ML19326A789

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-302/69-01 on 690123-24.Noncompliance Noted
ML19326A789
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/19/1969
From: Long F
US ATOMIC ENERGY COMMISSION (AEC)
To: James O'Reilly
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19326A790 List:
References
NUDOCS 8003040750
Download: ML19326A789 (1)


Text

{{#Wiki_filter:.e 9* UNITED STATES ~ [ ) t ATOMIC ENERGY COMMISSION e e I DIVISIGN OF COMPLIANCE ( '[ REGloN 11 - SUITE 818 e 230 PE ACHTREE STREET, N OR T H W E ST

    1. 3Ttt 6% g Tm 526-4537 AT LANT A, GEORGI A 30303

! N #4 E P I,Y REFERTot FEB 1313b3 J. P. O'Reilly, Chief, Reactor Inspection and Enforcement Branch Division of Compliance, Headquarters FLORIDA POWER CORPORATION (CRYSTAL RIVER NO. 3), LICENSE NO. CPPR-51, DOCKET No. 50-302 Transmitted herewith for information is Compliance Report No. 302/69-1 covering a routine inspection on January 23-24, 1969. There was one item of nonconformance observed relating to a change in the foundation design. This was a substitution of 1500 psi concrete for crushed lime rock. The licensee stated this would be justified in the FSAR. We believe concrete is more desirable for this application. We anticipate some problems in the area of site quality control due to i inexperience of existing personnel in nuclear-tyre work. We will con- -{ j tinue to follow this matter. ~ .1 s g CO:II:FJL Senior Reactor Inspector

Enclosure:

CO Report No. 302/69-1 (Bryant) cc: E. G. Case, DRS R. S. Boyd, DRL (2) S. Levine, DRL (6) D. J. Skovholt, DRL (3) L. Kornblith, Jr., CO R. W. Kirkman, CO:I B. H. Crier, CO:III D. I. Walker, CO:IV R. W. Smith, CO:V

l. r,.

REG Files '1.~ l :ic I ~ .L,', 4 (] m gt 9 0524

,n,,,.<,...

N .[ 8008040 k O p}}