Text
ri
gT
'
-
4
e
. ,
,
,
.
'.
'
t.
.;
,
p. 3.;
'
,
In Reply Refer To:
iTE - 1 1589
'
'
,
.' * Docket:
50-382/89-24
7y
7..
k.
- Louisiana Power & Light Company
ATTN:
J. G. Dewease, Senior Vice President
4
Nuclear Operations
317 Baronne Street-
'
New Orleans, Louisiana 70160'
.
Gentlemen:
This refers to the team inspection conducted by Mr. Nemen M. Terc of this
m
office and other accompanying personnel during the period August 29 through
September 1, 1989, of activities authorized by NRC Operating License NPF-38 for
,
' Waterford-3, and to the discussion of our findings with you and other members
of your staff at the conclusion of the inspection.
Areas examined during the inspection included the implementation of the'
emergency plan and procedures during the annual emergency response exercise.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the inspection team. The inspection findings are documented in
the enclosed' inspection report.
Within the scope of the inspection, no violations or deviations were
,
identified.
~
s
The enclosed report identified four exercise weaknesses in your emergency
preparedness program. Weaknesses involved:
a delay in notifying the NRC; a
degraded flow of information between the control room and the technical support-
center (TSC);' an instance of lack of technical support from the TSC to dose
assessors;,and an -instance of lack ~of adequate coordination of'in plant repair
teams by the operational support center.
1
Exercise weaknesses according to 10 CFR Part 50,: Appendix'E.IV.F.5, are
>
. inspection findings that need to be corrected by thenlicensee.
You are
' requested to provide this office with a description of your corrective measures
and your schedule >for completing these actions within 30 days after receipt of
b
this letter.
,
,
,
ui
'
We have also examined actions you have taken with regard to previously
-
n
- identified inspection firdings.
The status of these items is identified in
i
l.
paragraph 2 of the' enclosed report.
.
,
P
N
F
!:SEPS
C:SEPSM
SD:0RSS
. D:DRP
Kfm
DAPowers
ABBeac 'q q fJLMilhoan
-* v* /89
/0/p//89
' go /)Q'89
/d /a /89
P
t\\
g.11%$AIk.M2
g
a
e ,
g.
-
- _ - -
,
k.
i-
'
/
,'
.
'f
.
f'
Louisiana Power & Light Company
-2-
!
r
,,
'
l
'
Should you have any questions concerning this inspection, we will be pleased to
'
discuss them with you.
Sincerely,
[
%DO)
OI.'
.
James L. M11hoan, Director
[
1:
Division of Reactor Projects
e
Enclosure:
!,
Appendix - NRC Inspection Report
L
50-382/89-24
!
L
cc w/ enclosure:
'
Louisiana Power & Light Company
ATTN:
R. P. Barkhurst, Vice President
Nuclear Operations
P.O. Box B
Killona, Louisiana 70066
Louisiana Powe.r & Light Company
- ATTN:
J. R. McGaha, Jr., Plant Manager
i lo
ouisiana 70066
Louisiana Power & Light Company
ATTN:
L.-W. Laughlin, Site
Licensing Support Supervisor
P.O. Box B
K111ona, Louisiana 70066
Louisiana Power & Light Company
ATTN:
G. M. Davis, Manager, Events
Analysis Reporting & Response
P.O. Box B
Killona, Louisiana 70066
i
Monroe & Leman
ATTN:
W. Malcolm Stevenson, Esq.
201 St. Charles Avenue, Suite 3300
New Orleans, Louisiana 70170-3300
Shaw, Pittman, Potts & Trowbridge
ATTN: Mr. E. Blake
2300 N Street, NW
Washington, D.C.
20037
'
- .
_
_
. _ _ _ - _ _ .
.
'
,
l. ' (
!.
.
3
Louisiana Power & Light Company
3-
-
.
!
i
!
U.S. Nuclear Regulatory Commission
ATTN:
Resident inspector
,
P.O. Box 822
!
K111ona, Louisiana .70066
!
[
Middle South Services, Inc.
,
'
i.
ATTN:- Ralph T, Lally, Manager
L
of Quality Assurance
1
P.O. Box 61000
New Orleans, Louisiana 70161
,
!
Chairman
.i
Louisiana Public Service Commission
i
One American Place, Suite 1630
,
Baton Rouge, Louisiana 70825-1697
i
Louisiana Power & Light Company
ATTN:
R. F. Burski, Manager, Nuclear
Safety and Regulatory Affairs
317 Baronne Street
l
New Orleans, Louisiana 70112
l
U.S. Nuclear Regulatory Commission
I
ATTN:
Regional Administrator, Region IV
611 Ryan Plaza Drive. Suite 1000
Arlington, Texas. 76011
'
Office of Environmental Affairs
I
ATTN: ~ William H. Spell, Administrator
Nuclear Energy Division
P.O. Box 14690
-
Baton Rouge, Louisiana 70898
i
.
President, Police Jury
St. Charles' Parish
Hahnv111e, Louisiana 7')057
r
!'
Mr. William A. Cross-
Bethesda Licensing Office
3 Metro Center
Suite 610
-
Bethesda, Maryland 20814
!
Chief, Technological Hazards Branch
.
FEMA Region 6
Federal Center
!
'
800 North Loop 288
i
Denton, Texas 76201-3698
l
!
'
,
1
1
.
,-- -
e
- .,
n.,--,,,.
. , _
.-
. - . . - -
,
-
,, , - .
-
1
,
c-
,
-
- -
,-
,.
- -
-
.
,
r
Louisiana Power & Light Company-
-4-
l
-
r
!
r
I
. bec to DMB (IE35)
!
L
bec distrib. by RIV:
,
)
- RRI
,
- R. D. Martin,.RA
r
'Section-Chief (DRP/A)-
- DRP
!
i.
L*DR$$
' MIS System
l
l"
- Project Engineer (DRP/A)
- RSTS Operator
,
.
'*RIV File
- DP.S
.i
- D. Wigginton, NRR Project Manager (MS:
13-D-18)
r
l.
Lisa Shea, RM/ALF
'
- Section Chief (SEPS)
-
" Inspectors
- Division Director (DRSS)
!
r
- C, Hackney
[
.
!
r
I.
- w/766
'
r
,
,
I.
'
'
t
[
i.
'
,
)
I
!
b
.
t
!
.
i
'I
!
t
I'.
i
L
1
[
t
l-
5
t
'
.[
,
i
'
J.'
i
!
f
!
- f
L
i
'!
r
i
.:
'!
l
I
i
I
_
,
..
. .,
. _ . _ ,
.
. . . .
. . .
. . . .
. .