ML19325F166
| ML19325F166 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 11/06/1989 |
| From: | Bradfute J Office of Nuclear Reactor Regulation |
| To: | Kovach T COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19325F167 | List: |
| References | |
| GL-83-28, TAC-53994, TAC-53995, NUDOCS 8911140340 | |
| Download: ML19325F166 (2) | |
Text
.
_ ~ ~ _ _
November 6, 1989 s
=
Docket Nos. 50.?73 and 50 374 listribution mceet rue NRC & Local PORs Er. Thomt, J. Kovach PDIII.2 r/f G. Holahan Nuclear Licensing Manager L. Luther J. Bradfute Comonwealth idison Company OGC E. Jordan Post Office Box 767 B. Grimes ACRS (10)
Chicago, Illinois 60690
- 8. Mosafari P. Shemanski
Dear Mr. Xovach:
SUBJECT:
SAFETY EVALUATION FOR GENERIC LETTER 83 28, ITEM 4.5.3, kEACT0k TRIP RELIABILITY. ON.LINE FUNCTIONAL TESTING OF THE REACTOR TRIP SYSTEM (TAC NOS. 53994 and 53995) i Generic Letter 83 28 Item 4.5.3, required confirmation from all licensees and applicants that on line fynctional testing of the reactor trip system, including independent testing of the diverse trip feature, was being parformed.
Dy letters dated May 16. 1985 and August 6, 1985 you submitted responses to Generic Letter 83 28, item 4.5.3.
Therein you indicated your endorsement of the BWR Owners' Groups Report hiDC.30844, as being applicable to LaSalle County Station Units 1 and 2.
The NRC staff, with the assistance of our t
contractor, Idaho National Engineering Laboratory, has reviewed your responses and the BWR Owners Group's report. We conclude that the existing intervals for on line functional testing at LaSalle 1 and 2 are consistent with achieving high reactor trip system availability, and the Commonwealth Edison Company response to Item 4.5.3 of Generic Letter 83 28 is therefore acceptoble for LaSalle County Station Units 1 and 2.
The enclosed safety evaluation and contractor's report (EGG-NTA 8341) provide the details and basis for our conclusion.
This completes all staff activities related to TAC Nos. 53994 and 53995.
Sincerely Original singed b>/
GM l
John 0. Bradfute, Project Manager i
Project Directorate 111 2 Division of Reactor Projects - Ill, IV, Y and Special Projects
Enclosure:
As stated Ed cc w/ enc 1: See next page
- PD 111 2m PD 111-2:
- PD III-2a
.........:............:..f.,y,......:........ph::............::...
L. Luther
- J. Bradfu e
- P. Shemenski 11/4/89
- 11/ (,/89
- 11/(,,/89
~
0FFICIAL RECORD COPY Document Name:
K0VACH.2 l
@11140340 891106 ADOCK0500gdj3 DR
_m_--
l
..s
. s Mr. Thomas J. Kovach LaSalle County Nuclear Power Station Cosmonwealth Edison Company Units 1 8 2 I
i cc:
Phillip P. Steptoe, Esquire Jchn W. McCaffrey
{
$1dley and Austin Chief. Public Utilities Division One First National Plara 501',
Chicago, 1111ncis 60603 100 Wess Aandolph Street Chicago, Illinois 60001 Assistant Attorney General l
100 West Randolph Stree' Suite 12 i
Chicago, Illinois 60601 i
Resident Inspector /LaSalle, NPS i
U.S. Nuclear Regulatory Comission Rural Route No. 1 P. 0. Box 224 Marseilles, Illinois 61341 Chairman LaSalle County Boart of Supervisors LaSalle County Courthouse i
Ottawa, 1111 riots 61350 i
Attorney Gener61 l
500 South 2nd Street Springfield, Illinois 62701 Chairman Illinois Cosserce Comission Leland Building 527 East Capitol Avenue Springfield, 1111rois 62706 Mr. Michael C. Parker, Chief Division of Engineering i
Illinois Department of Nuclear Safety i
1035 Outer Park Drive 6th Floor Springfield, Illinois 62704 Regional Administrator, Region III U. S. Nuclear Regulatory Comission 799 Roosevelt Road, Bldg. #4 Glen Ellyn, Illinois 60137 1
6
.es,-+
y
,,..a
-r,-
.-m,.
-.-ew
,-w.-
e n+-,
--.