ML19326A099
| ML19326A099 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 12/07/1971 |
| From: | Grier B US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Sampson G TOLEDO EDISON CO. |
| Shared Package | |
| ML19326A100 | List: |
| References | |
| NUDOCS 8001310663 | |
| Download: ML19326A099 (1) | |
Text
~
- '+,.
UNITED STATES ATOMIC ENERGY COMMISSION
)
j *.-
DIVISION OF COMPLIANCE f
REGION Ill
/;,
v s
799 ROOSEVELT ROAD Ull O -
GLEN ELLYN, ILLINots 60137 December 7, 1971 Toledo Edison Conqpeay Docket No. 50-346 ATTNr Mr. Glenn J. Sampson Vice President, Power 300 Madison Avenue Toledo, Chio 43652 Gent 1==== :
Thank you for your letter deced December 2,1971, informing us of the stepe you have teken to correct the items of apparent noncompliance end nonconformance which we brought to your attention in our letter deced November 5, 1971. He will ev==4na these matters during our next inspection.
Your cooperation with us is appreciated.
Sincerely yours, Boyce H. Grier Regionel Director cc:
L. E. Roe, Project Engineer N. L. Uedauerth, General Superintendent J. A. Ianardson, Q& Engineer bec: J. B. Henderson, CO (6)
A. Giambusso, CO L. Kornblith, C0 R. H. Engelken, C0 DR Central Files
(_
8 001 s1o d63 1 5185 k
.