ML19326A733

From kanterella
Jump to navigation Jump to search
Ack Receipt of Forwarding Deficiency Rept Re Low Strength Concrete Pour on Reactor Bldg Dome
ML19326A733
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/02/1974
From: Jennifer Davis
US ATOMIC ENERGY COMMISSION (AEC)
To: Rodgers J
FLORIDA POWER CORP.
Shared Package
ML19326A734 List:
References
NUDOCS 8003030872
Download: ML19326A733 (1)


Text

(

l

\\

.. UNITED STATES RJ w,, ay 7*'

ATOMIC ENERGY COMMISSION c

wassincron. o.c. res.s AUG 2 1974 Florida Power Corporation Docket No. 50-302 ATTN: Mr..J. T. Rodgers Assistant Vice President Generation Engineering 3201 34th Street, South P. O. Box 14042 St. Petersburg, Florida 33733 i

Gentlemen:

.l Thank you for your letter dated July 11, 1974 which forwarded a final report regarding the low strength concrete pour (L-9)

f. ;

on the Crystal River 3 reactor building dome, submitted in accordance with 10 CFR 50.55(e). Your report will be reilewed and evaluated and, should we require additional information on this matter we will contact you.

~

Your cooperation is appreciated.

Sincerely, I

l

-h

. m

..e Jo n G. Davis, Deputy Director for Field Operations Directorate of Regulatory Operations

- l j

,t 8003030 8

,/

_ _.