ML19326A789
| ML19326A789 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/19/1969 |
| From: | Long F US ATOMIC ENERGY COMMISSION (AEC) |
| To: | James O'Reilly US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19326A790 | List: |
| References | |
| NUDOCS 8003040750 | |
| Download: ML19326A789 (1) | |
Text
{{#Wiki_filter:.e 9* UNITED STATES ~ [ ) t ATOMIC ENERGY COMMISSION e e I DIVISIGN OF COMPLIANCE ( '[ REGloN 11 - SUITE 818 e 230 PE ACHTREE STREET, N OR T H W E ST
- 3Ttt 6% g Tm 526-4537 AT LANT A, GEORGI A 30303
! N #4 E P I,Y REFERTot FEB 1313b3 J. P. O'Reilly, Chief, Reactor Inspection and Enforcement Branch Division of Compliance, Headquarters FLORIDA POWER CORPORATION (CRYSTAL RIVER NO. 3), LICENSE NO. CPPR-51, DOCKET No. 50-302 Transmitted herewith for information is Compliance Report No. 302/69-1 covering a routine inspection on January 23-24, 1969. There was one item of nonconformance observed relating to a change in the foundation design. This was a substitution of 1500 psi concrete for crushed lime rock. The licensee stated this would be justified in the FSAR. We believe concrete is more desirable for this application. We anticipate some problems in the area of site quality control due to i inexperience of existing personnel in nuclear-tyre work. We will con- -{ j tinue to follow this matter. ~ .1 s g CO:II:FJL Senior Reactor Inspector
Enclosure:
CO Report No. 302/69-1 (Bryant) cc: E. G. Case, DRS R. S. Boyd, DRL (2) S. Levine, DRL (6) D. J. Skovholt, DRL (3) L. Kornblith, Jr., CO R. W. Kirkman, CO:I B. H. Crier, CO:III D. I. Walker, CO:IV R. W. Smith, CO:V
- l. r,.
REG Files '1.~ l :ic I ~ .L,', 4 (] m gt 9 0524
- ,n,,,.<,...
N .[ 8008040 k O p}}