ML19326A418

From kanterella
Jump to navigation Jump to search
Ack Receipt of 740502 Interim Deficiency Rept Re Reactor Pump Suction Field Weld Linearly Disposed Indications at Facility
ML19326A418
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/12/1974
From: Jennifer Davis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Roe L
TOLEDO EDISON CO.
References
NUDOCS 8002030219
Download: ML19326A418 (1)


Text

.

~.

..~

a i

s

,1 s 5_

'1 UNITcD STATES J,

ATOMIC ENERGY COMMISSION

  • .. i".

'~

p W ASHINGTON. D.C.

2C545

".?

' Qd')

's t

s.

EL 12 U74 4

ocket Eo. 50-346 Toledo Edison Company ATTN:.Mr. Lowell E. Roe Vice President Edison Plaza r

300 Madison Avenue l

Toledo, Ohio 43652

~-

Gentlemen:

i Thank you for your letter dated May 2, 1974, which forwarded

~

an interim report pursuant to 10 CFR 50.55(e) regarding the reactor coolant pump suction field weld linearly disposed

[

. indications at the Davis-Besse Nuclear Power Station. Your

)

interin report uill be reviewed and evaluated and, should we 1

require additional information concerning this matter, we l-will contact you.

j l

i Your cooperation concerning this matter is appreciated.

4 b

Sincerely, i

l.

--l 4G9 L:..

' John G. Davis, Deputy Director for Field Operations e

i Directorate of Regulatory Operations a

4 k

1 i

8 s

e.

n.

. k f a l' L{

w

)

8 o 02 030;;uf L

i-

,_..__,-___._._.._,...____,.m-,,,,,

4 TOLEDO

%ms EDISON May 2,1974 LC% ELL E. ACE Vice President. Power (4131 259-5242 Docket No. 50-346 Mr. Donald F. Knuth, Director Directorate of Regulatory Operations Office of Regulation U. S. Atomic Energy Commission Washington, D.C.

20545

Dear Mr. Knuth:

This letter is submitted as an Interim Report regarding reactor coolant pump suction field rw) weld linearly disposed indications at the Davis-Besse Nuclear Power Station as reported

(

N>

to the Directorate of Regulatory Operations Region III by my letter of April 2,1974.

The study as to the cause of the referenced discontinuities is now underway using a weld mock-up of the field conditions. Upon completion of this study, a definitive report will be submitted to your office in accord with 10 CFR Part 50.55.

No further welding on the reactor coolant pump suctions is being conducted; repairs are being withheld until the investigation is complete and satisfactory resolution determined.

Yours very truly,

]

bjo ee/l cc:

J. G. Keppler, Regional Director Dimetorate of Regulatory Operations Region III g,-

(%

J C) pj96

(

900/30069y 4 1653 THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. CHIO 43652