
l
.
_
800414047g
_
. ..
.
.
.
.
.
.
g
m
,
\\
Arkansas Power and Light
-2-
OCT 9
19 ? 3
'
,
Company
.
proprietary, it is necessary that you submit a written application to
this office requesting that such information be withheld from public
disclosure.
If no proprietary information is identified, a written
statement to that effect should be submitted.
If an application is
submitted, it must fully identify the bases for which information is
claimed to be proprietary. The application should be prepared so that
information sought to be withheld is incorporated in a separate paper
and referenced in the application since the application will be placed
in the Public Document Room. Your application, or written statement
should be submitted to us within 20 days.
If we are not contacted as
specified, the enclosed report and this letter may then be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad
to discuss them with you.
Very truly yours,
'
Mosele,y 'f,L-
Norman C
'
Director
Enclosure: